Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The In-Situ Pillar Strength and Overburden Stability in U.S. Mines

    By Hamid Maleki

    Prudent design of coal pillars in any mining system requires an estimation of in-situ pillar strength, overburden lateral load transfer capability, and a failure criterion. Pillar strength is typicall

    Jan 1, 2008

  • SME-ICGCM
    Ultra-Thick High-Production And High-Efficiency Longwall Mining Technique With Retreat Mining Along The Seam Dip Direction And Under Complicated Geological Conditions (6f1eec60-4383-4b46-a3c6-b20670410c29)

    By Ke Yang

    In Chinese coal mines, extraction of deep, highly gassy soft coal seams sandwiched between soft floor and soft roof in complicated geology is commonly encountered. How to safely and efficiently excava

    Jan 1, 2009

  • SME-ICGCM
    A Sonic Wave Attenuation Technique For Monitoring Of Stress Levels

    By Po-Ming Lin

    Stress has a significant effect on the stability of pillars. In order to get an accurate picture of pillar stability, one needs information not only on the primary Stress distribution but also on all

    Jan 1, 1984

  • SME-ICGCM
    Application Of Physical And Mathematical Modelling In Underground Excavations

    The scope of this paper is to introduce a mathematical model based on matrix algebra in order to determine similitude quantities, which can be arranged in specific formats to simulate the field condit

    Jan 1, 1989

  • SME-ICGCM
    Optimised Layout And Roadway Support Planning With Integrated Intelligent Software

    By S. Kouniali

    Experience with knowledge-based systems for Layout planning and roadway support dimensioning is on hand in European coal mining since 1985. The systems SOUT (support choice and dimensioning, 1989), SO

    Jan 1, 1996

  • SME-ICGCM
    Mine Layout Deign for Coal Bump Control

    By Hamid Maleki

    A comprehensive study consisting of stress determinations, core logging, laboratory testing, and numerical analyses was conducted to investigate the cause and potential alternatives to the coal bump c

    Jan 1, 1987

  • SME-ICGCM
    The Use Of Foamed Cement Cribs At American Electric Power Fuel Supply Meigs Division

    By Michael Amick

    Due to the importance of maintaining open airways on a longwall panel, mine management decided to install cribs made of foamed cement. Foamed cement had been used at other company operations on severa

    Jan 1, 1993

  • SME-ICGCM
    Direct determination of failure surfaces in earth slopes

    By S. L. Huang

    The location and shape of potential failure surfaces in soil slopes were directly determined based on the stresses induced in the soil mass and the strength of the soil itself. Stress calculations wer

    Jan 1, 1989

  • SME-ICGCM
    CISPM - A subsidence prediction model

    By Y. Luo

    A PC based computer model has been developed by the authors for predicting the surface subsidence due to underground coal mining. Its reliability, comprehensiveness and user friendliness demonstrate t

    Jan 1, 1989

  • SME-ICGCM
    Support selection of mine roadways by means of a computer program

    By Erdal Ünal

    The computer program introduced in this paper is based on design guidelines developed for selection of support systems used in mine roadways. The support types considered include rock bolts as well as

    Jan 1, 1989

  • SME-ICGCM
    An analysis of roof-pillar-weak floor interaction in partial extraction room-and-pillar mining

    By W. M. Pytel

    The applicability of the beam theory in analysis of roof- pillar-weak floor interaction in partial extraction room-and-pillar mining is presented. The mine structure is modeled as an equivalent multi-

    Jan 1, 1989

  • SME-ICGCM
    DEPOWS - A Powered Support Selection Model

    By Y. M. Jiang

    A users friendly PC Computer Program has been developed to implement a systematic design of the powered support. The required input data are: (1) thickness, RQD, and compressive strength of the immedi

    Jan 1, 1989

  • SME-ICGCM
    A Study Of Displacement Field Of Main Roof In Longwall Mining And Its Application

    By Deren Zhu

    Based on the results of in-situ observations and physical model analysis, a computer simulation method, FEAEBP, has been developed to predict the behaviors of main roof breakage in longwall mining by

    Jan 1, 1989

  • SME-ICGCM
    Cavability Investigation Of A Stratabound Copper Deposit, Tong Kuang Yu Mine, Shanxi Province, China

    By W. C. Lacy

    Stratabound copper ore bodies in thick Proterozoic metamorphosed sedimentary and volcanic rocks at the Tong Kuang Yu Mine in southern Shanxi Province of China were considered as possibly being amenabl

    Jan 1, 1989

  • SME-ICGCM
    The Effect of Immediate Strata on Pillar Behavior in Retreat Pillaring-- A Case Study

    By A. W. Khair

    This paper deals with the analysis of pillar failure in a room and pillar mining operation of a deep underground coal mine. The incident here involved the failure of more than 100 pillars. The mechan

    Jan 1, 1986

  • SME-ICGCM
    Design Methods To Control Violent Pillar Failures In Room-And-Pillar Mines (V. S. Bureau of Mines)

    By R. Karl Zipf

    The sudden, violent collapse of large areas of room-and-pillar mines poses a special hazard to miners and mine operators. This type of failure, termed a "Cascading Pillar Failure" (CPF), occurs when o

    Jan 1, 1996

  • SME-ICGCM
    Birth Of A Longwall-Initial Planning To Post-Subsidence Mitigation

    By E. D. Doney

    The Kerr-McGee Coal Corporation's Galatia Mine's first longwall mining system was implemented on May 3; 1989. Start-up of the longwall face represnted the successful conclusion of an effort

    Jan 1, 1990

  • SME-ICGCM
    Roof Control Analysis In North River Mine

    By Mike Watts

    Since the first longwall panel development started in the new mining, (Southern) area, a number of roof falls have occurred in L1 and L2 gate-entries. The longwall was delayed for a total of two month

    Jan 1, 2000

  • SME-ICGCM
    Realistic Design Of Ground Control Based On Geotechnical Data Obtained During Mine Development

    By Kot F. Unrug

    In the premining stage of engineering design, the only available data are obtained from core drilling. It is often not sufficient for a realistic design of strata control. During the development, an a

    Jan 1, 1994

  • SME-ICGCM
    Direct Laboratory Tensile Testing Of Select Yielding Rock Bolt Systems

    By John D. VandeKraats

    Yielding rock bolt support systems have been developed to accommodate ground movement in shifting ground such as in coal operations; in creeping ground such as salt, trona, and potash; and in swelling

    Jan 1, 1996