Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Casposo Gold-Silver Project – Process Selection and DesignBy D Connelly
Silver and gold bearing ore from the Troy Resources NL Casposo Gold-Silver Project, located within the San Juan Province of Argentina contains a complex mix of gold, silver, electrum and silver sulphi
Aug 8, 2011
-
Quantitative X-Ray Mineralogy of Iron Ore and ScalesBy K Knorr
Desktop X-ray powder diffraction using a D2 PHASER equipped with fast linear detector was performed on several iron ore and mill scale samples. Data were analysed using cluster analysis and Rietveld q
Jul 11, 2011
-
Phase I Results From Ground and Hyperspectral Remote Sensing Analysis of Natural and Anthropogenic Acidic DrainageBy D B, M A. Sares, D W. Coulter, D C. Peters
This presentation discusses NASA-funded research on the ability of hyperspectral remote sensing to map diagnostic acid rock drainage (ARD) mineralogy that adversely affects water quality within waters
Jan 1, 2003
-
Managing Uncertainty on the Cut 8 ProjectBy G M. Jones, J Rademan
Debswana, owned by the Government of the Republic of Botswana (GRB) and De Beers in a 50:50 joint venture partnership, operates the Jwaneng diamond mine in Botswana - the most valuable diamond mine in
May 24, 2012
-
Isasmelt and IsaMills ù Models of Successful R&DMIM Holdings Limited has acquired a reputation for the successful application of R&D to develop break-through technologies for the mining industry. The Isa Process tank-house technology has been licen
Jan 1, 2002
-
Maximising the value of a drilling program – case study in a challenging environmentBy A A. Latscha, D O’Connor
Increasing orebody complexity, restrictions in ground access, and longer lead times for disturbance approvals, have generated the need for the Resource Development Team within Rio Tinto Iron Ore (RTIO
May 24, 2023
-
Coal in the Context of Sustainable Development ù Implications for the Minerals IndustryThe concept of æsustainabilityÆ can largely be defined as development that will not compromise the ælivabilityÆ of the planet for future generations. It has multiple dimensions, such as the triple bot
Jan 1, 2004
-
Mine Hoists for the Nickel Rim South ProjectBy T Gartner
This paper describes the design, manufacture and site services associated with the supply of mine hoists for the new mine under construction by Falconbridge Limited in Ontario, Canada. Two new shafts
Jan 1, 2005
-
No. 3 Shaft Winders and Winder HouseThe sinking of the new No. 3 Shaft being mainly concerned with providing for the continuation of mining operations north of the existing workings, requirements for the shaft and haulage equipment were
Jan 1, 1957
-
Managements' Changing Emphasis on Health and Safety in the 1990sThe 1990s present many challenges, not the least of which is in the area of health and safety. Integrating of safety and health into the management process to suit the overall needs of a company will
Jan 1, 1993
-
Thermal Modelling and Mitigation Measures for the Bogong Power DevelopmentBy D Wimpenny
The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe
Mar 8, 2011
-
Impact of Stope Geometry on Backfill Systems for Bulk MiningBy A Grice
AMC has completed a number of backfill options studies, including several in recent years for large, three-dimensional orebodies involving total extraction by longhole open stoping with backfill. This
Jan 1, 2000
-
Concentrating Practice of the Broken Hill South Limited, Broken Hill, New South Wales, AustraliaBy Read T. A
THE Broken Hill South Ltd. is one of ten companies operating on the Broken Hill lode (See Fig. 1). It has two leases-Blocks 7 and 8-of a total length of 2250 ft. on strike of lode.From the surface to
Jan 1, 1921
-
The Approvals Process Through to Mining Lease Grant for a Small-Medium Sized Mining Development: The Mt Sinvit Gold Projects, East New Britain ProvinceThe Mt Sinivit gold project is located approximately 50km SSW of Rabaul in the Baining Mountains of the Gazelle Peninsula, East New Britain Province. The deposits were discovered in mid- 1983 and fo
Jan 1, 1997
-
The Discovery of the Wabu Ridge Gold Skarn, Irian Jaya, IndonesiaBy L Soebari, W Sunyoto
The Wabu Ridge Gold Skarn deposit is located at elevations of up to 3100 metres above sea level, in the Central Highlands of Irian Jaya, Indonesia, 35 km NNW of the Grasberg porphyry deposit. Wabu is
Jan 1, 1999
-
Effect of Gravity Recovery on Overall Plant Recovery, Sadiola - A Case StudyAn enhanced gravity concentrator was installed in conjunction with an intensive leach reactor at the Sadiola plant in Mali last year and commissioned in December 2007. There has been much debate over
Aug 1, 2010
-
Optimising a Mineral Supply Chain under Uncertainty with Long-term Sales ContractsBy J Zhang, R Dimitrakopoulos
A two-stage stochastic mixed integer non-linear program is formulated for a mining complex to optimise strategic and tactical plans. The objective is to find the near optimal decisions for a mineral s
Nov 24, 2014
-
Cable Tunnel VentilationBy P Ridley
EnergyAustralia’s Sydney Central Business District (CBD) cable tunnel network will form a loop 6.2 km in length. The 3.2 km long, 3.5 m, diameter city east cable tunnel (CECT) currently in design, wil
Mar 8, 2011
-
Scoping of Feasibility StudiesHow often does one hear that a recent feasibility study was not a success? Alternatively, when scope of the feasibility study was sent out to tender there was a large discrepancy in tendered prices. I
Jan 1, 1998
-
Modelling the Impact of Rockmass and Blast Design Variations on Blast FragmentationBy S S. Kanchibotla, I Brunton
Most blast fragmentation models assume the rock mass properties, explosive properties and blast design variables to be constants and uniformly distributed within a blast. However, in reality all these
Jan 1, 2001