Elasto-Plastic Finite Element Structural Stability Analysis Of Room And Pillar Mine Workings (1726bb0c-5e63-4f04-a636-538432c37ec9)
By S. Bensehamdi
An advanced elasto-plastic finite element model adopting a modified Von Mises yielding criterion was used to simulate progressive failure of the rock strata surrounding a room and pillar mine structur
Jan 1, 1992
-
Subsidence Prediction Influence Assessment and Damage Control
By Y. Luo
An extensive subsidence research program conducted by the authors has greatly improved the accuracy and the capabilities of subsidence prediction under complicated mining and surface conditions. The t
Jan 1, 1997
-
The Effectiveness Of Interpanel Pillars In The Control Of Surface Subsidence (ef7cc44b-3192-4f5f-a75c-62563d519797)
By Laxminarayan Holla
There exist many formulae for designing coal pillars. However, when applied to a given set of mining parameters, they lead to different pillar sizes and factors of safety. From the subsidence point of
Jan 1, 1992
-
Rehabilitation of Underground Surge Bunker Following Massive Rib Wall Failure
By Rob Robinson
Following a massive rib wall failure along the reclaim belt of the large underground surge bunker at CONSOL?s Bailey Mine, a multifaceted, cleanup and rehabilitation effort was initiated to rapidly st
Jan 1, 2007
-
The Influence of Interface Friction and W/H Ratio on the Violence of Coal Specimen Failure ? A Comparison Between a Bump and Non?Bump Prone Mines
By Simon H. Prassetyo
Violent failures of coal pillars, known in practice as coal mine bumps, have long been a subject of investigation. Many field investigations have considered geological conditions that create high stre
Jan 1, 2011
-
Stress Analysis and Support Design for Longwall Mine-Through Entries (A Case Study)
By Keith Heasley
An eastern longwall mine was required to mine through a set of three entries located midway down the length of a panel. Of course, the mine desired to design a successful support system for the mine-t
Jan 1, 2003
-
Analysis of Geologic and Geotechnical Conditions and Their Effects on Longwall Mining to Optimize Mine Planning at Shoal Creek Mine
By Yong-Ming Jiang
In cooperation with Cyprus Twentymile Coal Co., researchers from the National Institute for Occupational Safety and Health (NIOSI-I), Spokane Research Laboratory, conducted a study at the Foidel Creek
Jan 1, 1998
-
Modeling of Joint and Fracture Distributions in Rock Mass Before and After Blasting
By Binchuan Zhang
Based on the theory of fracture mechanics and blasting, computer simulations were performed to predict the original rock mass structure and those rock mass structures damaged at different levels uing
Jan 1, 2001
-
The Strong Outbursts of Coal and Gas in Coal Mines in China
By S. N. Zhow
China has at least 200 collieries suffering from the problem of instantaneous outbursts of coal and gas. The strong outbursts often occurred in active tectonic lanes and areas of high stress concentra
Jan 1, 1987
-
Stepwise Support Technology For Extremely Soft Rock Roadway And Its Engineering Application
By Xinchuan Xia
Based on the stepwise strain features and the strength reduction law of the surrounding rock in extremely softrock roadway, this paper proposes a dynamic supporting principle. A new kind of stepwise r
Jan 1, 2000
-
Localized Horizontal Stress And Its Effect On Ground Control
By John Stankus
Regional high horizontal stress has long been recognized as an important factor affecting roof stability However, localized high horizontal stress, although causing many ground control problems, has n
Jan 1, 1999
-
Research on the rational structure of tensible rockbolt and the effect of surrounding rock reinforcement
By Chao-jiong Hou
The necessity of using tensible rockbolt in the roadway with soft rock, high in-situ stresses, mining influence and other complex conditions was discussed, the structures of three kinds of tonsibte ro
Jan 1, 1989
-
Study of load transfer capacity of bolts using short encapsulation push test
By Naj Aziz
A series of laboratory experiments were conducted on a variety of bolt types to examine the load transfer capacities of different profiled bolts in short encapsulation push testing. A 75 mm section of
Jan 1, 2003
-
Specialty Truss System And Their Performance
By Ben L. Seegmiller
Specially truss systems? including the Intersection Truss®, Continuous Entry Truss®, Cutter Roof Truss® and Roktrus® have been used in many coal mines in the mid- west and western United States during
Jan 1, 1990
-
Typical Complete Stress-Strain Curves Of Coal
By Khaled Morsy
This study presents a typical stress-strain model for coal material using the available in-situ and laboratory tests data conducted on coal. This model can be used as a basic coal model in finite elem
Jan 1, 2001
-
Prediction Of Longwall Support Loading At Southern Colliery, Queensland (a27f315c-1e91-4c85-b61a-2de1eb8e0d0f)
Roof conditions at Southern Colliery, the second Iongwall mine to be established at German Creek, were found to be much stronger and more massive than at the earlier longwall mine on the lease. Invest
Jan 1, 1992
-
Investigation Of Blast Damage And Underground Stability
By S. Paul Singh
The implications of blast damage are harmful in both economic and physical sense. To understand the mysterious nature of blast damage assessment and prediction, field work was done by driving an exper
Jan 1, 1993
-
The Use Of Geologic Modeling In The Prediction Of Adverse Roof Conditions
By Edward S. Custer
Recent investigations of mine roof falls have demonstrated that roof failures are generally associated with geologic conditions. The roof falls can be predicted by using the techniques of depositional
Jan 1, 1981
-
The Influence Of Water Content On Strength Characteristic Of Sandstone Subject To Triaxial Test
By S. Kramadibrata
It has been well accepted that water content significantly changes the physical and mechanical properties of rocks. Experimentation data of Uniaxial Compressive Strength (UCS), Modulus of Elasticity (
Jan 1, 2000
-
International Conference On Ground Control In Mining Design Of Three-Entry System For Super Longwall Panels
By J. D. Cole
In order to reduce the number of longwall face moves and to increase the rate of gateroad construction, super longwall panels, 1000 feet wide and 12000 to 14000 feet long, are planned for Wolf Creek C
Jan 1, 1990