Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Improvement of Penetration Prediction in TBM-Tunneling by Performing on-Site Penetration TestsBy K. Thuro, L. Wilfing, H. Kasling
"In mechanized tunneling, performance prediction is a crucial issue for estimating excavation costs and construction time of a tunnel project. The aim of this work is to compare the calculated paramet
Jan 1, 2015
-
Heat Management in Mining Industry: Personal Risk Factors, Mitigation Practices, and Industry ActionsBy E. Talebi, P. Roghanchi
"This study aims to discuss personal and behavioral parameters contributing to heat-related accidents. To study the prevention approaches, it is essential to look at the various factors at the individ
Jan 1, 2019
-
Automatic control of underground vehicles at high speedBy Loui Geoffroy, Philippe Gaultier, Martin Piotte, Claude Coache, André Drouin
"Automatic driving at high speed of an underground truck was tested at Brunswick mine in September 1995. Modifications to the truck included: a remote interface to control actuators, front and back vi
Jan 1, 1997
-
The Acheson FieldBy E. E. Cudby
"FOLLOWING the Leduc discovery •by Imperial Oil in 1947, The California Standard Company began to acquire land in the area immediately west of Edmonton and in line with the Leduc reef trend (Figure 1)
Jan 1, 1952
-
Where We Stand in Slurry Flow MeasurementBy G. M. Behrend
A group of mining men attending a recent workshop on "Analysis and Control in the Canadian Minerals Industry" issued, among others, the following statement: "Slurry flow measurement is considered to b
Jan 1, 1973
-
Mechanism of Scorodite Formation at Ambient Temperature as Determined by Tem AnalysisBy H. Itou
A mechanism of scorodite formation at ambient pressure was investigated using transmission electron microscopy (TEM). Several types of iron arsenate were obtained from Fe/As solutions (Fe/As = 1.0 and
Jan 1, 2006
-
Development (Optimezation) of the Detour Lake Concentrator Flowsheet: Integration of the Results of Comminution and the Metallurgical Testwork ProgramBy A. Allaire, J. Torrealba-Vargas, R. Welyhorsky
Early testwork was carried out to select the plant process design criteria and flowsheet selection. Additional testwork was carried out during the feasibility study to support the optimization of the
Jan 1, 2011
-
Humphrey?s Spiral Tolerance to Feed VariationsBy Raymond Dallaire
The Humphrey's spiral is a static gravity separation device which cannot be adjusted to match short-term variations that occur in the feed. Any disturbance in the feed grade, per cent solids or f
Jan 1, 1978
-
The Development of an Aquatic Ecosystem in Trojan Pond, Highland Valley CopperBy Bob A. Hamaguchi
The Trojan Tailings Pond at Highland Valley Copper developed in only 15 years from a biologically inactive water body into a productive lake with a well established aquatic ecosystem. This process wa
May 1, 2001
-
NASA Lunabotics Mining Competition: 2012 Results & Taxonomy / 2013 Rules Space Resources Roundtable (SRR) Planetary & Terrestrial Mining Sciences Symposium ( PTMSS)By Rob Kelso
What is a Lunabot? ?Robot Controlled Remotely or Autonomously ?Visual and Auditory Isolation from Operator ?Excavates Black Point 1 (BP-1) Simulant ?Weight Limit - 80 kg ?Dimension Limits -
May 1, 2013
-
Measurement of In-Situ Stress Field in Polish Copper MinesBy J. Butra
The underground research presented in this paper was carried out in the two Polish copper mines: Rudna and Polkowice-Sieroszowice. The aim of the research was to determine stress field parameters. The
Aug 1, 2013
-
Non-Oxidative Nickel Leach Capacity Review through Isothermal Modelling Of Mineralogical and Chemical Concentration ProfilesBy E. Engelbrecht
"A pressure non-oxidative leach is employed at Anglo American Platinum Base Metal Refiners to extract nickel from a slow cooled matte. The design base requires two 80 m3 autoclaves in parallel to achi
Jan 1, 2017
-
Electrochemical Behavior of Axj530 Magnesium Alloy in Neutral MediumBy S. Amira
The corrosion behavior of high pressure die-cast and thixocast AXJ530 magnesium alloys has been investigated in 0.05M NaC1 solution at pH 6.0 using potentiodynamic polarization tests, electrochemical
Jan 1, 2006
-
Numerical Simulations of Cuttings Transport in Mineral Exploration BoreholesBy M. Kamyab
The Deep Exploration Technology project, as part of the Australian Cooperative Research Centre, is developing technologies to drill deep boreholes for mineral exploration purposes. The aim of the init
Aug 1, 2013
-
Manpower in the Canadian Mining IndustryBy M. A. Upham
"MINING is Canada's second largest basic industry, producing material with a gross value of 2.5 billion dollars, led only by agriculture with 2.9 billion dollars. It pro-vides employment, directly and
Jan 1, 1967
-
Géologie et géochimie de la mine Lamaque, Val d'Or, QuébecBy Paul Bedard, Réal Daigneault, Guy Perrault
"La mine Lamaque est située a Val d'Or, Québec; les roches hônes appartiennent au groupe de Malartic, partie supérieure, et sont des andésites et des pyroclastites. On y retrouve deux formes d&ap
Jan 1, 1983
-
Canam DepositBy W. R. Bacon
"The Canam property is in southern British Columbia, 24 miles southeast of Hope. It is reached by 5 miles of road from Mile 26 on the Hope-Princeton Highway.Between the years 1930, when the property w
Jan 1, 1949
-
Sixth Commonwealth Mining and Metallurgical CongressBy J. C. Mitcheson
Mr. President, Mr. Mayor, Ladies & Gentlemen: IT GIVES ME great pleasure to have the opportunity, today, to speak on behalf of all the constituent. bodies of the Common-wealth Council of Mining and
Jan 1, 1957
-
The Dissolution of Low-Iron Sphalerite in Ferric Sulphate-Sulphuric Acid MediaBy J. E. Dutrizac
The dissolution of low-iron sphalerite, (Zn,Fe)S containing 0.08% Fe, in ferric sulphate-sulphuric acid media was investigated using closely sized fractions of crushed sphalerite crystals and sintered
Jan 1, 2008
-
Continuous Evolution of Porcupine Joint Venture (PJV) Dome Mine's Effluent Treatment PlantBy T. Y. Chong, J. A. Folinsbee
Since milling began in 1909, the PJV Dome mill has been expanded several times, to the current throughput of 11,500 tonnes per day. PJV recovers free gold using crushing and grinding followed by gravi
Jan 1, 2005