Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Real Time Safety Risk Analysis of Construction Projects Using BIM and RTLS

    By S. Setayeshgar

    The identification of potential accidents on construction sites has been a major concern in the construction industry and it needs a proactive safety plan to reduce the risk of accidents. There are no

    Aug 1, 2013

  • CIM
    Les Mines Selbaie Story Geology

    By J. J. Bouillon

    "Located in the northwestern portion of the Abitibi greenstone belt, Les Mines Selbaie is a copper-zinc (silver and gold) producer. Felsic tuffs host three are zones. Composed of sulphide veins and br

    Jan 1, 1990

  • CIM
    Intensive Electrodynamic Slag Cleaning

    By A. Warczok

    Metal losses in discard slag are the main factor determining overall recovery. The metals are present both in dissolved form and as matte or metallic inclusions, varying in size from 2 to 1000 µm. Pyr

    Jan 1, 2007

  • CIM
    Optimization of cable bolting pattern for cut-and-fill stopes in a manganese mine using observational, empirical, and numerical modelling approaches

    By A. Sinha, N. K. Babar, H. R. Kalihari, A. K. Chakraborty, M. R. Saharan, C. P. N. Pathak

    A case study is presented on the optimization of cable bolting patterns in cut-and-fill stopes at the Chikla Mine, MOIL, India. Rock mass characterization, using Bieniawski’s RMR and Barton’s Q, indic

    Jan 1, 2007

  • CIM
    Purification of solid from secondary aluminum smelting dross

    By J. C. Escobedo, J. M. Almanza, A. Flores, Cortés. D. A.

    Secondary aluminum dross, which has been exposed for several years to atmospheric conditions, was characterized using chemical analysis, X-ray diffraction, optical and scanning electronic microscopy,

    Jan 1, 2005

  • CIM
    Automated Cyanide Control at the New Britannia Mine, Snow Lake, Manitoba: Fall 1998

    By Shawn Healey, Ray Norcross

    "Site IdentificationNew Britannia MineA 50/50 WX Gold Inc. - High River Gold Mines Ltd. Joint VentureTVX Gold Inc. is the OperatorLocationThe New Britannia Mine is located in the town of Snow Lake, Ma

    Jan 1, 1999

  • CIM
    Geometallurgical Modeling - The New Approach to Plant Design and Production Forecasting/Planning, and Mine/Mill Optimization

    By Dave Bulled, Chris Bennett, Glenn Kosick, Glenn Dobby

    "Mining companies around the world are embracing geometallurgical modeling at a rapid rate, as senior executives realize that inputs must be properly measured if the output is to be managed effectivel

    Jan 1, 2004

  • CIM
    The contour method of estimating mineral resources

    By W. E. Roscoe, H. Agnerian

    The contour method can be used to estimate the mineral resources of a mineralized body. It relies on geological interpretation and allows the geologist to determine the plunge of a mineralized ore sho

    Jan 1, 2002

  • CIM
    Community Engagement Best Practice in the mining sector: What?s recommended and who?s using it?

    By Ben Bradshaw

    Context ? Community engagement has become an increasingly significant and challenging part of mineral exploration and mine development; indeed, opposition from communities proximate to a proposed min

    May 1, 2010

  • CIM
    Two-Mass Vibrating Screens for High Tonnage Applications

    By Steve Massman, Edward Wipf, Gary Beerkircher

    "As mine size and tonnage continues to increase, material handling/processing equipment has also increased in size with 400 MT haul trucks, 2000 KW crushers, 12 M SAG/AG mills, 8.5 M ball mills, 3000

    Jan 1, 2017

  • CIM
    Materials Challenges in Mine, Mill, and Smelters

    By N. Behnood

    "This paper describes how material selection, quality assurance, and failure investigation play important roles in the efficiency and safety of mining and metallurgical operations.INTRODUCTION Materia

    Jan 1, 2015

  • CIM
    Agile Process Development and Early use of Solvent Extraction in the Mining Industry

    By Nick Hazen

    Many successful actions are required to bring a profitable extractive metallurgical operation into production. Competent process development performed within the project development schedule increases

    Jan 1, 2014

  • CIM
    Atlas Copco drill rigs for mine automation and communication—A totally new technology platform for advanced mining systems

    By M. Ramström

    "In 2002, Atlas Copco Rock Drills AB released the new rig control system (RCS) technology for all of its drill rig types. RCS opened the way for a new generation of computerized drill rigs based on mo

    Jan 1, 2005

  • CIM
    A Laboratory Protocol to Evaluate Potential Chemical Interferences in Flotation Circuit Applications

    By B. G. Cousins, B. O’Rourke, C. Spence

    "Some non-flotation chemistries are added to flotation circuits directly and indirectly to control issues such as scaling and dust. Since the dosage levels are generally not very large, a standard lab

    Jan 1, 2013

  • CIM
    An undergraduate pilot plant experience

    By L. J. Heaslip, J. M. Toguri, T. R. Meadowcroft, R. L. Addinall

    """Pilot Plant Operations"" is a final-year core course given to the Metallurgy and Materials Science students at the University of Toronto. This course involves a laboratory study of an industrial pr

    Jan 1, 1980

  • CIM
    Continuous SAG Volumetric Charge Measurement

    By Andre Vien, Jean-François Dupont

    "Over the past several years, Svedala has developed a continuous charge monitor (CCM) for tumbling mills. It consists of a strain gauge embedded into a rubber lifter and associated electronics. This p

    Jan 1, 2001

  • CIM
    Textural Analysis Provides Clue to Poor Ground Conditions in a Saskatchewan Potash Mine

    By A. Dave Mackintosh

    In 2001, at the CIM AGM in Quebec, a paper discussing poor ground conditions in a newly opened area at Agrium?s Vanscoy Potash Operation?s, suggested load transfer around old workings as a possible re

    Apr 1, 2005

  • CIM
    PT Redpath Indonesia and PT Freeport Indonesia Past and Future Development of Underground Mines

    By Bruce Mennie

    PT Freeport Indonesia (PTFI) operates copper and gold mining operations in a mountainous area of the Mimika regency, near Tembagapura, Papua (formerly, Irian Jaya), Indonesia. The mining and concent

    Oct 1, 2010

  • CIM
    Comparative Grinding Pilot Test of Grinding Balls vs. Balls/Mill Pebs Blend

    By V. K. Alves, P. Lacoste-Bouchet

    "In order to improve ball milling efficiency in pellet plants, Companhia Vale de Rio Doce (CVRD), experiments new technologies in Santa Luzia (M.G. – Brazil) research center facility. Pilot grinding t

    Jan 1, 2005

  • CIM
    Rock Strength Characterization for Excavations in Brittle Failing Rock

    By B. H. Kim

    It is hypothesized that the standard approach adopted to characterize the ground and to determine the rock strength properties at depth are flawed and generally tend to underestimate the rock strength

    May 1, 2009