Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Prediction of Pillar Interaction Effects for Deep Multi-Seam Workings

    By Lightfoot. Nicholas, Na Liu

    "Mining in multi-seam workings has been undertaken for many years in the VK Remnant pillars above and/or below current working areas have an important influence on retreat gateroad conditions at five

    Jan 1, 2010

  • SME-ICGCM
    Barrier Pillar Design for Safe and Productive Longwall Mining

    By Stephen C. Tadolini

    Effective barrier pillar design is an essential component for safe and productive underground coal mining. Barrier pillar design methodologies that incorporate sound engineering judgment have been use

    Jan 1, 2013

  • SME-ICGCM
    Structural Geological and Stress Controls on Natural Gas Inrushes in Southern West Virginia Longwall Coal Mines

    By Sandin E. Phillipson

    "On April 5, 2010 a massive dust-fueled explosion at a longwall mine in southern West Virginia claimed the lives of 29 miners. The mine had experienced large gas inrushes from the floor on two known p

    Jan 1, 2016

  • SME-ICGCM
    Research And Application Of Combined Reinforcement System

    By Binchuan Zhang

    The combined reinforcement system (CRS) combines the strengths of roof' bolting, resin-anchored cable bolt, and chemical grouting to effectively control the deformation of the strata surrounding

    Jan 1, 2001

  • SME-ICGCM
    Rock Slope Stability Comparison Between Deterministic and Probabilistic Block Theory Analyses for An Open Pit Mine

    By Pinnaduwa H. S. W. Kulatilake

    A new formulation is given to conduct a probabilistic block theory analysis. A new computer code (BTAC) has been developed to perform both deterministic and probabilistic block theory analyses. The va

    Jan 1, 2014

  • SME-ICGCM
    Evaluating the Risk of Coal Bursts in Underground Coal Mines

    By Michael Gauna, Christopher Mark

    "Coal bursts involve the sudden, violent ejection of coal or rock into the mine workings. They are almost always accompanied by a loud noise, like an explosion, and ground vibration. Bursts are a part

    Jan 1, 2015

  • SME-ICGCM
    Regional Horizontal Stress And Its Effect On Longwall Mining In The Northern Appalachian Coal Field

    By D. W. H. Su

    This paper presents the results of ill situ horizontal stress measurements using a Minifrac system in several northern Appalachian coal mines. The effect of stress magnitude and orientation on longwal

    Jan 1, 1995

  • SME-ICGCM
    Challenges of Mining the First Right-Handed Longwall Panel in a New Reserve Block in Pittsburgh Seam

    By Jun Lu, Greg Hasenfus

    "In this paper, the mining experience and challenges for the first right-handed longwall panel in the Pittsburgh seam are introduced. The longwall headgate T-junction experienced very high face conver

    Jan 1, 2018

  • SME-ICGCM
    Surface Subsidence Caused By Flooding and Dewatering at Four Abandoned Coalmines in the US

    By Kewal K. Kohli, Stefanie Self

    "Three cases of surface subsidence investigated over abandoned coal mines after flooding in one case and dcwatering in two cases are presented in this paper. Mining was conducted by the room and- pill

    Jan 1, 2010

  • SME-ICGCM
    Optimization Of District-Wide Mine Layout In Multi-Seam Mining: A Case Study

    By Huamin Li

    Mine # 8 of Pindingshan Coal Group, Henan Province, China has an annual production 2 million metric tons. But it encounters many problems, e.g. mine layout is complicated, roadway maintenance is diffi

    Jan 1, 2000

  • SME-ICGCM
    Longwall Roof Fall Prediction and Shield Support Recommendations

    By Ulrich Langosch

    In the 1990s the German mining industry introduced a new generation of shield supports. The new design of support has a maximum load capacity of 10,000 kN, making these units as strong as the shields

    Jan 1, 2003

  • SME-ICGCM
    Tunnel Deformation Monitoring "Action Levels" In Coal Mines For Support/Reinforcement Design

    By Lorraine Kent

    Mine tunnel support using rockbolts was introduced in UK coal mines over the period 1987- 1992 and is now used in over 70% of all mine tunnels. In every case the reinforcement design has been based on

    Jan 1, 1999

  • SME-ICGCM
    RQD from the Barrel to the Box: Weatherability May be a Better indicator for Roof Support Design

    By Kot Unrug

    For the purposes of underground mine design, twelve cores of the Springfield (V) Coal (Pennsylvanian) roof and floor were retrieved. Each core was photographed, described fresh in the barrel, and the

    Jan 1, 2003

  • SME-ICGCM
    Engineering Geophysics - Mine Subsidence Risk Assessment Study

    By Kanaan Hanna

    Abandoned mines pose a serious threat to public health and safety, as well as the environment. When active workings approach old mine workings, miners could encounter significant hazards. Additionally

    Jan 1, 2011

  • SME-ICGCM
    A Case History of Computer-Aided Lineament Analysis for Ground Control Planning

    By C. D. Peters

    The Bureau of Mines has been researching remote sensing analysis of an underground coal mining area in Utah and computer-aided methods of defining ground control hazards in this mining area. As a resu

    Jan 1, 1986

  • SME-ICGCM
    A New Approach To The Design Of Multi-Entry Developments For Retreat Longwall Mining (b0ac6f64-13ae-4c08-a631-b7e01a7e984e)

    By Frederick Carr

    1. The application of retreat longwall mining to the North American coal mining conditions is be¬coming more advantageous as more experience is gained. The productivity results being achieved and pote

    Jan 1, 1982

  • SME-ICGCM
    Effect Of High-Extraction Coal Mining On Surface And Ground Waters

    By Francis S. Kendorski

    High-extraction mining of coal and other stratified minerals has a predictable effect on the surface and subsurface. Impacts on ground waters in overlying strata and on surface waters, that are associ

    Jan 1, 1993

  • SME-ICGCM
    Evaluating Roof Control In Underground Coal Mines With The Coal Mine Roof Rating

    The U.S. Bureau of Mines (USBM) has developed the coal Mine Roof Rating (CMRR) to aid in ground control. This paper describes the application of the CMRR at four coal mines operated by a major U.S. co

    Jan 1, 1994

  • SME-ICGCM
    Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple Seams

    By Peter Zhang

    "Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa

    Jan 1, 2017

  • SME-ICGCM
    Numerical Modeling the Interburden Impact on Multiple-Seam Coal Mining in Western China

    By Jimin Su, Enguang Zhu, Kangning Zhang, Yang Li

    "The effect of interburden on overlying strata movement during the mining of a lower group coal seam is still a challenge in China. Based on the multiple coal seams in western China, numerical simulat

    Jan 1, 2017