Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Geomorphology of the Channel Iron Deposit in Bungaroo Valley - The Formation of an Irregular Basal Topography and its Impacts on Resource Recovery

    By L Terrusi

    The Bungaroo Valley hosts a concealed Tertiary channel iron deposit (CID) along a 17 km stretch of its length. Bungaroo Valley is approximately 0.5 km wide upstream at its easternmost extent, and 3.5

    Jan 1, 2007

  • AUSIMM
    Development of Blast Furnace Slag as an Aggregate on Road Surfacing

    By Simpson JF, Murrie SJ

    In determining new areas for slag disposal a foamed slag aggregate has been developed for use as a skid resistant material. The foaming of the slag does not rely on the use of water, but rather on

    Jan 1, 1979

  • AUSIMM
    Product Monitoring, Grade Control, and Ore: Waste Reconciliation at Bougainville Copper Limited (BCL)

    An effective production control system should maximise recovery of economic material from the resource. To do this, internal waste must be accurately delineated and efficiently removed. Achieving

    Jan 1, 1986

  • AUSIMM
    A Model of Gas Flow During Outbursts

    By Otuonye F

    An outburst is the spontaneous ejection of pulverized coal and gas from the working face in an underground mine. It is caused by overstressing the rock, due predominantly to the influence of geolo

    Jan 1, 1988

  • AUSIMM
    Milling Methods and Cost at the Concentrator of the Mount Isa Mines Ltd., Mount Isa, Q.

    LOCATIONThe property of the Mount Isa Mines Ltd. is situated in Western Queensland, 603 miles by rail west of Townsville, the nearest seaport. All supplies and the bullion are railed between Mt. Isa a

    Jan 1, 1933

  • AUSIMM
    The Development of Hilton Mine, 1947-1985

    By Mutton B. K

    Hilton Mine is being developed as an integrated component of the Mount Isa operation, to achieve continuity of silver/lead/zinc production well into the next century. The mine has a chequered hist

    Jan 1, 1986

  • AUSIMM
    Application of Virtual Reality Technology to Mine Management

    By Mallett C

    Coal mines are dynamic systems that change continually in size, shape, and condition. Large quantities of data about production, coal quality, ground stability, ventilation monitoring, equipment perfo

    Jan 1, 1998

  • AUSIMM
    Quantifying Uncertainty in a Narrow Vein Deposit – An Example from the Augusta Au-Sb Mine in Central Victoria, Australia

    By A Fowler

    The unpredictability of the location, grade and width of narrow-vein deposits presents difficulties for mine geologists and engineers attempting to estimate, schedule, forecast and mine their deposit

    Aug 22, 2011

  • AUSIMM
    Advances in Petroleum Exploration Technology 1963-1982

    A major tool in the search for petroleum is reflection seismic mapping. The period which has seen most of the exploration in Victoria is also one which has seen major advances in this technology,

    Jan 1, 1982

  • AUSIMM
    Numeric Modelling of Fluid Flow, Heat Transfer and Combustion in the Kalgoorlie Nickel Smelter

    By Koh P. T L, Varnas S. R

    Fluid flow, heat transfer and combustion in a nickel flash smelter have been investigated by numerical modelling and flow visualisation. The three-dimensional numerical model incorporates turbulent

    Jan 1, 1992

  • AUSIMM
    Sulphide Dust Explosion - Laboratory Ore Dust Ingnition and Degree of Oxidation Test

    With the recent increase in the number of underground secondary sulphide dust explosions in Canada, Australia and elsewhere in massive sulphide ore mining industry, establishment of quantitative a

    Jan 1, 1988

  • AUSIMM
    On-Line Ash Sensing in Coal Flotation Slurries

    A system for rapid on-line determination of weight percentage coal in slurry and weight percentage ash in coal has been developed at the Julius Kruttschnitt Mineral Research Centre, University of

    Jan 1, 1978

  • AUSIMM
    The Application of Linear Programming to the Blending of Coals for Export

    The application of new and currently practised mining techniques in new areas and at greater depths necessitates considerable and immediate research effort. This effort is aimed at identifying the

    Jan 1, 1981

  • AUSIMM
    The Standardisation of Explosives Ratings by Ideal Detonation Codes

    By Sarracino R. S

    A number of ideal detonation codes are used internationally for estimating the strength of explosives compositions. Important and far reaching decisions by explosives users are ofen based on the pre

    Jan 1, 1990

  • AUSIMM
    Polypropylene Membrane Filters

    Filter Presses are used in a wide range of process industries where high quality filtration at elevated pressure is required. This is mainly due to the fact that modern presses are fitted with poly

    Jan 1, 1989

  • AUSIMM
    Mitigating Geothermal Hazards at Lihir Gold Mine

    By R Rodriguez, S Gumo

    The Lihir Gold Mine, in Papua New Guinea, is a large open pit operation within an active geothermal system inside a collapsed volcanic crater. This unique setting has a big impact on the mine operatio

    Jan 1, 2007

  • AUSIMM
    Integrated Approach to Mine Groundwater Assessment

    By B Mil, D P. Adhikary, M S. Craig, P Rutzou

    As shallow coal reserves with easier mining conditions are exhausted, future deep coal mining with difficult mining conditions may face significant economic, technical and environmental challenges. Mo

    Jan 1, 2006

  • AUSIMM
    Sampling and Blending at Mount Newman Mining Co. Pty. Limited

    Mt. Whaleback is in the Pilbara region of Western Australia approximately 1200 kilometers north of Perth, the State capital. In this deposit the Mt. Newman Joint Venturers are mining ore reserves to

    Jan 1, 1976

  • AUSIMM
    Lessons learnt in geotechnical investigation and stability analysis for upstream tailings storage facility raise design

    By C Armstrong, B Wentzinger

    Upstream embankment raises often represent the lowest cost option for increasing the capacity of tailings storage facilities (TSF), but also pose the highest stability risk due to constructing on top

    Jul 23, 2018

  • AUSIMM
    Current Project of the Geological Survey of Queensland in Northern Queensland

    By Kay JR

    In 1984 a new Regional Geological Mapping Program (RGMP) was commenced by the Geological Survey of Queensland (GSQ); the new program was in response to the withdrawal of the Bureau of Mineral Resource

    Jan 1, 1986