Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
xP-frag, a Distribution-free Model to Predict Blast Fragmentation
By Finn Ouchterlony, José A. Sanchidrián
"A model for fragmentation in bench blasting that originates from dimensional analysis of fragmentation in asteroid collisions is presented. Percentiles of the size distribution are obtained in the ba
Jan 1, 2017
-
Momentum Theory – A New Calculation of Blast Design and Assessment of Blast Vibrations
By Robert Boehnke, Bernd Mueller
Despite enormous efforts over the last decades there are still many unanswered questions with respect to calculation and modeling of the blast process using appropriate physical laws. Most calculation
Jan 1, 2003
-
Fluvial Geomorphology-Stream Relocation for the Mining Industry
By Gerald W. Longenecker
For decades, traditional hydraulic engineering approaches have been used for sizing stream channels when stream relocation efforts have been necessary to allow for the advancement of quarry and other
Jan 1, 1998
-
Methods to Quantify Drilling Accuracy
By Tristan Worsey, Nathan Rouse, Kyle Hall
Drilling accuracy is the foundation to any successful blast operation. Even the best blasting practices cannot overcome poor drilling and still obtain desired results. Inaccuracies in boreholes can re
Jan 1, 2018
-
Elimination of Ground Vibrations and Fly Rock: A Case Study of an Opencast Mine
By V. Sastry
Signgareni Collieries Company Ltd. is operating the JK Opencast Project, at Yellandu, with a rated annual capacity of 1.6 Mt of coal with an average stripping ratio of 4.3. This opencast coal project
Jan 1, 2001
-
Blasting to Reduce Ore Dilution - Are You Kidding?
By Brad Bulow
Blasting is an essentially violent process aimed to disrupt and loosen rock for productive excavation. Some dilution of any ore present is the inevitable result. This makes blasting a dirty word to mo
Jan 1, 2000
-
It Felt like an Earthquake
By David Ziegler, John Babcock, Gregory Poole
On December 9, 2003 at 3:59 PM EST an earthquake with a 4.5 magnitude occurred in central Virginia. According to a survey on the US Geological Survey website, this quake was felt as far away as Bridge
Jan 1, 2005
-
Violence Factor – The New Tool for Blast Performance Analysis
By Dr. Calvin J. Konya, Anthony Konya
Blast violence has always been a criteria that has been analyzed without a quantitative approach relying on opinions of those viewing the blast and oftentimes does not transfer between open-pit mines,
Feb 1, 2020
-
Violence Factor – The New Tool for Blast Performance Analysis
By Dr. Calvin J. Konya, Anthony Konya
Blast violence has always been a criteria that has been analyzed without a quantitative approach relying on opinions of those viewing the blast and oftentimes does not transfer between open-pit mines,
-
Modeling Vs. Monitoring Blast Movement: The Cost of Variation
By Will Hunt, Darren Thornton
In March of 2013, an undisclosed gold mine (MINE X), located in the Western United States, performed blast movement monitoring of three blasts occurring in one of two active pits. Blast Movement Monit
Jan 1, 2014
-
Underwater Explosions Part 5. Minimum Weight of an Explosive Charge for the Reliable Energy Measurements
By M. Hagfors
When establishing an underwater testing site for the energy measurements of the explosives, the dimensions of the measuring pool have to be measured to find out what is the maximum weight for the test
Jan 1, 2007
-
Explosive Destruction of an Underground Reinforced Concrete Bunker – Computer Hydrocode Simulation
By Dale Preece
A carefully designed and controlled in-place destruction experiment was performed on a concrete bunker buried in 4.27 m (14 ft.) of soil. The objective was to determine if the explosive charges would
Jan 1, 2006
-
Measuring Underground Face Drilling and Blasting
By Thomas Barkley
Recent developments in hardware and software have made accurate measurement of Underground Face (Development) Drilling a reality. New and compact laser profiling equipment makes it possible to measure
Jan 1, 2003
-
Efficient and Safe Pre-Split Blasting Through Mechanized Explosive Loading System
By Jorge Cárdenas, Gustavo Huerta, Regina Rocha Oriundo, Miguel Angel Humpire, Johan Salas Flores
Currently a critical activity for slopes stability and safety in mining is pre-split blasting to reduce damage from trim blast. Most common explosive used are based on packaged explosives, with 1 ½ in
Feb 6, 2023
-
Analysis of Rock Fragmentation by Blasting Using Combined CFD/FEZ/DEM Models
By Alejandro Ferrada Vergara, Héctor Espinoza Muñoz
Drilling and blasting stages are considered factors that impact downstream processes significantly and over all the mining business value chain. Adequate control of these processes may represent energ
Jan 1, 2016
-
Blasting for Avalanche Control Above Snoqualmie Pass and Chinook Pass in Washington State
By Craig Wilbour, John Stimberis, Rob Gibson, Lee Redden
An avalanche is a snow slide. A simple explanation is that the snow on a slope will slide (avalanche) when the snow strength can no longer support its own weight. Snow avalanches happen when the load
Jan 1, 2004
-
Blasting 1.8 million m3 Rock in One Shot: The Blast Design and Environmental Damage Control
By Tianrui Xu, Chaohong Liu, Bangqing Ding
The authors were responsible for a series of large scale multiple chamber charge blasts conducted in the granite mountain area for making construction space on the southeast sea coast in China during
Jan 1, 1998
-
Impact Mine Blasting on the Environment of Quarry Operation (Neighbou Perception and Operator Dutie)
By G. Gomez Ciments-Calcia
The sources of complaints by neighbours of the operating quarry are due to the 3 following causes : - Impulsional noises or air hoch wawes – Vibrations - D u s t How a blasting in a quarry operation i
Jan 1, 2002
-
Monitoring and Prediction of Blast Vibrations : A Case Study
By D Vidyarthi
Blasting is the most important activity in the mining industry, the world over. It is a well known fact that only part of the explosive energy gets utilized in causing the actual rock fragmentation. T
Jan 1, 2007
-
Mitigation of Loading on Floor Boards in Light Armored Vehicles Subjected to Explosive Loading
By Robert Benedetti
This paper describes various mitigation methods in order to reduce the maximum acceleration of the floorboard of hulled vehicles when explosive charges buried in water saturated sand were detonated be
Jan 1, 2012