Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Performance Evaluation Of A Cable Bolted Yield-Abutment Gate Road System At The Crandall Canyon No. 1 Mine, Genwal Resources, Inc., Huntington, Utah
By J. R. Koehler
Although two-entry yield pillar-based gate roads supported by wooden cribs have been commonly used throughout longwalling in the Wasatch PlateadRoan Cliffs coalfield of central Utah, a three-entry yie
Jan 1, 1996
-
Direct Laboratory Tensile Testing Of Select Yielding Rock Bolt Systems
By John D. VandeKraats
Yielding rock bolt support systems have been developed to accommodate ground movement in shifting ground such as in coal operations; in creeping ground such as salt, trona, and potash; and in swelling
Jan 1, 1996
-
A Method For Assessing The Potential Of Mine Subsidence At Abandoned Mine Sites Through The Assistance Of Finite Element Modeling
By Richard E. Bischke
Computer assisted finite element model analysis, originally developed to study stress distributions in aircraft, has been modified into a versatile mining program, that can be used to assist the engi
Jan 1, 1984
-
Optimization of the Stress Control Method to Improve Productivity and Safety in Underground Coal Mining
By Shosei Serata
The Stress Control Method improves productivity and safety in underground coal mining. The method stabilizes the roofs and floors of mine openings in both shallow and deep coal beds, regardless of whe
Jan 1, 1986
-
Prevention Of Time-Dependent Subsidence By Elimination Of Ground Movement Over An Abandoned Mine
By V. V. Nazimko
Abandoned coal mines cause subsidence and structural damages. Shallow abandoned mines induce the most severe and harmful damages. In addition, they produce time-dependent subsidence which is difficult
Jan 1, 1999
-
Development of An Online User’s and Training Manual for LaModel
By Keith A. Heasley, Christopher R. Newman
"Originally developed in 1993, LaModel has aided mining engineers and researchers alike in improving the design and safety of underground single- and multiple-seam mining operations (Heasley, 1998). T
Jan 1, 2015
-
Geotechnical Factors Influencing A Time-Dependent Deformation Mechanism Around An Entry In A Dipping Seam
By M. K. Larson
The U.S. Bureau of Mines and Cyprus Shoshone Coal Corp. conducted a study of deformation mechanisms in strata around a longwall gate road system at two sites in an underground coal mine near Ham, WY.
Jan 1, 1996
-
Analysis Of Entry Roof Failure And Falls At Springvale Colliery
By Wm. Mark Hart
High horizontal stresses and shear failure have been considered the major reasons that cause entry roof failure and falls for underground mining. Therefore, reorientation of the current mining systems
Jan 1, 1996
-
Estimation Of Long-Term Stability Of Mine Pillars In Underground Pit
By S. Yamashita
Recently in Japan, unexpected degradation (surface subsidence) at old underground quarry sites, such as 'Ohya-Ishi' (pumice tuff) pit field has often been occurred. At these quarry sites, th
Jan 1, 1996
-
Coal Mine Burst Prevention Controls
By Anthony Iannacchione
Coal mine bursts have represented a major hazard for U.S. mining operations for more than 90 years. During this time, many prevention controls have been developed and tested. This paper reviews 11 p
Jan 1, 2008
-
Subsidence Misconceptions And Myths
By Richard E. Gray
Subsidence due to coal mining is poorly understood by non-specialists. This has led to numerous misconceptions and myths based on limited observations and lack of knowledge. The three most common are:
Jan 1, 1996
-
Load Transfer Distance Calibration of a Coal Panel Scale Model: a Case Study
By Mark K. Larson
Calibration of LaModel for deep coal mines begins with adjustment of overburden stiffness for load transfer distance. This calibration determines whether mining induced stresses are concentrated in th
Jan 1, 2012
-
Calibrating the Lamodel Program for Site Specific Conditions
By Keith A. Heasley
The LaModel program has been used successfully in the United States for many years to design pillars to ensure global stability of pillar recovery operations. However, the recent Crandall Canyon Mine
Jan 1, 2012
-
Development of a mechanistic model for prediction of maximum subsidence and subsidence profile due to longwall mining
By Richard D. Begley
This paper summarizes the development of a mechanistic model to predict longwall mining induced surface subsidence. The model was originally developed from data acquired from a recent field study cond
Jan 1, 1989
-
Pre-mining stresses at some hard rock mines in the Canadian Shield (2c76bca0-8dd2-4a44-bc9b-85524b3514cf)
By B. Arjang
ABSTRACT: Ground stresses are one of the significant factors in the context of rockbursts and underground instability at some hard rock mines in Canada. Overcoring strain relief measurements using tri
Jan 1, 1989
-
Design and Performance of a Longwall Coal Mine Water-Barrier Pillar
By Francis Kendorski
The Skyline #3 Mine of Canyon Fuel Company in Utah was planning longwall mine development adjacent to and downdip of older mine workings known to be flooded. Barrier pillar geometries and widths were
Jan 1, 2007
-
Control Of Roadway Closure In Underground Coal Mines By Sidewall Weakening Technique
One of the problems associated with the maintenance of roadways in underground coal mines is that of dealing with roadway closure. Sidewall weakening technique is based on the transference of the h
Jan 1, 1990
-
Development, Trials, and Testing of a Two-Component, Rapid-Set Cement Grouting System
By Stephen C. Tadolini, Robert Hawker, Peter Mills, Colin Grubb, Tom Meikle
"In unfavorable strata conditions, it is often necessary to install additional long tendon support as part of a primary support cycle. Although these support systems provide the required additional st
Jan 1, 2017
-
Surface Fracture Development From Mine Subsidence In Eastern Kentucky
By Clyde DeRossett
Surface fractures, sometimes of significant size, are observed in eastern Kentucky over high extraction areas. Field observations were correlated with mine maps and a regional subsidence prediction co
Jan 1, 1993
-
Ropes mine crown pillar rock mechanics
By W. G. Pariseau
A crown pillar cave occurred at the Ropes Mine in December, 1987, that resulted in closure of the mine. Production was resumed soon afterwards with the formulation of a rock mechanics plan designed to
Jan 1, 1989