Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Using Photogrammetry and UAVs for Pattern Optimization, Quantification, and Mapping

    By Tony Rorke, Tamara Wiseman

    Due to the advancements in technology it becomes easier to obtain accurate measurements for mining, quarry, and construction operations even in the most remote places. The use of off-the-shelf photogr

    Jan 1, 2015

  • ISEE
    Drilling and Blasting Optimization

    By Jorge Flores, Benjamin Cebrian

    Blast Optimization at a high altitude mine operation involves not only the selection of the right drilling designs and explosives but also the circumstances of operators working at low oxygen levels a

    Jan 1, 2015

  • ISEE
    Kanalku Falls Blasting for Fish Habitat Improvement in Alaska

    By Catherine T. Aimone-Martin, Kristen Kolden

    In August of 2013 the USDA Forest Service (USFS) blasted bedrock at the base of a waterfall in Kanalku Creek within the Kootznoowoo Wilderness Area on Admiralty Island in the Tongass National Forest l

    Jan 1, 2015

  • ISEE
    Vibration and Blasting

    By Edward J. Walter

    Our modern technology is provided with a unique but flexible power tool in the use of explosives. A by-product of explosives usage is vibration or elastic deformation of the earth which is annoying to

    Jan 1, 1975

  • ISEE
    Underground Longhole Blasting near Large-diameter Booster Fans

    By Norm Disley, Kingsley Hortin, Gertjan Bekkers

    As part of the expansion of the Kidd Creek Mine to 2,682 meters (8800 feet) below surface, two largediameter 3000kW (4000HP) booster fans were installed at the 6000 level. Shortly after commissioning

    Jan 1, 2008

  • ISEE
    Evaluation Of Suitability Of Permitted Delay Detonators Vis-avis Their Delay Timing For Use In Underground Coal Mines

    By Harsh Kumar Verma

    Blasting off-the-solid is the most commonly used method during development of galleries in Bord and Pillar method of underground coal mining. In this method, only P5 explosives are used with permitted

    Jan 1, 2008

  • ISEE
    The Didcot Demolition

    By R. Alford

    In the modern world of demolition safety is paramount and unnecessary or unquantifiable risks are not accepted (FasterCapital, 2024) and all risks must be kept As Low As Reasonably Practicable (ALARP)

    Jan 21, 2025

  • ISEE
    Development, Application and Review of Ontario's Quarry Blasting Vibration Guidelines

    By Lance McAnnuff

    Whatever system is devised to control noise and ground vibration from blasting operations must present an effective compromise between the rights of the individual to be undisturbed by the actions of

    Jan 1, 2004

  • ISEE
    Close Proximity Blasting at the University of Georgia

    By Mick Fritz, Gregory Poole

    Construction blasting is always challenging when in close proximity to existing structures, but when you are next to a landmark like Sanford Stadium at the University of Georgia it can get intense. Bl

    Jan 1, 2011

  • ISEE
    Blasting for Rescue Applications

    By John Norman

    This paper will cover blasting techniques that are applicable to underground and other rescue that involves removing obstacles and breaking rock in close proximity to rescuers and subjects.

    Feb 1, 2020

  • ISEE
    Blast- Induced Structural and Crack Response of a Brick Residential Structure Near an Aggregate Quarry

    By Charles Dowding, Cathrine Aimone-Martin

    This article summarizes an investigation of the structural response of a brick façade home in New Mexico. The subject Ricter residence was located some 1100 to 1400 ft away from an aggregate quarry, a

    Jan 1, 2005

  • ISEE
    Design of a Passive Underwater Pressure Gauge

    By S. Lim, G. Walsh, V. Romero

    The cable television show, Mythbusters, contacted the New Mexico Institute of Mining and Technology requesting a pressure gauge to be used in underwater testing. The requirements for the gauge were: i

    Jan 1, 2009

  • ISEE
    Stealing Thor's Thunder Lightening: Myth vs. Reality

    By C W. "Mickey" Bradley

    Thunder strikes terror in the hearts of man and has since the advent of time. We all fear the unknown; even the Greeks created a god, THOR, to be responsible for the thunder and rain. Thunder, by itse

    Jan 1, 1992

  • ISEE
    Detection of Geological Features using Aerial Image Analysis and Machine Learning

    By Ravi Sahu, Ankit Jha, Sudarshan Rajagopal, Purushotham Tukkaraja

    Geologic structures are one of the crucial parameters in blast design. Structural geology and rock properties influence drilling patterns, blast layout, and initiation systems. A comprehensive underst

    Feb 1, 2020

  • ISEE
    Tunneling in a Sensitive Environment

    By Scott Stephenson

    Making a tunnel through solid rock can sometimes be a dangerous task. Many things must be considered in order to complete such a task safely, and efficiently. Prior to starting things must be known su

    Jan 1, 2009

  • ISEE
    Single Round Blasting of 10 Food Diameter x 65 Foot Depth Emplacement Shaft Collars at the Mercury, Nevada Test Site

    By Tom Short, Bill Beam

    Some of the weapons testing shafts at Mercury, Nevada require depths of 1000ft and diameters of 10 feet. The top 40 feet to 65 feet is drilled, blasted and excavated by Large caisson type augers in or

    Jan 1, 1991

  • ISEE
    Monte Carlo Approach to Signature Hole Analysis

    By Braden Lusk

    Vibrations as a result of blasting practices in mining engineering are a complex phenomenon controlled by many variables. Mine blast vibration modeling and prediction is becoming more important as a c

    Jan 1, 2013

  • ISEE
    Erratum: A Three Parameter Rock Fragmentation Distrubution

    By A T. Spathis

    Corrections are given for “A three parameter rock fragmentation distribution” by A.T. Spathis (Measurement and Analysis of Blast Fragmentation, Workshop hosted by 10th International Symposium on Rock

    Jan 1, 2013

  • ISEE
    The Effects of Run-up on an Explosively Formed Projectile

    By Jason Baird, Joshua Hoffman, Phillip Mulligan

    The purpose of this report is to address the method of reducing the overall explosive weight of Explosively Formed Projectiles (EFPs) while still achieving satisfactory performance. This reduction is

    Jan 1, 2010

  • ISEE
    Efficient Blasting for Bench Stability and Fragmentation Results Improvement

    By Javier Illanes Pizarro, Gustavo Huerta Valer, Jorge Cárdenas Miranda

    Bench stability is the basis of sustainability in an open pit mining operation. Taking care of the pit walls while maintaining fragmentation results can prove a challenge. In this study, technical pro

    Feb 6, 2023