Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Blast Hole Burden Design Introducing A FormulaIn blasting large tonnages of ore or material, the economy of the operation 'depends mainly on the mine manager's judgment in placing the holes to the best possible advantage and in determin
Jan 1, 1952
-
Processing Copper-Gold Ore at Ok TediBy Kanau JL, Kilgour I
This paper describes the metallurgical processes at the 80 000tpd Ok Tedi Mining Limited concentrator, which treats copper- gold ore by single-stage crushing, SAG and ball milling and flotation to
Jan 1, 1991
-
The Investigation of High Density and Paste Fills for the Enterprise Mine Expansion Project at Mount Isa (ee90997b-915a-4723-962c-df13e11cf8b6)By Kuganathan K, Potvin Y
Enterprise Mine at Mount Isa is to expand ore production from the current 1.4 to 3.5 mtpa by mining the 3500 Orebody, from which production is scheduled to start in February 1998 making this the dee
Jan 1, 1998
-
Paper No. 170. Fine Grinding Test: Tube Mill And Grinding Pans. Broken Hill South Mine.IN December, 1905, a Forwood down-wheeler grinding pan (5 ft dialmter), and similar in design to those in use on the Kalgoorlie goldfields, was installed for experimental work in connection with fine
Jan 1, 1909
-
Advances in Coarse Particle Flotation - Copper and GoldBy H Thanasekaran, J Kohmuench, B Seaman
To achieve an efficient separation in the flotation process, valuable particles need to be selectively segregated from the gangue while utilising a minimum number of flotation stages. TodayÆs existing
Jul 15, 2013
-
Ground Stability Problems Associated with the Black Rock Open Cut at Mount IsaOpen cut mining of the Black Rock chalcocite ore started in 1963. A ground movement monitoring programme was commencing in the early stages of mining when signs of instabilityof the western wall becam
Jan 1, 1968
-
Practical measures of process efficiency and opportunityBy G R. Ballantyne, A N. Mainza, M S. Powell, M Evertsson
Quantifying the performance of a comminution circuit relative to the potential that can be achieved is a standard requirement in justifying operating practice (the stick) and seeking operational upsid
Aug 24, 2022
-
Several Approaches to Enhance the Bioleaching of EnargiteSeveral Approaches to Enhance the Bioleaching of Enargite Some approaches were investigated to enhance the recovery of Cu from enargite by bioleaching with Acidithiobacillus ferrooxidans using the ga
Sep 13, 2010
-
Thin spray liners for face support at KanmantooBy B Roache
Ground support installation into the face of development headings has become an accepted practice at many Australian hard rock mines. Ground support is installed in the development face to reduce pers
Mar 29, 2023
-
Presidential Address, 1970 Men for MineralsThis evening I would like to speak about men for the mineral industry.It is trite to say that the mining industry is expanding rapidly and that technically trained men are in short supply. How short i
Jan 1, 1970
-
Some Observations on Metamorphism at Broken Hill, N.S.W.The Archaeozoic Willyama Complex at Broken Hill has suffered several periods of deformation and metamorphism. New structural and petrological information together with that available from the literatu
Jan 1, 1963
-
Notes on the New Broken Hill Consolidated Ltd. Service ShaftThis paper briefly describes the shaft, including sinking, steel sets and their installation, shaft equipment and winders.INTRODUCTIONThe New Broken Hill Consolidated Ltd. Service Shaft is a vertical
Jan 1, 1957
-
Sampling and Grade Control Pratices at Misima MinesThe Misima open pit gold mine is a 20Mt per annum operation. Blasthole drilling is used to sample all material at a uniform 5m square pattern, and representative sub- sampling of the blast holes en
Jan 1, 1991
-
Queensland Mines Should Consider Climate Change Impacts for DecommissioningBy M C. Evans
"Mine decommissioning is the final phase in a mining project. Planning for decommissioning must commence for a proposed mine even before the government approves it. Queensland mining approvals require
Jul 16, 2014
-
Size Separation Pretreatment and Alumina Recovery from Bayer Red MudSize Separation Pretreatment and Alumina Recovery from Bayer Red Mud
Sep 13, 2010
-
The Relationship of Structure and Ore Deposition at Stawell Goldfield, VictoriaThe Stawell Goldfield, the westernmost of the main Victorian fields, has produced over a million and a quarter ounces of gold from one and three-quarter million tons of ore. The lodes are quartz reefs
Jan 1, 1960
-
Bulk Sampling of Complex Gold Deposits - Material Characterisation and Program Design and ManagementBy I M. Platten, Y Xie
Complex gold deposits are generally characterised by variable geometries, strong structural controls on grade distribution and a high-nugget effect. The use of diamond drilling and fire assays in this
Jan 1, 2008
-
Challenges of Developing Low-Grade Deposits in æNew WorldÆ Countries from a Mining ConsultantÆs PerspectiveBy L Lorenzen, H Muller, L Bernard
Australian companies and consultants are becoming ever more involved in projects in African, South American, East European and Middle Eastern countries. However, significant differences in culture and
Sep 26, 2013
-
Mount Isa Cut and Fill (MICAF) StopingABSTRACTMechanised cut and fill stoping in the Racecourse orebodies between II and 9 levels was started in 1964.Five stopes are in progress over the two level interval, extracting the full strike leng
Jan 1, 1968
-
Deformation by Creep of a Specimen Lead Consisting of Five Large CrystalsThis paper describes the behaviour, under creep conditions, of a cast lead creep specimen consisting of five crystals, the boundaries of these crystals being substantially at right angles to the direc
Jan 1, 1941