Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Process Development for Milling B-Zone Ore at Rabbit LakeBy S. Dicarlo
"In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia
Jan 1, 1988
-
Mining Operations at Carol Project Iron Ore, Company of CanadaBy Engineering Staff
In 1958, the Iron Ore Company of Canada decided to proceed with the Carol Project. The ore deposits in the area are part of the highly metamorphosed southern zone of the Labrador Trough. They lie alon
Jan 1, 1962
-
Sulphur Compounds and Metal removal using Bioprocess TechnologyBy Andre L. De Vegt, Cees J. N. Buisman
"For the past eight years Paques has been engaged in the development and installation of treatment systems based on biotechnological processes to remove sulfur compounds from water, air and gaseous st
Jan 1, 1997
-
The Aurora Super-Pump, a Large Diameter Slurry Pump for Aurora NorthBy D. Wolfe, R. Cleminson
"The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. The slurry systems at Aurora experience high rates of wear, and miss
Jan 1, 2013
-
Geometallurgical Characterisation and Representative Metallurgical Sampling at Xstrata Process SupportBy J. Sliwinski, J. Oliveira
"The application of geometallurgy and corresponding sample selection can take on several formats within industry. Current practice can range from a strictly geostatistical approach to one in which geo
Jan 1, 2013
-
A Study of Cemented Crude Tailings Backfill Technology Based on Vertical Sand SilosA key point in the manufacture of cemented backfill is the dewatering and settlement of the total tailings product. A new technology characterized by rapid non-mechanical settlement of total tailings
May 1, 2007
-
A Conceptual Circuit Development for Gold Processing Based on Bromine/Bromide LixiviantBy Mike Dry, Mani Manimaran, Mykolas Gladkovas, Mariam Melashvili, Chris Fleming
Development of a new hydrometallurgical flowsheet requires quantitative description and optimisation of all chemical processes in each step in the process, as well as mass and energy balances across a
Jan 1, 2015
-
Laboratory Investigation of Hydraulic Fracture Growth through Weak Discontinuities with Active Ultrasound MonitoringBy James Kear, Romain Prioul, Robert G. Jeffrey, Andrew P. Bunger, Dimitry Chuprakov
"Unconventional gas and geothermal reservoirs are typically naturally fractured and therefore the challenging problem of hydraulic fracture (HF) growth through naturally fractured rocks is an importan
Jan 1, 2015
-
The Development of an Integrated IT System at Albian Sands EnergyBy Louise H. Michaud
Albian Sands Energy is scheduled to begin production at its oilsands operations in the fall of 2002. Start-up includes the selection and implementation of over 75 IT systems or computer applications.
May 1, 2002
-
Managing pit slope displacements: Highland Valley Copper’s Lornex pit southwest wall (f470f4fd-a370-4a43-8de1-ec8dbdd94f5c)By C. S. Maggs, L. Shwydiuk, H. W. Newcomen
The southwest wall of the Lornex Pit at the Highland Valley Copper mine has been experiencing slope displacements since 1978. Measures to manage the displacements on previous pushbacks have included s
Jan 1, 2003
-
Characterization of Damage in a Cast Aluminum Alloy during Cyclic Loading Test at High Temperature by X-Ray TomographyBy A. Koster, V. Maurel, S. Dezecot, Szmytka. F.
The aim of this work is to clarify the role of microstructure heterogeneity in the initiation and growth of cracks in a lost foam cast A319 for low cycle fatigue (LCF) loading condition. Because 2D an
Jan 1, 2015
-
The Operating Range Method for Backfill HydraulicsBy D. J. Hallbom
This paper presents a novel methodology for the hydraulic design of mine backfill distribution systems. The ?operating range? method uses the concepts of the hydraulic grade line and equivalent pipe l
May 1, 2007
-
The Wabush Mines ConcentratorBy Timothy R. Eby
"The Wabush Mines project was formed in 1956 to develop a large iron ore property in Western Labrador. The town of Wabush along with the mining and concentrating facilities are located 640 air miles f
Jan 1, 1978
-
Narrow-vein Mining Experiences at the Ashanti Mine: A Case StudyBy Fidelis T. Suorineni
The Ashanti mine, located in Obusai, Ghana, West Africa, has been in production for over 100 years, and is currently the second largest single gold producer in Africa. The mine covers a concession are
Oct 1, 2001
-
Evaluation of the Tower Mill as Regrind MachineBy J. M. Menacho, J. M. Reyes
"Batch and continuous regrind tests were conducted in 3 kW and 15 kW tower mill units, respectively. Single particle size classes of a chilean copper sulphide concentrate were employed in the batch te
Jan 1, 1989
-
Grinding media evaluation at Brunswick MiningBy R. Grant, C. Bazin
"Brunswick Mining has investigated grinding media optimization for the purpose of improving the flotation feed and regrind product size distributions to enhance metal recoveries. This paper presents t
Jan 1, 1994
-
Graphical-Analytical Model of the Generation of Methods and Variants of Methods of Digging, respectively of the Technologies and Technological Variants of the Execution of the Underground Mining WorkBy Nicolae Dobritoiu
The literature in this field and the practical activity record that a method, respectively the technology used for an underground mining work have many components which, in order to be applied, demand
Oct 1, 2009
-
Flowsheet Development for the Hypogene Geomet Unit in the Ivanplats Kamoa Copper ProjectBy S. R. Amos, N. O. Lotter, A. L. Hannaford, J. F. Oliveira, D. W. Broughton
"Ivanplats Ltd appointed Xstrata Process Support to perform the flowsheeting development work for their hypogene and supergene geomet units of the Kamoa Copper deposit, located in the Democratic Repub
Jan 1, 2013
-
Hydrothermal Preparation and Characterization of LiMn2O4 for LI-ION Battery ApplicationBy W. J. Li, L. Kong, G. L. Li, X. M. Xi, J. Qiu
"A novel hydrothermal method was applied to prepare the precursor of LiMn2O4 using pre-treated electrolytic manganese dioxide (EMD) and lithium hydroxide as the main raw materials. The precursor was s
Jan 1, 2012
-
The Abatement of Acid Mine Drainage in OntarioBy John R. Hawley
"This paper is intended as a review of the progress that has been made in the Province of Ontario in the field of acid drainage waste treatment technology.Three years ago, at the Third Annual Meeting
Jan 1, 1974