Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Zinc Ferrite Treatment Options to Increase the Zinc Recovery at Teck Cominco's Trail Operations

    By M. A. Nagle

    Various strategic projects were carried out in 2002 to increase the capacity of Teck Cominco's integrated zinc-lead smelter at the Trail operations site in British Columbia, Canada. The lead smel

    Jan 1, 2006

  • CIM
    Inspection Techniques - Non-Destructive Evaluation – Mill Gear Inspection Using Eddy Current Array (ECA) Combined With Alternating Current Field Measurement (ACFM) Techniques

    By Tom Shumka

    "All mineral processing facilities that use girth gear driven mills need to inspect the gear teeth on a routine basis, whether it be every six months to every three years. The inspection frequency dep

    Jan 1, 2012

  • CIM
    Real-Time Data Reconciliation for Process Control

    By Éric Poulin, Simon Gariépy, Mario Paredes Malca

    "While the design of a control strategy depends on the available process knowledge, its implementation depends on the available process information. On-line chemical analyzers are today widely spread

    Jan 1, 2006

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Abstract Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queu

    Oct 1, 2009

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queuing networ

    Oct 1, 2009

  • CIM
    Rock Mechanics Approach for the Recovery of the Zone G Crown Pillar at the Raglan Katinniq Mine

    By P. P. Andrieux

    The recovery of the Zone G crown pillar, located between the bottom of the open pit and the top of the underground workings at the Raglan Katinniq Mine in Nunavik, started in the summer of 2008 and sh

    May 1, 2009

  • CIM
    Integrated Mining and Processing Systems Design for Eco-Efficiency

    By H. C. L. Reemeyer

    "The mining industry faces increasing economic, environmental and social challenges, as easier deposits deplete and ores become more difficult to mine and process; head grades decline; projects migrat

    Jan 1, 2017

  • CIM
    Calibration of On-Stream X-Ray Analyzers

    By Jim Lauder, Russ Calow, Ken Maley, Michael Ounpuu, Stuart T. Caverly

    "Stuart T. Caverly, Section Head XRF Laboratory, Jim Lauder, Systems Engineer, Russ Stuart T. Caverly, Section Head XRF Laboratory, Jim Lauder, Systems Engineer, Russ Concession Street, Lakefield, Ont

    Jan 1, 1996

  • CIM
    Optimization of the paste backfill plant at Louvicourt Mine (930a856d-d697-4cc4-918f-5d8dfe68aeb0)

    By Jean Cayouette

    "In 1995, Louvicourt Mine started one of the first paste backfill operations in Canada. From 500,000 tonnes in 1995, the annual paste backfill tonnage produced reached 800,000 tonnes in 1999. The maxi

    Jan 1, 2002

  • CIM
    Advantages of Tailing Disposal by Thickened Discharge

    By E. I. Robinsky

    "This paper describes a new, proven approach for tailing disposal. Not only is the disclosed system less damaging to the environment, it is also less costly to operate, to close down and maintain in p

    Jan 1, 1976

  • CIM
    An overview of Minnova's Ansil mine

    By J. Desrosiers

    "Minnova Inc. has five operating divisions thoughout Canada. One of them is Lac Dufault which was established in 1964.Lac Dufault is located 15 km north of Rouyn-Noranda, in what is known as Noranda v

    Jan 1, 1991

  • CIM
    A study on the effects of potash contamination on the performance of hydraulic components using fire resistant fluids

    By K. Szafran, R. E. L. Seal, M. Tansey

    Conversion of hydraulic equipment to fire resistant fluids has been hampered by less than satisfactory component performance and in some cases, catastrophic equipment failure. Concern over identifying

    Jan 1, 1988

  • CIM
    Simulation Numérique Du Dma Dans La Halde Sugar Shack South De La Mine Questa, Nouveau-Mexique

    By René Lefebvre

    Numerical simulations of the physicochemical processes related to acid rock drainage (ARD) in the Sugar Shack South rock pile of the Questa Mine were performed with the TOUGH AMD simulator. The object

    Nov 1, 2002

  • CIM
    Magnetic Gold: Losses from a Gold Recovery Circuit

    By Adil Aledresse, N. Emre Altun, Bern Klein, Nuri Hmidi, Brent Hilscher

    A study was conducted to investigate high gold grades in water lines and carbon fines collected from the Musselwhite gold recovery circuit. It was discovered that fine magnetic particles in the overfl

    Jan 1, 2014

  • CIM
    Milling of Noranda Process Slags

    By P. W. Godbehere, B. W. Brooks

    "This paper deals with the milling of slags from the Noranda Continuous Process, in the Horne Concentrator at Noranda, Quebec. The milling of copper slags, although novel in Canada, has been practiced

    Jan 1, 1977

  • CIM
    Fugitive Dust Control at Porcupine Joint Venture – Dome Mine

    By John Folinsbee, Brian Danyliw, Tony Y. Chong

    "Control of fugitive dust has become increasingly important in the mining industry both from a health and safety and environmental standpoint. Mining operations in particular have required improved fu

    Jan 1, 2005

  • CIM
    Capturing Energy from Ventilation Air Methane

    By D. L. Cluff

    Ventilation Air Methane (VAM) is a high volume low concentration methane source. The capture or use of methane from VAM is challenging, which results in the routine discharge of methane into the atmos

    Aug 1, 2013

  • CIM
    Chapter 14. Boilerplate

    By Karl J. C. Harries

    "14.1. INTRODUCTION1The boilerplate of an agreement is not a single provision, but a series of provisions that are expected in “every agreement”. They are sometimes also referred to as the “lawyer’s p

    Jan 1, 2003

  • CIM
    Knowledge Management for Organizational Learning and Innovation

    By Kimiz Dalkir

    Some things to keep in mind? ! What is your role in knowledge management? ! What knowledge-related challenges are you facing today? ! How does important knowledge get shared in your organization?

    May 1, 2003

  • CIM
    Explosives choice at East Kemptville Mine

    By J. M. Houston

    "In October 1982, Rio Algom Limited, purchased a tin prospect near East Kemptville, Nova Scotia, from Shell Canada Resources. This purchase led to the development of the first substantial tin mine in

    Jan 1, 1987