Search Documents

  • AIME
    Institute of Metals Division - Ceramic-Metal Composites by Reactive Hot Pressing (TN)

    By M. N. Shetty, A. C. D. Chaklader

    RECENTLY, it has been demonstrated that a considerable densification and interparticle bonding can be achieved if a pressure is applied to a powder compact while the material of the compact is undergo

    Jan 1, 1965

  • SAIMM
    Improvement of the Cobalt Process at the Chemicals of Africa (Chemaf) Usoke Plant – Effect of Seed Recycle

    By Jo Katembo, Patty Bwando, Patient K. Ilunga, Yves Kalubi, Emman Mulaj

    "From 2010, the dolomite concentration in the ore fed to the Usoke Plant increased, resulting in a significant increase in the gangue acid consumption and Mg build-up in the circuit, and thus an incre

    Jan 1, 2015

  • SAIMM
    Evaluation of roof rating systems being used in South Africa

    By T. Dlokweni

    Several Rockmass classification systems have been developed and used in Civil Engineering design and for underground mining operations. Some of these rockmass classification systems have been modified

    Jan 1, 2003

  • AUSIMM
    Continuous Vacuum Dezincing Plant at B.H.A.S. Pty Ltd., Port Pirie

    By Williams K. C

    This paper presents a brief account of the plant which has been developed at Port Pirie to recover, by vacuum distillation, the greater part of the zinc content of desilverized lead. The present plant

    Jan 1, 1956

  • SME
    Mathematics Of Mine Sampling III Whither Geostatistics?

    By Robert F. Shurtz

    This paper suggests that pre-occupation with the random process model notised by geostatisticians may result in neglect of more promising techniques, especially since the random process model does not

    Jan 1, 1980

  • SME
    Impact of China on drilling grade barite

    By W. J. Miles

    At the beginning of the 20th century, barite was a mineral of minor importance in the United States. Its primary use was to extend lead oxide in white paint. Barite also added the special qualities of

    Jan 1, 2009

  • IOM3
    Mine gas exploitation at Appin and Tower Collieries, New South Wales, Australia

    By K. C. Garner

    The visit reported was made with support from the 1997 J.C. Boyle travelling scholarship. The management and control of hazardous gases released into the underground environment are an integral part o

    Jun 21, 1905

  • CIM
    Mechanical Integrity versus Process Safety Management Requirements

    By Hugo Julien

    According to OSHA 29 CFR Part 1910.119 (Process safety management of highly hazardous chemicals), Canadian Provincial Safety Standard Acts or Federal laws, the owner of stationary equipment (Boilers,

    Jan 1, 2014

  • AUSIMM
    Proper Tyre Management Reduces Tyre Costs (8cc3f990-94b6-4b55-8abb-8c65d8f8d45b)

    By Gordon DM

    Tyres account for 25-30 per cent of the operating costs of large capacity haul units as used in open-cut mines.Tyre operating costs can be substantially reduced and often contained in real terms by ap

    Jan 1, 1983

  • CIM
    Rabbit Lake project – environmental impact

    By R. L. J. Phillips

    "The environmental impact of the Rabbit Lake project is presented. Baseline data for fish, water, air and radon collected in 1973, 1975, 1980and 1986, are compared with post-development environmental

    Jan 1, 1989

  • SME
    Flotation Froth Image Segmentation Based on Highlight Correction and Parameter Adaptation Mining, Metallurgy and Exploration (ff8d32fd-da4e-43f4-8da2-8beb808a22d7)

    By Wen Tao Liu, Tong Tian, Fu Sheng Niu, Xiu Man Liang

    In order to address the difficulty of accurate segmentation of froth images of different sizes, a method of froth image segmentation based on highlight correction and parameter adaptation is proposed.

  • IOM3
    Reducing the iron content of kaolin from Milos, Greece, by a hydrometallurgical process

    By S. G. Tsimas, A. K. Moutsatsou, G. K. Parissakis, M. A. Komiotou

    For Greek kaolin producers, a considerable proportion of whose output is from deposits containing more than 4 wt% Fe2O3, the colouring resulting from iron oxide impurity represents a serious problem t

    Aug 1, 1995

  • CIM
    Semi-Autogenous Grinding Circuit Reduces Capital Costs

    By H. C. Counsell, R. Webber

    "The mill at Denison Mines' Elliot Lake Operations started up in 1957, with a capacity of 6,000 tons per day. Over the years various plant modifications expanded th.is to 7 500 tons per day. In 1976,

    Jan 1, 1984

  • NIOSH
    IC 7213 Dredging Pennsylvania Anthracite ? Foreword

    By Joseph A. Corgan

    The river- or dredge-coal industry of Pennsylvania is conducted on many of the rivers and creeks that drain the Pennsylvania anthracite fields. Coal thus recovered found its way into the streams as co

    Jan 1, 1942

  • CIM
    Study on Recovery Process for Ruthenium from Scraps by Hydrometallurgical Methods

    By Y. Nakamura, T. H. Okabe, S. A. Sunkar, K. Nose

    Ruthenium (Ru) is known as a platinum group element with a very small production volume. In fact, the worldwide annual production of primary Ru metal is only about 20-30 tons, and it depends on the am

    Jan 1, 2014

  • AUSIMM
    The Cable Belt Conveyor and its Application

    The fundamental features of the Cable Belt Conveyor are described. It consists of independent wire ropes which take the transmission load, and a special reinforced rubber belt which acts 'only as

    Jan 1, 1957

  • AUSIMM
    The Effect of Particle Size on the Activation and Flotation of Sphalerite

    By Kelsall D. F, Trahar W. J

    The size by size batch flotation behaviour of copper activated sphalerite from synthetic mixtures with quartz was determined. In terms of recovery of sphalerite, the size fractions could be grouped in

    Jan 1, 1975

  • AIME
    Coal - Basic Study of Internal Vertical Stress Distribution in Confined Bulk Solids

    By W. J. Verner, J. R. Lucas

    Billions of tons of bulk solid materials are processed through our industrial plants each year, and the tonnage is steadily rising. It has been estimated that for every dollar spent in industry as a w

    Jan 1, 1961

  • CIM
    The Recovery of Rare Earths, Uranium and Pyrite from Pele Mountain’s Proposed Eco Ridge Mine Project

    By Roger Payne, John R. Goode, Feng Gao, James Brown

    The Eco Ridge deposit is located in the Elliot Lake mining camp in Northern Ontario, Canada. Between 1955 and 1996, the area produced more than 138,000 t (300 million pounds) of U3O8 and very signific

    Jan 1, 2014

  • AUSIMM
    The Role of the Metallurgist in Project Development

    The role of a project metallurgist is diverse and covers input into the resource definition, mining studies, metallurgical test program development, process engineering and plant design, cost estimate

    Jan 1, 2008