Search Documents

  • SAIMM
    The Huntsman Approach to Flotation Frothers

    By Nobuzwe Makhotla, Sasha Boskovic, Steve Hearn

    "Mineral separation efficiency in flotation depends, to an extent, on the type of frother used. Huntsman develops and manufactures unique frothers which are suited for mineral processing applications.

    Jan 1, 2015

  • SME
    Selection, Design, And Procurement Of North America?s Largest Mixshield TBM For Portland, Oregon?s East Side Cso Tunnel

    By Christof Metzger

    This paper discusses the process utilized by the Kiewit?Bilfiger Berger Joint Venture (Contractor) to select, design, and procure the largest mixshield tunnel boring machine (TBM) ever implemented in

  • AUSIMM
    Contributions from Improved Surface Mine Haulage Road Design, Operation and Management Techniques to Sustainable Development

    Operating well designed and maintained surface mine haul roads is the key to minimising truck haulage costs - in itself a significant component of the total cost per tonne mined. Existing and proposed

    Jun 1, 2010

  • NIOSH
    Roof Bolt Response To Shear Stress: Laboratory Analysis

    By Steve Signer, Ed Mchugh

    Recent studies by researchers from the National Institute for Occupational Safety and Health indicate that shear loading contributes significantly to failure of bolts used for rock reinforcement in co

  • SME
    Increasing Coarse Particle Recovery Using The Flsmidth Selective Froth Recovery System

    The recovery of coarse particles has been widely recognized as being limited by the froth in mineral flotation. In response to this, FLSmidth has developed the Selective Froth Recovery (SFR) System.

    Feb 27, 2013

  • AUSIMM
    Economics of Mine Planning and Equipment Selection

    This paper examines some of the fundamental economics of mining - in particular, for optimisation studies, for production rate determination and for reserve estimates.It includes introductory discussi

    Dec 6, 2010

  • SME-ICGCM
    Roof Pressure Monitoring Using The Integrated Longwalt Automation System By WESTFALIA

    By Ulrich Paschedag

    The WESTFALIA group of companies developer and manufactures underground mining machinery for complete high-performance longwalls. WESTFALIA uses a state of the art electrohydraulic system as the most

    Jan 1, 1994

  • SME
    NAT 2008 Full Proceedings - NAT2008

    By Bradford F. Townsend, Marc R. Kritzer, Michael F. Roach, Dennis Ofiara

    All Rights Reserved. Printed in the United States of America. Information contained in this work has been obtained by SME, Inc. from sources believed to be reliable. However, neither SME nor its autho

    Dec 1, 2008

  • DFI
    Pile Load Testing At JFK International Airport - Synopsis

    By J. Moskowitz

    Construction of the new JFK International Airport Light Rail System (LRS) began in 1998 with a pre-construction load test program. This $1.2 billion design-build project consists of approximately 13 k

    Jan 1, 2000

  • AIME
    Mining - Ground Movement and Subsidence from Block Caving at Miami Mine

    By J. B. Fletcher

    The Miami mine first started operations in 1910. For convenience, the history of the orebody can be divided into the following categories (Fig. 1): 1) 1910 to 1925: 24.4 million tons of high grade

    Jan 1, 1961

  • SAIMM
    Arc-Electrode Interactions In Silicon And Ferrosilicon Furnaces

    By J. Bakken, M. Th. Jonsson, G. Sævarsdottir

    A typical three-phase submerged-arc furnace for production of silicon metal and ferrosilicon has arc currents ~100 kA, phase voltages ~100 V and total furnace power ~10 - 60 MW. The arcs burn in gas f

    Jan 1, 2004

  • IOM3
    Project financing and the mineral development agreement

    By D Macdougall, J Otto

    The financing of large mining projects in developing countries is often achieved, at least in part, by limited-recourse financing methods. Financing agreements are affected by the basic accord that is

    Aug 1, 1994

  • AIME
    Coal Steps Forward Again

    By Ernest M. Spokes

    For bituminous and lignite coals the economic picture continued to improve as it has each year since the low of 1961, with production at 480 mil- lion tons in 1964 compared with 1963's 459 millio

    Jan 2, 1965

  • SAIMM
    Uncertainty Assessment For The Evaluation Of Net Present Value: A Mining Industry Perspective ? Synopsis (443bbb20-5eab-43f3-85de-c6c40fb656b6)

    By Ö. Erdem

    The investment decision making process in the insurance and finance industries is affected by new advances such as simulation techniques. These advances have improved the discounted cash flow method (

    Jan 1, 2012

  • NIOSH
    OFR-113C-93 Coal Mine Injury Analysis: A Model For Reduction Through Training - Volume IV: Analytical Techniques For Mine Safety Management

    By R. V. Ramani

    One area of study in the Coal Mine Injury Analysis project was to illustrate and enhance the ability of mine safety management personnel to apply analytical techniques to injury experience data and to

    Jan 1, 1993

  • SME
    Palygorskite (Attapulgite) In Central China - Preprint 09-035

    By H. H. Murray

    The largest reserves of palygorskite in the world are located in Anhui and Jiangsu Provinces in East Central China. The deposits are Middle Miocene in age and range from 3 to 6 m in thickness. The d

    Jan 1, 2009

  • AUSIMM
    The Application of Solvent Extraction to the Recovery of Uranium from El Sherana Ore

    Solvent extraction has recently been introduced into Australian hydrometallurgical practice for the production of a high grade uranium concentrate from El Sherana ore by a sulphuric acid leach and sol

    Jan 1, 1961

  • AUSIMM
    Resource Estimation Practice, Macraes Gold Project

    By M Stewart

    In January 1994, Macraes Mining Company started a new phase of exploration to find additional resources along strike and down dip of identified resources for a mill that was being expanded from 2.1 Mt

    Jan 1, 1997

  • NIOSH
    OFR-9(2)-72 Coal Mine Rescue And Survival System - Volume II - Communications/Location Subsystem

    The design, specification, and performance evaluation of the Communications and Location portions of a Coal Mine Rescue and Survival System are described. The work was performed as part of a nine mont

    Jan 1, 1971

  • DFI
    Design and Construction of the Thames Water Lee Tunnel Shafts, London

    By Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley

    "AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor

    Jan 1, 2014