Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Using Synergy between Cyanide, Oxygen, and Lead Nitrate to Improve Extraction and Reduce Opex / Capex in the Processing of Sulphide-Bearing Gold Ores

    By G. Deschênes

    "In 2013, as the prices of precious metals dropped, investors moved their positions to equity markets for higher returns. As a result, the price of gold dropped further to below US$1200 per ounce, pro

    Jan 1, 2016

  • CIM
    The Ecstall Story; The Geology Department

    By Richard R. Walker, John J. Watkins, Allen C. Amos, Matulich. Angelo

    THE KIDD CREEK MINE is located within the Abitibi greenstone belt, near its west end, in an area known as the Porcupine mining camp (Fig. 5). The Abitibi belt, long known for its many major gold and b

    Jan 1, 1974

  • CIM
    The Base of the Cambrian System in the Southeastern Cordillera of Canada

    By R. A. Price

    The base of the biozone of Olenellus is accepted as the most universally applicable criterion for defining the base of the Cambrian System. The use of this definitive criterion is restricted by import

    Jan 1, 1956

  • CIM
    Study on New Technology for Refractory Multi-Metallic Pyrochlore Ore from Africa

    By Guangdong Institute of Resources Comprehensive Utilization, Y. H. Tang, H. X. Hu, T. S. Dong, Z. H. Zhang

    "A world class rare metals ore deposit in Africa belongs to a massive granite type poly-metallic pyrochlore-niobium resource. Successful project development in realizing the resource is vital to Afric

    Jan 1, 2016

  • CIM
    Study on New Technology for Refractory Multi-Metallic Pyrochlore Ore from Africa (1e0018ad-d770-4bd8-98e5-543ca6790805)

    By Guangdong Institute of Resources Comprehensive Utilization, Y. H. Tang, H. X. Hu, T. S. Dong, Z. H. Zhang

    "A world class rare metals ore deposit in Africa belongs to a massive granite type poly-metallic pyrochlore-niobium resource. Successful project development in realizing the resource is vital to Afric

    Jan 1, 2016

  • CIM
    Predicting Patterns of Slurry Flow within and Discharge from a 3D Pilot SAG Mill

    Slurry flow, including flow through the charge, through the discharge grates, along the pulp lifters and its discharge from the mill is an important contributor to the efficiency of the grinding proce

    Jan 1, 2012

  • CIM
    Hybrid CFD-Network Methodology for Improved DPM Modelling

    By Nick Vayenas, Ming Cai, Hongbin Zhang Lorrie Fava, Enrique Acuña

    "A hybrid methodology is proposed to improve the accuracy of Diesel Particulate Matter (DPM) concentrations simulated in a ventilation network model by using Computational Fluid Dynamics (CFD). DPM, a

    Jan 1, 2019

  • CIM
    The Coal Problem in Great Britain and the World

    By John T. Whetton

    "FROM 1850 when the annual production was around 50 million tons, coal output in Great Britain expanded rapidly to 225 million tons in 1900 and 287 million tons in 1913. However, during the First Worl

    Jan 1, 1960

  • CIM
    Experience in the Low Pressure Casting in Printed Molds of a Thin Bladed Aluminum A356 Impeller

    By G. Morin, F. Chiesa, B. Tougas, B. Duchesne, Jocelyn Baril, N. Giguère

    "An aluminum A356 compressor impeller was sand cast using the Low Pressure technique. The casting was limited in size (170 mm in diameter, 1.2 kg in weight) and very intricate in shape thus making 3D

    Jan 1, 2018

  • CIM
    Potential Sources of Alumina in Canada

    By W. K. Gummer

    "THE LOCATION of Canada's present aluminum industry is determined by availability of hydroelectric power, and ready access to ocean transport facilities. The chief raw material for the production of t

    Jan 1, 1952

  • CIM
    Stratigraphic and structural setting of gold-bearing shear zones in the yellowknife greenstone belt

    By W. A. Padgham, H. Helmstaedt

    Field evidence for current hypothe e about age and kinematic ignificance of gold-bearing hear zones in the Archean Yellowkni fe greenstone belt is reviewed , and it is concluded that major disagreemen

    Jan 1, 1986

  • CIM
    Some Aspects of Mineral Adequacy

    By Edward Sampson

    Bases of National Power At a time when the economy of the world is in a particularly troubled state it is appropriate to examine some problems of the distribution of natural resources. I should lik

    Jan 1, 1949

  • CIM
    Metallurgical Dust Collection in the Open Hearth and the Sinter Plant

    By A. C. Elliott, A. J. Lafreniere

    THE Hamilton Works of The Steel Company of Canada is a fully integrated steel plant with an annual capacity of three million tons. Located on the south shore of -Hamilton bay, it is in the centre of H

    Jan 1, 1962

  • CIM
    METSIM® as a mass balancing tool for platinum-group metal concentrators

    By M. Greyling, C. Panaou, M. Bellino

    Commonly the most frequent method of calculating the overall mass balance of a multi mineral platinum-group metal (PGM) concentrator circuit in Southern Africa has been through the use of spreadsheets

    Jan 1, 2005

  • CIM
    Development of an Air Permeability Test Method and Application to Underground Mining

    By S. Klemmer

    Potential problems associated with groundwater inflows are a major concern to many Saskatchewan mining operations. Rock mass behaviour and stability have been linked to groundwater inflow potential. A

    Nov 1, 2011

  • CIM
    Modern Mining Operations and the Executive

    By J. H. McMillan

    Most of the recent papers read before the Institute have dealt with purely scientific matters, or with experiences in the various phases of mining operations. Very little, if anything, has been said c

    Jan 1, 1925

  • CIM
    Geology of New Brunswick potash deposits

    By Paul W. Kingston

    In New Brunswick, during the 1970's, rocks of the Lower Carboniferous Windsor Group in the Moncton Basin of the Fundy Epieugeosyncline have been the target of intense exploration and drilling pro

    Jan 1, 1979

  • CIM
    Integrated Pit-to-Port Planning, Optimisation and Delay Accounting

    The Challenges in Mining _Large expensive assets that are not being utilised as well as they should _?Silo? operations plan, schedule and execute in isolation?poor visibility across the Value Chai

    Nov 1, 2011

  • CIM
    Erosion Control Hollinger Mine Tailing Site

    By I. M. Gordon

    "INTRODUCTIONThe Hollinger tailing disposal plant is situated about 1 1/4 miles south of the mill. The area available for tailing covers 620 acres and is roughly 1 ¼ miles long by ¾ mile wide.Tailing

    Jan 1, 1969

  • CIM
    Modelling Heavy-Tailed Coarse Gold Deposits with a Spatial Point Process

    By J. B. Boisvert, W. Board, C. R. Mooney

    "Traditional geostatistical modelling methods are difficult to apply to heavy-tailed deposits because the extreme positive skew of the grade distribution leads to bias. The focus here is on an innovat

    Jan 1, 2015