Search Documents

  • ISEE
    Concrete Bridge Pier Removal in an Environmentally Sensitive River

    By Paul Kunze

    When a new bridge was needed across the upper reaches of the Yellowstone River in Montana, removing the old concrete bridge piers became an environmental concern for the highway department engineers.

    Jan 1, 2014

  • SME
    Regulatory Changes Improve Alaska’s Mining Climate

    By Steven C. Borell

    For more than a decade, changes have occurred each year that have improved the regulatory and business climate for mining in Alaska. These changes have taken place during Republican and Democratic go

    Jan 1, 2004

  • ISEE
    Blast Designs and Instant Diagnostics Using the SVC1000 Digital, High-Speed Smart Video Camera System

    By Bruce Vandenberg, Andy Bartfay-Szabo, Steve Conway

    Recent advances in solid-state, field portable, fast framing video camera systems and PC based frame capture hardware now allow blast imaging up to 500 frames per second. Up to 8 seconds of data can b

    Jan 1, 1995

  • SME
    Practical Aspects Of Cathodoluminescence Petrography Applied To Alkali Syenite And Carbonatite

    By H. L. Barwood

    Luminescence excited by electron bombardment, or cathodoluminescence (CL), is a very useful tool in petrographic examination of rocks, minerals and ores. Differences in luminescence colors and intensi

    Jan 1, 2001

  • AIME
    Cheap Bonneville Power Should Attract ElectrometallurgicaI Industries

    By Walter W. R. May

    FOR more than 25 years a few business men who represent virile private enterprise in the Pacific Northwest have been trying to awaken the community to the potential benefits of an open Columbia River.

    Jan 1, 1940

  • NIOSH
    OFR-158-81 Ground Fault And Overcurrent Protection Criteria For Coal Mine AC Distribution Systems

    By John A. Kiefer

    Ground fault and overcurrent protection criteria for coal mine a.c. distribution systems were examined under a Bureau of Mines funded investigation. The report begins with a literature review which di

    Jan 1, 1980

  • ISEE
    Presplitting Techniques and Field Controls

    The objective in controlled blasting is to reduce overbreak to control the final pit wall slope, shaft, drift ditch, bench, etc. to the final planned excavation limit. The six main types of controlled

    Jan 1, 1992

  • CIM
    High-pressure direct injection of natural gas in a diesel engine for high performance/low emissions (ace69f9b-8abb-4cd4-9306-9db2c42ce4ca)

    By K. B. Hodgins, P. Ouellette

    "The North American mining industry faces challenging emissions regulations in the coming years with the introduction of new standards for off-road diesel engines. In order to remain competitive, indu

    Jan 1, 2005

  • SAIMM
    Setting The Scene: Rockpass Accident Statistics And General Guidelines For The Design Of Rockpasses

    Records over the past ten years indicate that there is potential for serious multiple accidents due to engulfing associated with rockpasses. Significant attention is not usually given to the design of

    Jan 1, 2005

  • AIME
    Papers - Cleveland Meeting – September, 1929 - Foreign Iron Ores (With Discussion)

    By Charles Hart

    In this paper it is the author's intention to show the extent and character of foreign ores now known to be available; these deposits may be in active production or held in reserve until economic

    Jan 1, 1929

  • SME
    Caterpillar Adds to its Mining Line; New Haul Trucks Fill Out the Surface Mining Portfolio

    By William Gleason

    "Caterpillar is the largest manufacturer of mining equipment in the world. In hundreds of surface mines around the globe, Caterpillar’s flagship 793 haul trucks can be found moving material for copper

    Dec 1, 2018

  • NIOSH
    OFR-130-78 Time Resolved Audio Dosimeter System

    By Gordon R. Sima

    This contract is concerned with the construction of a Time Resolved Audio Dosimeter System consisting of one readout unit and several dosimeter units. The Time Resolved Audio Dosimeter System was desi

    Jan 1, 1977

  • AUSIMM
    Application of X-ray Diffraction to Iron Ores - Potential Implications for Grade Control and Downstream Processing

    The steps for the beneficiation of iron ores differ from ore to ore, depending on the mineralogical phases of the particular iron ore and the nature of the association of the gangue minerals with iron

    Aug 12, 2013

  • DFI
    Drilled Piers In Coastal Plain Deposits

    By J. Allan Tice

    In the past fifteen to twenty years, the use of drilled piers to support high capacities in coastal plain deposits has become more and more common. With improved construction techniques and better und

    Jan 1, 1988

  • SME
    Cresson Mine Completes Two-Year Expansion

    By William R. Yernberg

    The Cripple Creek & Victor Gold Mining Co.(CC&V) celebrated completion of a two-year, $168.5-million expansion and capital improvement program. An open house celebration was held in the historic mini

    Jan 1, 2002

  • AUSIMM
    Implementation of Advanced Transfer Chute Designs

    By N van Aarde, B A. Moore, S van der Merwe

    Frequently materials handling operations are compromised by transfer chute problems ranging from high wear rates, blockages and ineffective loading of the downstream conveyor. This paper will present

    Aug 12, 2013

  • DFI
    Session II - Industry Trends And Up And Coming Innovations - Reflections On Our Industry - Foundation Vs Geotechnical

    By Arturo Ressi di Cervia

    From the times when men in lacustrine environments drove wooden piles into the mud to elevate their dwellings, until the beginning of the twentieth century builders reacted to the conditions found in

    Jan 1, 2000

  • RMCMI
    Proceedings of the Fiftieth Regular Meeting of the Rocky Mountain Coal Mining Institute Glenwood Springs, Colorado - Morning Session Monday, June 28, 1954 - President's Address

    By J. R. Kastler

    It becomes my pleasant duty to call the meeting to order. This is our fiftieth regular meeting. And the session we are opening today, I am sure: will be as interesting and informative as those in the

    Jan 1, 1954

  • SAIMM
    The Recovery Of Copper From A Pregnant Sulphuric Acid Bioleach Solution With Developmental Resin Dow XUS43605 - Synopsis

    By C. J. Liebenberg

    This paper focuses on the application of ion exchange technology for the recovery of copper from a leach solution originating from a heap bioleach in which base metals are leached from a low-grade ore

    Jan 1, 2013

  • SME
    High Performance Tunnel Boring Machine for Kárahnjúkar Headrace Tunnel, KAR-14—A Design and Case History

    By Brian Khalighi, Massimo Franceschi, Giovanni Giacomin, Gianni Porta

    Headrace Tunnels and parts of the Access Adit Tunnels of Kárahnjúkar Hydropower project, KAR-14, in Iceland will be excavated using three full-face Robbins Tunnel Boring Machines (TBM). TBM sizes rang

    Jan 1, 2005