Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
3.2 Lotz - Sampling For Cyanide In Metallurgical ProcessesBy Peter W. Lotz
Contents of: ?Sampling for Cyanide in Metallurgical Processes? ?Sampling at process level of operation ?Sampling at environmental level ?Sample stability and integrity issues ?each citing possi
Jan 1, 2005
-
Requirements and Performance of Pumpable Cribs in Longwall Tailgate Entries and BleedersBy Peter Zhang
Pumpable cribs are being increasingly used in longwall tailgate entries and bleeders for roof support under abutment pressure. Their high peak capacity and confinement-controlled yield characteristics
Jan 1, 2012
-
The Institute During 1938By Daniel C. Jackling
WHAT is written here features some of the things that I would say if I were to de- liver a Presidential address during the Annual Meeting to be held this month in New York. I am aware that custom favo
Jan 1, 1939
-
Comparative tests of two operating procedures for the Turam electromagnetic prospecting system conducted at the McClean uranium deposits in northern SaskatchewanBy K. Duckworth
"Comparative tests of the conventional Turam survey configuration and an alternative configuration called the Tx-parallel configuration were conducted at the McClean uranium deposit in northern Saskat
Jan 1, 1988
-
Progress Report On The Old Bevier Passive Treatment Wetland, Macon County, MissouriBy Kwang ‘Min’ Kim, Paul T. Behum
The Old Bevier Aerobic Wetland in Macon County, Missouri, was constructed between 1990 and 1991 by the Missouri Department of Natural Resources’ Land Reclamation Program for the purpose of treating ac
Jan 1, 2005
-
Fuelcell Versus Diesel Loader Operation: Cost-Benefit Analysis StudyBy Marc C. Bétournay
Under the requirement to define the economic advantages of using hydrogen fuelcell vehicles, a broadscoped project was initiated to quantify the costs associated with operating fuelcell vehicles and d
May 1, 2003
-
Launch of an Earth Pressure Balance Tunnel Boring Machine in Short-Mode on a Congested Site from Narrow Deep Shafts for The Alexrenew Project in Alexandria, Virginia: A Case Study - RETC2023By Luis Fernandez-Deza, James Hawn, Dustin Mount, Jean-Marc Wehrli
The RiverRenew Tunnel System project in Alexandria, VA forms part of a CSO scheme aimed at reducing overflows of combined stormwater and sewage into the Potomac River during storm events. A major piec
Jun 13, 2023
-
The Development of AustraliaÆs Mineral ResourcesThe title of this address was selected before I had an opportunity to consider in detail the matters that I would like to discuss. Accordingly, I chose a very broad subject-so broad indeed that it wou
Jan 1, 1944
-
New Casting Moulds For Anode CopperBy Torben Edens
Norddeutsche Affinerie?s (NA?s) primary smelter continually increased production in the past decade. The smelter?s concentrate capacity was expanded from 500,000 in 1993 to 1,000,000 t/a dry concentra
Jan 1, 2005
-
-
Nature Of Low-Grade Indian Iron Ores And The Prospects Of Their Enrichment Through Gravity SeparationBy S. Roy
Soft laminated iron ore (SLO) having a higher hematite content and Martite goethite iron ore (MGO) having a higher goethite content were subjected to detailed characterization and beneficiation. The p
Jan 1, 2009
-
Evidence of Reduced Water Infiltration by Microhardpans û Electrical Resistivity Measurements at Pe±a de Hierro, Rio Tinto, SpainBy M Furche, U Noell, C Grissemann, J A. Meima, T Graupner, A Romero-Baena
The mining residues at the abandoned copper mine site Pe±a de Hierro, located at the headwaters of the Rio Tinto, contribute substantially to the pollution of the river with high loads of Fe, As, Pb,
Jan 1, 2008
-
Limiting the Influence of Extreme Grades in Ordinary Kriged Estimates"The management of outlier grades in positively skewed gold distributions is a contentious issue. Incorporating outliers in standard ordinary kriging (OK) estimation procedures in a way that honours t
Apr 1, 2019
-
Rehabilitation of New Croton Aqueduct ShaftsBy W. James Marold
The New Croton Aqueduct (NCA) was the first major water supply tunnel for New York City. The 50-km (31-mi) long tunnel has 33 open shafts 6 m (20 ft) to 121 m (397 ft) deep. The tunnel and shafts are
Jan 1, 2008
-
OFR-60-85 Correct Shortcomings During Trial Of Shotcrete Lining System And Demonstrate Shotcrete SystemThis report describes the redesign, development and field demonstration of a remote shotcrete lining system, capable of operating in shafts and mines from 8 to 16 feet in diameter at depths up to 1000
Jan 1, 1983
-
A Theoretical Approach to the Sublimation Separation of Zirconium and Hafnium in the Tetrafluoride FormBy H. F. Niemand, C. J. Postma, P. L. Crouse
"SynopsisThe separation of zirconium and hafnium is essential in the nuclear industry, since zirconium alloys for this application require hafnium concentrations of less than 100 ppm. The separation i
Jan 1, 2015
-
Voidfill material strength behaviour and underground applicationBy S. Z. Pethö, H. Yilmaz
South Deep Mine is currently undertaking numerous voidfilling projects using low strength aerated cement products. Representative samples from one such site, were taken and tested for the load deforma
Jan 1, 2003
-
Magnetic Field Application In Cationic Silica Flotation Of Magnetic Taconite Concentrates (e19dde4c-abfd-4256-888b-d05febe2f23a)By S. Ersayin, I. Iwasaki
Application of a magnetic field was shown to be effective in controlling iron losses in pilot-scale cationic silica flotation in the processing of magnetic taconite concentrates. The design of a magne
Jan 1, 2002
-
MLA 15-93 - Mineral Resource Investigation Of The Caribou City-Stump Creek Study Area, Bonneville And Caribou Counties, IdahoBy Richard L. Rains
In 1992, the Bureau of Mines evaluated mineral resources of the 34,043-hectare Caribou City and 41,943-hectare Stump Creek study areas in southeastern Idaho. No resources were delineated. The areas ha
Jan 1, 1993
-
Post-Mine Leaching of Galena and Marmatite at Broken HillBy Blanchard R
In stopes of the 2000- and 2150-ft. levels in the North mine section of North Broken Hill Limited, whence a substantial proportion of the company's production is being drawn, and especially in st
Jan 1, 1942