Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
One Orebody ù Two Tenements ù Multiple Owners: How to Apportion Costs and Production Equitably Over the Mine Life?Production sharing and cost apportionment in joint ventures is commonplace in Australasia today and elsewhere. It is a recognised convention that, with the exception of a free carry situation, joint v
Jan 1, 2002
-
Trajectory Design and Economic Analysis of Asteroid Mining Missions to Asteroid 2014 EK24By S Dorrington, J Olsen, N Kinkaid
Several studies have been conducted on the economic analysis of mining near-Earth asteroids for resources for use in Earth orbit. While these studies use detailed economic figures of merit, they often
Nov 4, 2015
-
Secondary means of egress via emergency gigBy R Austerberry, S Green
The discovery of the Cuffley Lode at Mandalay Resources Costerfield Operations provided an opportunity to extend mine life via mining the offset depth extension of the previously worked Alison Mine. A
Mar 15, 2021
-
Geotechnical Models and Data Confidence in Mining Geotechnical DesignBy M J. Dunn
The geotechnical model is the cornerstone of any mining geotechnical design and as such the confidence level and reliability of the geotechnical model is paramount. The geotechnical model confidence l
Nov 5, 2014
-
Testing new estimation techniques – rank and replace: a stockwork case studyBy D Finn, D Kentwell
Experience has shown that the E-Type multiple indicator kriging (MIK) estimation technique often works well for resource estimation in stockwork mineralisation that contains a mixture of high and low-
Sep 20, 2017
-
Geochemical and Mineralogical Characterisation of Two Contrasting Waste Rock Dumps ùThe INAP Waste Rock Dump Characterisation ProjectBy P Fines, D J. Williams, G W, S Miller
This paper presents the results and findings of geochemical and mineralogical testwork conducted on samples collected from waste rock dumps at two mine sites, located in South Carolina, USA (Site 1) a
Jan 1, 2003
-
Breakthrough in elliptical motion screen trial delivers significant performance gainsBy D Teyhan, J Kirsch
Traditionally, most Australian iron ore mining operations have been surface-based. Processing plants were designed to handle dry ores. In recent years mining operations in the Pilbara have progressive
Nov 8, 2021
-
The Miner's Guide to a Better Environmental PerformanceBy G MORRIS
The mining industry has been rightly proud of its environmental achievements and it would be fair to say that in some areas the Australian mining industry is at the forefront of world practice in e
Jan 1, 1992
-
Earthmover Tyre Operations at Coal and Allied's Hunter Valley No. 1 MineCoal production from Coal & Allied's Hunter Valley No 1 open cut is presently hauled 10 km by road to washing and train loading facilities at Liddell. This road haul, using bottom dump trucks
Jan 1, 1982
-
Characterising the Blasting Properties of Iron OreBy A Scott, I Onederra
Most iron ores occur in mine benches as complex mixtures of lithologies and ore types. This significantly complicates their characterisation for both blast design and fragmentation modelling. A great
Jul 13, 2015
-
Protection of Sacred Sites in the Northern TerritoryThe role and policies of the Aboriginal Sacred Sites Protection Authority are described in conjunction with the provisions of the N.T Aboriginal Sacred Sites Act 1978. Comment is made on the appli
Jan 1, 1984
-
Gold Dredging In New ZealandThe history of gold dredging in New Zealand, leading to the develop- ment of the `New Zealand Type' dredge is considered. Much of this infor- mation has come from contemporaneous publications by
Jan 1, 1988
-
(U-Th)/He Geochronology of Channel Iron Deposits, Robe River, Hamersley Province, Australia – Implications for Ore GenesisBy M Danišík
Two drill core samples of haematite/goethite from the Robe River (Western Australia) channel iron ore deposits (CID) were dated using (U-Th)/He methods in order to constrain the timing of iron oxide f
Jul 11, 2011
-
The Mineral Industry in a Changing WorldBy A J LYNCH
It was Harold McMillan, Prime Minister of England 30 years ago, who used the phrase "The Wind of Change" to describe political events in Africa in his day. So well did this phrase capture the spiri
Jan 1, 1989
-
Ten conditions that will change the work of managers in Mining 4.0By J Johansson, J Lööw
There are many reports about how the new technology will affect our work, sometimes they are utopian but often dystopian. Most of the visions describe the industrial work, while the work of the manage
Sep 1, 2024
-
Lead Smelting at Sulphide Corporation Ltd.'s Cockle Creek WorksTHIS paper is not intended to be a detailed description of the lead, smelting plant at Cockle Creek, as this has been covered in previous papers for the Institute in 1918, Proceedings No. 31, by other
Jan 1, 1923
-
Scale Suppression using Swirl Flow TechnologyBy J Wu
Swirl Flow Technology (SFT), a novel approach for agitation in large industrial slurry tanks, was jointly developed and patented by CSIRO and Queensland Alumina Ltd (QAL). Currently, SFT is used in 16
Aug 8, 2011
-
Approaches to Reporting Grade Uncertainty in High-Nugget Gold Vein ProjectsBy W B. Edgar, S C. Dominy
High-nugget effect vein-gold systems are generally considered to be one of the most challenging of deposit types to evaluate and exploit. To potential investors and mining companies, they are viewed a
May 24, 2012
-
Wall Control Blasting Practices at BHP Billiton Iron Ore Mt WhalebackBy C T. Dunbar, P A. Walker, G E. LeJuge
A programme of blast improvement was initiated at the Mt Whaleback iron ore mine by BHPIO management in early-1998. One component of that work was the need to improve wall control blasting practices t
Jan 1, 2001
-
The Re-Opening of the Morning Star Gold Mine: A Case Study of the Ongoing Environmental Monitoring and PlanningBy E Hogan, M Goodz, R Wright
The planning, permitting and monitoring procedures of the re-opening and rehabilitation of mine sites is an ongoing process which must continue throughout and beyond the life of the project. Both indu
Jan 1, 1992