Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mass Blasting at Elura Mine

    By G Kennewell

    At 11 am Monday 8 September 1997, the successful detonation of the 5/9 Mass Blast at Pasminco - Elura was signified by the subsiding of æMt KevinÆ (a 15 m high earth fill mound). The blast was in resp

    Jan 1, 1999

  • AUSIMM
    Geotechnical strata characterisation using geophysics and its application for coal mine design

    By T Medhurst

    Recent developments in geophysical borehole log analysis using the Geophysical Strata Rating (GSR) are now routinely used in a number Australian coal mining operations. This allows development of 3D g

    Nov 30, 2018

  • AUSIMM
    Telfer Project Process Plant Design

    By R Dunne, G Lane, S Ha, D Dreisinger

    The paper outlines the 17 Mt/a Telfer Project plant process design from sample selection to feasibility study design. The 366 Mt Telfer mine reserve consists of a diverse range of copper and gold mine

    Jan 1, 2003

  • AUSIMM
    Field Measurement of Transient Pore Pressures within Co-disposed Processing Rejects Placed in a Spoil Dump

    By R Van Laeren, G Langerak, S Fityus, K Koosmen

    Co-disposal of partly-dewatered mixed-plant rejects (MPR) from coal processing into spoil dumps is gaining favour amongst Australian coalmine operators in preference to conventional tailings disposal

    Jul 27, 2015

  • AUSIMM
    Vivien Mine modelling back analysis to forecast ground conditions and ground support

    By J Player, P Mikula, G Sweby

    A numerical modelling back-analysis exercise was carried out at a WA gold mine at which early signs of seismicity (rock noise, scatts from active faces) were becoming apparent as depth of mining incre

    Nov 29, 2022

  • AUSIMM
    Commissioning ù The Interface Between Construction and Operations

    This paper outlines the role of commissioning in the project cycle, shows how to get organised for commissioning and describes the principal commissioning activities. Emphasis is placed on appointing

    Jan 1, 2005

  • AUSIMM
    Mine Wastes as Cover Materials in a Water-shedding Soil Cover in North-West Queensland

    By T Baumgartl, C Gonzales, A Soliman, M Edraki

    A soil cover isolates potentially acid-forming (PAF) mine wastes from atmospheric interaction and thereby mitigates acid mine drainage. As a cover that comprises either a single layer or a composite b

    Jul 16, 2014

  • AUSIMM
    Extension of the Rosebery Mine by Decline Access Below 17 Level

    Access to the Rosebery Orebody, which dips into the western slopes of Mount Black at 45¦, has been achieved in sequence by the following means: - A series of adits down to 8 level - An inclined shaf

    Jan 1, 1982

  • AUSIMM
    The Geology Of The fitzpatrick Area North Broken Hill Limited, Broken Hill, NSW

    In August, 1975, North Broken Hill Limited announced that an intersection of 37.3 m of high grade lead-silver-zinc mineralisation, assaying 26.2 per cent Pb, 495 g/tonne Ag and 21.2 per cent Zn ha

    Jan 1, 1983

  • AUSIMM
    Cooling Pathways for Deep Australian Longwall Coal Mines of the Future

    By B Belle, M Biffi

    Cooling of coal mines in the Bowen Basin, characterised by steep geothermal gradient, is presently achieved mostly through rental surface bulk air cooling in summer months. This paper argues that futu

    Jul 1, 2013

  • AUSIMM
    Status Quo and Future Evaluations of Global Rare Earth Mining (with Respect to Special Rare Earth Element-industry Criteria)

    By H Mischo, G Barakos, J Gutzmer

    The continuously growing demand for rare earth elements (REEs), in combination with the crisis of 2009 and the price spike of 2011, has initiated a treasure hunt for rare earth deposits all over the w

    Nov 4, 2015

  • AUSIMM
    Holistic Management of Sulfides at Rio Tinto Iron Ore's Pilbara Mine Sites

    Rio Tinto Iron Ore (RTIO) manages eleven mines in the Pilbara region, Western Australia. Three of these mines have previously or are currently mining black shale that contains varying amounts of pyrit

    Jan 1, 2009

  • AUSIMM
    Educating Future Mine Managers - Maintaining the Gene Pool

    By J Galvin

    This paper addresses the actions of the Australian mining industry, its regulators and educational providers towards ensuring that a pool of competent mine managers is maintained in Australia and that

    Jan 1, 2006

  • AUSIMM
    Towards integration of pyro- and hydrometallurgical unit operations for efficient recovery of battery metals from waste lithium-ion batteries

    By J Zhang, L Klemettinen, A Jokilaakso, J Biswas, J Partinen, H O’Brien, A Klemettinen

    Waste lithium-ion batteries (LIBs) are important secondary sources of many valuable materials, including Critical Raw Materials (CRMs) defined by the European Union (EU): lithium, cobalt, manganese, a

    Jun 19, 2024

  • AUSIMM
    Geology and Discovery of the Que River and Hellyer Polymetallic Sulphide Ore Bodies Tasmania

    The Que River and Hellyer polymetallic massive sulphide ore bodies are located 3 kilometres apart in the Cambrian Mount Read volcanics of Western Tasmania. Both deposits are classic examples of the

    Jan 1, 1988

  • AUSIMM
    Production of Submicron Particles by Autogenous Grinding with a Stirred Mill

    By Sano S, Ishikawa T, Nagaoka H, Hayashi Y, Hasegawa M

    The stirred mill is regarded as one of the most efficient devices for micronising materials and has come to be actively used for preparation of fine particles. Recently, the demand for ultrafine par

    Jan 1, 1993

  • AUSIMM
    Pyrite depression at Boliden Tara using F-250 – a biopolymer

    By Y Peng, C Burns, Y Mu, R A. Lauten

    In both laboratory flotation experiments and from analysing the composition of the lead concentrate at the Boliden Tara lead-zinc mine in Ireland, it has been found that F-250 may replace cyanide as a

    Aug 29, 2018

  • AUSIMM
    Using Dynamic Simulation Throughout a Process Plant's Life Cycle

    Using Dynamic Simulation Throughout a Process Plant's Life Cycle

    Sep 13, 2010

  • AUSIMM
    Petrochemical Variations of Island Arc's Andesites (Kurile Island Arc)

    The problem of comparison of island arc's andesites in terms of petrochemical data is exa- mined. It is definitely established that only two main factors exist controlling the petroche- mical v

    Jan 1, 1987

  • AUSIMM
    Screen Media Aperture Size Measurement Using MetsoÆs Screen Tracker

    By G van Niekerk, M Wortley

    Screening is a critical part of many mineral processing circuits and keeping the aperture of the screening media within specification is vital to ensure efficient performance of the processing plant.

    Sep 26, 2011