Search Documents

  • IOM3
    Three-dimensional modelling of fill drainage in mine stopes

    By L. T. Isaacs, W. H. Traves

    A numerical model for analysing the drainage of fill in mine stopes has been described. The model can be used to analyse the process of fill drainage in existing and proposed mine stopes. The validity

    May 1, 1991

  • DFI
    Use of Menard Pressuremeter Test Results to Predict a Bearing Capacity and Settlement of Bored Piles

    By Ramdane Bahar

    "Abstract The design foundations can be performed using Menard pressuremeter rules that require a limit pressure and a pressuremeter modulus. In recent years, another trend of interpretation of this t

    Jan 1, 2014

  • AUSIMM
    Bioheapleaching of Black Schist-Hosted Nickel-Copper-Cobalt- Zinc Ore in Subarctic Conditions at Talvivaara, Finland

    Talvivaara deposits, Kuusilampi and Kolmisoppi, comprise one of the largest sulfide nickel resources in the world with 642 Mt in Measured and Indicated Resource categories. TalvivaaraÆs preferred extr

    Jan 1, 2009

  • AUSIMM
    Metallurgical Fuel from Victorian Brown Coal

    A hard lump char containing only 4 to 5 per cent ash, 0·25-0·30 per cent sulphur and a trace of phosphorus has been produced from Latrobe Valley brown coal by slow drying and carbonization o

    Jan 1, 1956

  • SAIMM
    The Use Of High-Pressure, Water-Hydraulic (Hydropower) Technology In South African Narrow-Reef Hard-Rock Mines (f75f8c8a-0a94-4f31-974d-db3720274473)

    This paper examines the new water-hydraulic (hydropowered) drill rigs that have been developed and proven in the last decade primarily in tabular, shallow-dipping, narrow-reef hard-rock South African

    Jan 1, 2012

  • ISEE
    Deep water excavation with shaped charges: a case history in Lake Mead, Boulder City, Nevada, USA

    By Roberto Folchi, Hans Wallin

    Lake Mead, the largest man-made reservoir in the United States, is located about 30 miles southeast of Las Vegas, Nevada. For the construction of Lake Mead third water intake, which is entirely placed

    Jan 1, 2012

  • SME
    Driving Point Impedance—A New Paradigm For Detecting Fracture And In Situ Stress In Boreholes

    By D. M. Weinberg, S. R. Novascone, R. R. Reynolds, J. H. Cole, C. D. Christensen

    The mechanical properties of the rocks surrounding an orbital vibrator alter the shape and amplitude of the vibrator’s orbit. Detecting these changes with driving point impedance measurements promises

    Jan 1, 2002

  • NIOSH
    OFR-161(2)-81 Appendix Volume - Control Of Water Pollution From Surface Mining Operations

    By David R. Jessey

    This volume contains the detailed mine site reports written by the WAPORA, Inc. and KETRON, Inc. staffs. It is a companion Appendix Volume to Control of Water Pollution from Surface Mining Operations.

    Jan 1, 1981

  • CIM
    Making it Happen at DeBeers Canada

    By Ingrid Hann

    The Triple Bottom Line ? Economic Sustainability ? Creation of Joint Venture companies ? Planned evaluation of other kimberlites ? Social Sustainability ? Impact Benefit Agreement and Participati

    May 1, 2008

  • AUSIMM
    Excellence in Professional Training for the Mining Industry - A Challenge for Tertiary Institutions

    The theme of the conference is "excellence", an epithet of special significance in tertiary education. It appears in the mission statements, goals and plans to achieve them of most, and quite possi

    Jan 1, 1989

  • SME
    Liner System Protects Oils Sands’ Tailings Area

    Syncrude Canada produces a large part of Canada’s crude oil supply. The company processes about 225,000 bbl/day. The oil produced is used for jet and automobile fuel, home heating oil, plastics and

    Jan 1, 2000

  • SAIMM
    The Design Of A Single Aggregate Concrete On Cullinan Diamond Mine

    A single aggregate mix design was developed based on a slag/Portland binder blend and crusher sand. The primary design criterion, after performance, was the fluidity of the shotcrete and concrete prod

    Jan 1, 2006

  • SME
    Construction Of Pacific Gas And Electric Company's Kerckhoff-2 Underground Hydro-Electric Project 1980-1983

    By Earl M. Woodward

    INTRODUCTION Kerckhoff-2 is a 140 MW underground hydro-electric project designed and owned by Pacific Gas and Electric Company and constructed between May, 1980 and May, 1983 by Auburn Constructors

    Jan 1, 1983

  • NIOSH
    RI 4199 Reduction of Phosphorus Content in Iron Ore and Concentrate from Iron Mountain, Mo.

    By H. Kenworthy

    "INTRODUCTION ..Although the occurrence of iron ore in Missouri was recognized by Marquette as early as 1673, the first known mining and smelting operation was conducted in 1815. This operation was ne

    Feb 1, 1948

  • CIM
    Maintenance management control through utilization of a computerized system at the Key Lake project

    By T. Warren, R. Pender

    "Significant strides have been made during the past decade to integrate the traditionally separate administrative functions of financial management, materials management and maintenance management.In

    Jan 1, 1990

  • CIM
    Inflation in project evaluation

    By L. D. Smith

    "Those who submit competing proposals for projects seek to present senior management with complete and fully supported material that will not fail under questioning. Hopefully, misleading notions and

    Jan 1, 1987

  • NIOSH
    OFR-2(2)-81 Selection And Inspection Guide For Wire Rope Terminations

    By F. Matanzo

    This guide considers only nine of the many wire rope terminations used in the mining industry so use of the information presented for terminations not specifically addressed can be done, but with some

    Jan 1, 1978

  • SAIMM
    Safety Considerations In Underground Logistics?A Look At Vertical, Horizontal And In-Stope Transportation Systems ? Synopsis

    By S. M. Rupprecht

    Transportation accounts for some 26% of all mine accidents in South Africa. Although this figure may not be as prolific as fall of grounds accidents or accidents caused by seismic events, the enormity

    Jan 1, 2011

  • AUSIMM
    Research on Reduction-Magnetic Separation of Bayan Obo Ore

    Research on Reduction-Magnetic Separation of Bayan Obo Ore

    Sep 13, 2010

  • AUSIMM
    21st Century Bond

    By M Sherman

    The challenge facing the engineering provider is to calculate throughput rates when faced with disparate specific energies calculated by different testing methodologies. Typically, an ownerÆs team wou

    Aug 12, 2013