Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Banking/Financing Viewpoint: Beyond the Feasibility Study

    By David Laing

    Completion of a Feasibility Study represents a major milestone in the development path of a mine, and one which typically triggers a need for project financing. Obtaining funding for construction reli

    May 1, 2010

  • CIM
    Vibration Studies-Blasting and Rock Bursts

    By L. Don Leet

    Abstract Earthborne vibrations from blasting and other sources, including rock bursts, can now be recorded effectively. The nature and magnitude of vibrations from various sources have been investiga

    Jan 1, 1951

  • CIM
    Characterization of copper smelter dusts

    By C. Samuelsson, G. Carlsson

    Characterization of dust from Boliden Mineral AB’s copper-plant in Sweden was carried out using chemical analysis, X-ray diffraction analysis, energy dispersive analysis and wave length analysis using

    Jan 1, 2001

  • CIM
    Étude du gonflement des boulettes d'hématite additionnées de tourbe

    By E. Godin, M. Rigaud, S. C. Panigrahy, I. Malinsky

    "RésuméDes boulettes de concentres d'hématite spéculaire à basse silice ont été produites en substituant la bentonite par de la tourbe, adéquatement traitée, additionnée d'une faible quantil

    Jan 1, 1987

  • CIM
    Closed Circuit Precious Metals Extraction with Recycled Halogens

    By D. Gagnon, B. Dubreuil, J. -M. Lalancette, D. Lemieux

    "The pilot scale extraction of gold with a brine of sodium chloride and bromide at 30 ºC, in an atmosphere of halogens at atmospheric pressure, leads to gold chloride with 95% gold recovery. The use o

    Jan 1, 2012

  • CIM
    Two Years? Experience With Copper Anode Casting At Hudson Bay Mining and Smelting Co., Ltd.

    By A. A. McDonald

    Anode casting has been in operation for two years in Hudson Bay Mining and Smelting's Flin Flon smelter. The new plant allows all casting to be done on one shift and so achieves considerable labo

    Jan 1, 1977

  • CIM
    Review of Dust Assessment Techniques

    By C. R. Ross

    "THE ASSESSMENT of pneumoconiosis-producing dusts in mines and other industries is usually undertaken for one or more of three reasons: (1) To compare dust exposures at particular operations with stan

    Jan 1, 1960

  • CIM
    Electrolytic Zinc From Fume Produced From Trail Lead Blast-Furnace Slags

    By W. H. Hannay

    Introduction The subject matter of this paper will be treated under two heads: (1) experimental work and the development of the purification system, and (2) the operation of the commercial plant. Dur

    Jan 1, 1934

  • CIM
    Determining the Oil Sands Mining Limit With Lerchs-Grossmann O5ptimization

    By L. Chunpongtong

    ABSTRACT The mining limit in oil sands is regulated by the ratio of total mining volume (ore, interburden, and overburden) one has to mine per volume of bitumen in place (TV/BIP). This paper presents

    Jan 1, 2014

  • CIM
    Determining the oil sands mining limit with Lerchs-Grossmann optimization

    By L. Chunpongtong

    The mining limit in oil sands is regulated by the ratio of total mining volume (ore, interburden, and overburden) one has to mine per volume of bitumen in place (TV/BIP). This paper presents a mathema

    Jan 1, 2014

  • CIM
    World Potash Productive Capacity and Consumption

    By R. H. Knudsen

    "In view of the chronic overcapacity problem in the world potash industry and Saskatchewan's recent emergence as a major producer, the long-term outlook for potash productive capacity and consumption

    Jan 1, 1973

  • CIM
    International Upper Mantle Project

    By Robert J. Uffen

    YOU will likely recall the accomplishments of the International Geophysical Year of 1957, with its polar expeditions, the discovery of the Van Allen radiation belts and the spectacular launchings of t

    Jan 1, 1962

  • CIM
    Falconbridge's Copper Operations in Uganda

    By H. H. Bird

    Kilembe is situated in the foothills of the Ruwenzori Mountains in Uganda. Precambrian stratiform copper de-posits are currently being mined at a rate of 90,000 tons per month. Complex ore structures

    Jan 1, 1968

  • CIM
    Government and the Mining Industry

    By Allan F. Lawrence

    "I AM SURE you do not expect from me any learned dissertation on the problems and opportunities of the mining industry. Y our program committee must have recognized my limitations when issuing the inv

    Jan 1, 1968

  • CIM
    Geology of Allard Lake Ilmenite Deposits

    By Paul Hammond

    Abstract The Allard Lake ilmenite deposits, which are currently being developed on a large scale, occur as a series of dykes or lenticular, flat-lying bodies within the northeastern part of a large

    Jan 1, 1949

  • CIM
    Structural Development and Controls to Epigenetic, Mesothermal Gold Mineralization in the Sabie-Pilgrim's Rest Goldfield, Eastern Transvaal, South Africa

    By Michael Harley, E. Guy Charleworth

    "Bedding-parallel thrust-hosted gold veins are developed in the Sabie-Pilgrim's Rest goldfield, eastern Transvaal, South Africa. The reefs display a complex history characterized by temporally an

    Jan 1, 1994

  • CIM
    Electrostatic Beneficiation of Coal in Fluidized Beds

    By M. A. Bergougnou, I. Inculet, K. I. Burgess

    This paper describes the electrostatic methods of separating various minerals, reviews the principles of fluidization and outlines the technique of electrostatic sorting in fluidized beds. The applica

    Jan 1, 1970

  • CIM
    Understanding Vessel Integrity: A Study Of The Thermo-Mechanical Behaviour Of Refractory Lining Segments

    By T. Prietl

    Metallurgical vessel linings are multilayered, consisting of refractory bodies, insulation materials, joints, and additional space to control for thermal expansion. A unique biaxial hot testing press

    Jan 1, 2007

  • CIM
    Ore Dressing at Scully Mine

    By A. M. McKim, J. S. Ambler

    "The iron ore of the Scully Mine is upgraded from 36 per cent Fe to 66 per cent Fe through single-stage crushing, wet autogenous milling, sizing by vibrating screens and two-stage spiral separation, f

    Jan 1, 1969

  • CIM
    Operating Cost Budgets for Mines

    By Leonard Kellogg

    Introduction The Mine Manager or Superintendent is a man faced with a difficult problem. He must direct the activities of his mine in such a manner that, over a period of time, the greatest possible

    Jan 1, 1952