Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geomorphic design and landscape evolution modelling for best practice mine rehabilitation

    By G R. Hancock, J F. Martín Duque

    Post-mining landscapes are required to geomorphologically and ecologically integrate with their surrounds (Martín Duque et al., 2015). Designing and constructing an erosionally stable landform is

    Jul 25, 2018

  • AUSIMM
    Iron ore mining in proximity to a significant Aboriginal heritage rock shelter, Pilbara Region, Western Australia

    By J J. Jiang, B G. Bow

    Atlas Iron Limited’s (Atlas) Abydos Mine has developed its Scarborough open pit proximal to a rock shelter that has been assessed as a significant Aboriginal heritage site by the Traditional Owners of

    Jul 25, 2018

  • AUSIMM
    Queensland Mines Plant Trials with Caro's Acid

    By Ring R. J, Waters D. J, Vautier F. E, Fulton E. J

    Laboratory leach tests have been carried out by the Australian Atomic Energy Commission to compare the effectiveness of Caro's acid (permonosulphuric acid) as an alternative oxidant to pyrolusite

    Jan 1, 1983

  • AUSIMM
    Mineral liberation studies of IMPTEC super-fine crusher – 130 crushed product

    By J Addai-Mensah, W Skinner, C Kelsey, J R. Kelly, E Baawuah

    Comminution continues to be the most capital-intensive unit operation in mineral processing. The fundamental purpose of comminution is to liberate the valuable minerals so that they can be economicall

    Aug 29, 2018

  • AUSIMM
    Leach Residue and Pregnant Liquor Separation – Process and Capital Comparison of Counter-Current Decantation and Counter-Current Washing with Vacuum Filtration

    By R Klepper

    Separation of leach residue suspended solids from pregnant liquor solution is an important step in hydrometallurgy flowsheets. Alternative flowsheet options are counter-current decantation (CCD) thick

    Aug 8, 2011

  • AUSIMM
    Integrating Environmental Impact Assessment into Life-of-Mine Planning

    By J Jones, J Blunt

    "The requirement for environmental approvals and associated environmental impact assessments (EIAs) is now commonly regarded as a key milestone and body of work during project development. EIAs can be

    Jul 10, 2012

  • AUSIMM
    Modelling Dust Plume Movement Resulting from Surface Blasting Operations

    By S Bhandari

    A model for predicting dust plume dispersion from blasting operations using the Eulerian mathematical algorithm has been developed. This model considers atmospheric stability, and wind velocity and di

    Nov 8, 2011

  • AUSIMM
    Current Situations, Problems, Countermeasures and Suggestions for ChinaÆs Metal Mine Development

    By L B. Zhou, S Li, B L. Wang, S B. Li, Q Wang

    The rapid development in ChinaÆs metal mine resources has caused a series of mine environment problems such as serious ecological damage and environment pollution, and secondary geological disasters.

    Jul 10, 2012

  • AUSIMM
    Realising the Potential of the Boolgeeda Iron Formation – Stratigraphy and Iron Mineralisation at McCamey’s North, Hamersley Province, Western Australia

    By P J. Howard

    Atlas Iron Limited’s McCamey’s North project lies at the eastern end of the Hamersley Basin, approximately 50 km east of Newman, Western Australia, and 3 km northeast of BHP Billiton’s Jimblebar Mine.

    Jul 11, 2011

  • AUSIMM
    Gas Evolution Trends for Coal from Two Different Areas at Clarence Colliery

    By J Sargeant, T Levi, J Theiler, B Beamish

    Two coal samples (810 Panel and Area 900) collected from Clarence Colliery have been tested under a controlled heating procedure to evaluate the gas evolution trends corresponding to increasing temper

    Aug 31, 2015

  • AUSIMM
    Long hole plug – addressing the hazard of bogged rods in ‘upholes’

    By G Noonan, S Thomas, M Limbert

    Stuck drill rods (often referred to as bogged rods) in production ‘upholes’ are a common problem in the underground mining industry. Bogged and broken off drill rods have the potential to fall out of

    Oct 16, 2017

  • AUSIMM
    Applications of Advanced Remote Sensing Systems during a Mine Life

    By B P. Banerjee, S Raval

    In the recent past there have been dramatic advancements in the development of remote sensing platforms (satellite, aircraft and unmanned aerial vehicles – UAVs) as well as sensor systems (multispectr

    Jun 28, 2016

  • AUSIMM
    Waste Rock Pile Construction to Lower Closure and Relinquishment Costs

    By J R. Taylor, J A. Muchan, S M. Pape, B S. Davis

    Acid and metalliferous drainage (AMD) is routinely derived from waste rock, tailings, pit wall rock, underground mine voids, heap leach pads, ore stockpiles, concentrate stockpiles and even slag piles

    Jun 28, 2016

  • AUSIMM
    Project Hobson – New Technology in Auckland

    By T Ireland

    The Project Hobson tunnel excavation was the first use in New Zealand of an earth pressure balance (EPB) tunnel boring machine (TBM). The tunnelling on the project was very successful and break-throug

    Mar 8, 2011

  • AUSIMM
    Production Schedule Optimisation – Meeting Targets by Hedging against Geological Risk while Addressing Environmental and Equipment Concerns

    By M Spleit

    A long-term production schedule for the LabMag iron ore deposit in northern Quebec, Canada is derived using stochastic integer programming. The optimisation formulation maximises the schedule’s net pr

    Nov 24, 2014

  • AUSIMM
    Measurements and Modelling of Evaporation from Abandoned Mine Pit Lakes

    By T van Niel, M Trefry, B Baker, I Rea, A Hawdon, D McJannet, D Boadle, R Fandrich, A Littleboy

    Many open cut mines extend to depths well below the natural water table level with constant dewatering required to maintain operations. When mining activities cease the groundwater starts to fill the

    Jun 28, 2016

  • AUSIMM
    Application of High Efficient Fine Screen to Improve the Recovery of Tin Concentrate

    By W N. Qin, B Zhang, W Z. Huang, X S Mo

    Mengzi Mining and Metallurgy Co, Ltd (MMMC) polymetallic ore contains recoverable amounts of tin, lead, zinc, pyrite and other valuable minerals. With the change in orebody, the run-of-mine (ROM) ore

    Sep 1, 2014

  • AUSIMM
    Viable and feasible decarbonisation – Tent Mountain coalmine repurposing for the clean energy economy

    By B D. Saffron

    In 1983, open cut coal mining operations were suspended at the Tent Mountain coalmine, located in Alberta, Canada in an area called Crowsnest Pass. Montem Resources (‘Montem’), an Australian mining co

    Aug 2, 2023

  • AUSIMM
    Design and Specification of Permanent Shotcrete Tunnel Linings

    By D Mather

    Fibre reinforced shotcrete has long been accepted as temporary ground support in both mining and civil tunnel linings. Greater knowledge and understanding of shotcrete as an engineering material and a

    Mar 8, 2011

  • AUSIMM
    Measuring ore quality using real-time on-belt elemental analysis – more than grade control

    By H Kurth

    Mining geologists utilise many technologies to map, sample, measure, model and plan before and during the mining process. Predicted ore quality rarely corresponds with feed quality determined by proce

    Sep 20, 2017