Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Reduced wear on mine car wheels in the Kiruna MineBy J. Eric Nylund
"Intensive mechanization and automation in the LKAB, Kiruna Mine in Sweden have resulted in substantial rise in productivity and decrease in production cost. Capital investment in a modern mine today
Jan 1, 1987
-
Process Control... And Where Are We Going?By Brian Flintoff
"When I was first asked to prepare this paper and presentation in late June, I thought it might be fun to ""step back and paint the bigger picture."" Having attempted to do this, fun is not the first
Jan 1, 1998
-
Heat Load Estimation of Conveyed Ore in Underground MinesBy Jane Li, Kevin Tom
"Research has shown that broken rock on conveyor transport systems can contribute upwards of 50% towards the overall heat load in underground mines. However, few studies have made significant efforts
Jan 1, 2019
-
Improving Concentrate Grade through Smart Design and PilotingBy T. Strong
"Selectively recovering pentlandite from high levels of pyrrhotite presents a technical and operational challenge. The liberation characteristics and also the chemical environment is critical to perfo
Jan 1, 2017
-
Expert Systems Implementation at Peñoles Group ConcentratorsBy Ramón Alanís, Filiberto Orrante, Andrea Festa, Baldomero Gutiérrez, Fernando Cornejo
"SGS implemented two rules-based fuzzy logic expert applications on two grinding circuits operated by Peñoles Group in Mexico. Both expert systems are based on control strategies that push against pro
Jan 1, 2009
-
Vision for a Risk Adverse Integrated Geometallurgy FrameworkBy Guillermo Turner-Saad
"Best practice in the economic evaluation of mining projects and operations is based on the integration of geological, mining, metallurgical, environmental, marketing, economic and corporate informati
Jan 1, 2010
-
MillingBy David C. Cook
The milling complex, situated just east of the Cassiar townsite, receives raw ore from the tramline and processes it into 105,000 tons per year of milled asbestos fibre. The ore is passed through a co
Jan 1, 1978
-
The State of Art in Environmentally Sustainable Nickel Smelting: Boliden Harjavalta Nickel SmelterBy P. Pyykkö, E. Peuraniemi, J. Järvi, P. V. Latostenmaa, V. Törölä, S. Junnikkala
"Nickel concentrate smelting started in Harjavalta in 1959. First, flash smelting - Peirce-Smith converting route was applied, and the high-grade converter matte was further refined to nickel cathodes
Jan 1, 2014
-
Alkaline Pressure Oxidation Barrick Mercur ExperienceBy P. T. O'Kane
"INTRODUCTION Wright Engineers Limited is active and has extensive experience in the design of pressure oxidation plants for the treatment of refractory gold ore and concentrate. In addition to the Me
Jan 1, 1989
-
Iron Sulfide Minerals in Thiosulfate-Gold Leaching: Some Problems and SolutionsThe negative effects of pyrite and pyrrhotite on thiosulfate gold leaching have been investigated. Possible remedies to reduce some problems are discussed. In a gold bearing pure silicate ore, 92% of
Jan 1, 2005
-
Integrated Underground Mining and Processing Of Massive Sulphide OresBy Bern Klein, Malcolm Scoble, Justin Widdifield, Andrew Bamber
"It has been suggested that the pre-concentration of ore underground can bring positive economic and environmental benefits to underground mining, particularly at extreme depth. The integration of min
Jan 1, 2006
-
Rougher Flotation Improvements at P.T. Freeport Indonesia’s Grasberg OperationBy Harry Siewert
"The commissioning of the 4th concentrator (C4) at Freeport Indonesia in early 1998 increased total mill throughput from 130k to 230k tonnes per day. The C4 flowsheet consists of a single 38 ft diamet
Jan 1, 2001
-
Reducing Water Management Risks Through Processing ChangesBy C. Kennedy, S. Jensen
Traditionally, mineral processing plants are designed to achieve the highest recovery of valuable material with limited regard for the cost of managing waste products-both solid and water components.
Jan 1, 2014
-
Study of Gold Leaching with Bromine and Bromide and the Influence of Sulphide Minerals on this ReactionBy Mani Manimaran, Inna Dymov, Mariam Melashvili, Chris Fleming, Joe O’Day
This paper presents experimental evidence that supports the use of bromine/bromide as a potential alternative to conventional cyanidation for gold leaching. The study evaluated a brominebased lixivian
Jan 1, 2014
-
The Use of a Laboratory Centrifugal Separator to Study Gravity Recovery in Industrial CircuitsBy Y. Shu, A. R. Laplante
"A laboratory Knelson Concentrator (LKC), 7.5 cm in diameter, was used to study the performance of a similar unit at plant scale, 76 cm in diameter, This paper reports on sampling and assaying procedu
Jan 1, 1992
-
Factors Influencing the Expert System ProfitabilityBy Andy Fortin, André Vien, Christophe Bouché, Jeff McKay
"The technology and equipment design of the Twenty-first Century permit us to exploit low-grade ore bodies with milled tonnages reaching 300,000 tpd. Because of their substantial operational costs (en
Jan 1, 2003
-
A Novel Recycling Technique for Neodymium Magnet Scraps Using B2O3 FluxBy Takahiro Kubo, Katsunori Yamaguchi, Hidehiro Sekimoto
Equilibrium relation between B2O3 slag, RExOy-B2O3 (RE = rare earths) slag and Fe-C alloy formed by melting treatment of neodymium magnet and B2O3 was investigated. When neodymium magnet was melted to
Jan 1, 2014
-
The Management of the Development Process of the Structure of Large-Scale Production and Transportation SystemsBy Buse Florian
This paper presents the specific features of the large-scale production and transportation systems (LSPTS), describing the main notions and characteristics of the LSPTS elements. A methodologically un
Oct 1, 2009
-
The Economics of Individually Motorized Rail Cars in Block Caving OperationsBy Scott A. Stebbins
Cost evaluation models constructed specifically to evaluate the economic potential of an individually motorized railcar system of ore and waste transport demonstrate that the approach may be considera
Nov 1, 2011
-
Recycling of Rare Earth Magnet using Molten FluorideBy H. Zhu, Y. Sato, O. Takeda, K. Nakano
Recycling of rare earth magnet wastes is essential to insure the stable supply of rare earth resources. For the development of a novel recycling process, the removal of rare earth oxide from an off-sp
Jan 1, 2014