Search Documents

  • NIOSH
    The Effect Of Standing Support Stiffness On Primary And Secondary Bolting Systems

    By Stephen C. Tadolini, Yunqing Zhang, Thomas M. Barczak

    Standing crib supports have been applied in underground mining programs to resist large roof movements and sustain high-loads. The strength and deformation capability of these systems has been docume

  • NIOSH
    RI 2300 Underground Loading Devices in Metal-Mines

    By C. Lorimer Colburn

    "The diverting of men from industry to combat in the world's war focused the attention of the operators in this country upon mechanical means of doing things. The demand for man-power -was so insisten

    Oct 1, 1921

  • NIOSH
    OFR-99-77 Surveying Inhalation Contaminants In Above Ground Coal Mining And Processing Work Areas (For Company Safety Officers)

    By Walter D. Holland

    This is one of a series of instruction guides developed to help instructors present health and safety training courses to workers in the coal mining industry. This course is intended for training thos

    Jan 1, 1976

  • SAIMM
    Planning Concept For U/G Works - Overall Planning Concepts Of The Underground Works - Park Station To Marlboro Portal - Summary

    By Philippe Dumont

    ?Lay out of the tunnel section ?General ?Geology ?Tunnels methods ?Stations constraints ?Impacts on tunnels ?Design ?Programs

  • SME
    Urban Tunneling Technology - European Experiences

    By Erich J. Jacob

    In the past 15 years the enforced improvement of the public traffic systems caused a boom in urban tunnel construction. In 1961 the City of Paris started to build the Express-Metro. Of the 47 km long

    Jan 1, 1976

  • DFI
    Design Of The Drilled Shaft Foundations For The Cooper River Bridge

    By Liang Shen

    The Cooper River Bridge, the longest cable-stayed bridge in North America, replaces two existing bridges along U.S. Highway 17 and connects the City of Charleston and the town of Mount Pleasant, South

    Jan 1, 2013

  • SAIMM
    Stability Considerations for Slopes Excavated in Fine Hard Soils/Soft Rocks at Cobre Las Cruces Mine, Sevilla, Spain

    By J. M. Galera, M. D. Rodriguez, V. Pozo, S. Cooper

    "Cobre Las Cruces mine extracts copper minerals from a VMS deposit located in the well-known Iberian Pyrite Belt (IPB). As an open pit, it is distinguished geologically from other IPB mines by the pre

    Jul 1, 2019

  • DFI
    A Decade Of Concrete Embedded Walls In UK - Synopsis

    By Robert Fernie

    Demographics and Infrastructure demands have led to a significant increase in construction of: deep basements for buildings and, trough structures for Highway and Rail/Metro. Concrete embedded walls u

    Jan 1, 2000

  • AUSIMM
    Common pitfalls in sampling iron ore

    By R J. Holmes

    The procedures and equipment used for sampling iron ore process streams have generally improved in recent years. However, there are a number of areas where significant issues still commonly occur, inc

    May 9, 2017

  • NIOSH
    IC 8908 Health And Safety In-House And Contract Research And Development In Fiscal Year 1983

    This publication summarizes, for potential contractors and all other interested parties, the research and development of in-house and contract projects programmed by the Bureau of Mines for fiscal yea

    Jan 1, 1982

  • NIOSH
    IC 6254 The Method Of Underground Mining Of Iron Ore In The District Of Krivoy Rog ? Introduction

    This paper has peen translated from the Russian by the United States Bureau of Mines and is issued as one of a series of circulars dealing with mining methods and costs in connection with a general st

    Jan 1, 1930

  • IIMP
    Monitoreo y control de sismicidad inducida en la U.M. El Porvenir

    By Aquiles Vivar

    Ante los problemas de sismicidad inducidos por el sistema de minado en la Compañía minera Milpo, se planteó una solución a través del sistema de monitoreo sísmico único, donde se da una distribución

    Sep 9, 2007

  • DFI
    Computation Of The Load/Settlement Behaviour Of HP-Bearing Piles - 1. Introduction

    By E. E. De Beer

    This paper describes a method for the determination of the settlement of an individual H-bearing pile, based on the results of CPT-tests. As implied by the nature of the problem, no analysis perform

    Jan 1, 1987

  • SME
    World?s Largest TBM Keeps Niagara Project On Track

    By Doug Harding

    The Niagara Tunnel Project (NTP) is a 10.4-km- (6.5- mile-) long, 14.4-m (47.5-ft) bored tunnel that will run under the city of Niagara Falls from the Upper Niagara River to the Sir Adam Beck power st

    Jan 1, 2008

  • SME
    Michael Karmis: An Interview With the 2002 SME President

    Your thoughts on the current status of the global minerals industries? The global economic, technological, social and political changes of the last two decades of the 20th century resulted in the e

    Jan 1, 2002

  • CIM
    Automatic Control at the Strathcona Concentrator for Presentation to the Canadian Mineral Processors

    By D. M. Doyle

    "The Strathcona Concentrator operations, the application of control systems in the crushing, flotation and tailing fill sections, and current and future computer control concepts are described in this

    Jan 1, 1974

  • AUSIMM
    Presidential Address, 1954

    Delivered at the University of Sydney, on June 4th, 1954.THE TORCH WE HOLDLast year Our Institute celebrated its Diamond Jubilee, coincident with the holding of the Fifth Empire Mining and Metallurigc

    Jan 1, 1954

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Program Development - Background - Collapse

    By Darrell L. Beddard

    The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western

    Jan 1, 1996

  • SAIMM
    A stochastic simulation framework for truck and shovel selection and sizing in open pit mines

    By S. Frimpong, S. R. Dindarloo

    Material handling in open pit mining accounts for about 50% of production costs. The selection and deployment of efficient, safe, and economic loading and haulage systems is thus critical to the produ

    Jan 1, 2015

  • SME
    The Application Of Automation In Modern Mining Analytical Laboratories

    By Andre Balt, Pierre Hofmeyr

    It is only recently that automation has been applied to mining analytical laboratories. This paper describes the use of automation in the laboratory analytical process of hard-rock mining and geologic

    Jan 1, 2005