Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
New Concepts For CFA (Auger Cast) Pile Controle - SynopsisBy Shachar Magali
This article describes two new concepts regarding the CFA (Auger Cast) piles. The first one, MALI Effect, is an approach to control the casting phase, while the second one, NETA Shear, is a technique
Jan 1, 2000
-
Installation And Performance Characteristics Of High Capacity Helical Piles In Cohesive SoilsBy Mohammed Sakr
This paper presents the results of a full-scale axial compression and tension (uplift) testing program executed on large-capacity helical piles installed in very stiff to very hard clay till soils (i.
Jan 1, 2012
-
Predicting The End Bearing Capacity Of Rock Socketed ShaftsBy Lianyang Zhang
For optimal design of rock socketed shafts used to support axial loading, it is important to predict the end bearing capacity. The existing empirical methods for determining the end bearing capacity o
Jan 1, 2008
-
Impact Of Offshore Site Investigation Practice On Reliability Of Axial Pile Design In Siliceous SandsBy James A. Schneider
The evolution of the American Petroleum Institute (API) design method for axial capacity of driven piles in siliceous sands is explored, and complemented with an overview of how changes in offshore si
Jan 1, 2006
-
Coming To Times - Background - CollapseBy Darrell L. Beddard
The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western
Jan 1, 1995
-
Anchored Diaphragm Wall and Dewatering System for Libya HotelBy Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017
-
Anchored Diaphragm Wall and Dewatering System for Libya HotelBy Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017
-
Design and Construction of the Thames Water Lee Tunnel Shafts, LondonBy Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley
"AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor
Jan 1, 2014
-
Construction of a Very Flexibility, Impermeable, Bituminous Membrane Seepage Barrier, to Connect an Existing Concrete Dam Structure to a Newly Constructed Abutment Cut-Off WallBy Brian Wilson, Megan Atkinson, Richard Diggle, Nathan Sweeney
"Ruskin Dam, located near Mission, British Columbia, was constructed in 1929 and 1930 and comprises of a concrete gravity dam structure founded on bedrock. At the right abutment, which consists mostly
Jan 1, 2017
-
The Application Of Interlocked Steel Pipe Pile And Steel Sheet Pile For An Industrial Port ? SynopsisBy M. Tominaga
An industrial port complex was constructed on the west coast of Leyte Island The work was started in December 1981 and completed in May 1984. This port complex includes a 665 m long wharf and can acco
Jan 1, 2010
-
Vibratory Driver/Extractors Do More Than Drive Sheet Piles - SummaryBy John L. White
Vibratory driver/extractors do more than drive and extract sheet piles. I would say more than sixty percent (60%) of the time, vibratory pile driver/extractors are engaged in work that has nothing to
Jan 1, 1997
-
Peribonka Dam In Canada A Showcase Of Advanced Ground Engineering TechniquesBy Mazin Adnan
The 80m high dam at the Peribonka river in the Canadian province of Quebec was designed for the generation of 385 MW of hydro electrical power (Fig.1). The complex ground conditions required the e
Jan 1, 2008
-
Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - SummaryBy Francis D. Leathers
Four friction pile load test programs, including 23 tension tests and 9 compression tests, have been performed as part of the Central Artery/Tunnel Project in Boston, Massachusetts. The tests, perform
Jan 1, 1994
-
Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control ? IntroductionBy Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is
Jan 1, 2004
-
An Unusual Permanent Shoring JobBy Gordon Demetrick
3900 Yonge St. was not a typical site on which to build a condominium apartment. A steep hill covered the majority of the site. In order to use as much of this site as possible, the rear of the buildi
Jan 1, 1987
-
Effect Of Surcharge Pressures On Excavation Support - Inconsistencies Between Design Calculations And PracticeBy Darrell Wilder
When designing excavation support systems in urban environments, it is often necessary to consider the effect of vertical surcharge loads from adjacent structures. Several methods are used in practice
Jan 1, 2006
-
Deep Foundations In Karst - Lessons Learned From I-40 Corridor Widening In Knoxville, TennesseeBy James L. Vinson
Wilbur Smith Associates (WSA) has provided planning, engineering and construction oversight assistance to the Tennessee Department of Transportation (TDOT) for three construction projects intended to
Jan 1, 2006
-
Ground Water Control In The Urban Environment - IntroductionBy Robert G. Lenz
Control of ground water for construction purposes is an everyday occurrence in the U.S. Thousands of pumps are in service at any given time. Most of these applications simply consist of pumping water
Jan 1, 1988
-
Woodrow Wilson Bridge Cofferdams (ef6ed0b3-5c8c-41f1-8337-00ee57bff823)By Roderic A. Ellman
The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.
Jan 1, 2013
-
Static And Dynamic Tests For Evaluation Of The Vertical Load Bearing Capacity Of Piles - SummaryBy Madan B. Karkee
The understanding and the development of sound theoretical basis concerning the pile foundations has been phenomenal during the past few decades, considering the thousands of years the piles have evid
Jan 1, 1997