Search Documents

  • IIMP
    Medición de los proyectos de responsabilidad social

    By Cesar Sáenz Acosta

    El presente texto señala las mediciones de impactos que se han realizado a los programas de responsabilidad social de una empresa minera. Esta medición se realizó a través del cálculo del indicador “R

    Sep 12, 2011

  • AIME
    Mine Models

    By H. H. Stoek

    MINE models have three distinct uses: 1. As exhibits in expositions and museums. 2. As exhibits in law suits. 3. As illustrations in teaching mining engineering. All three uses are in a sense educ

    Jan 4, 1917

  • AUSIMM
    Triboelectric Charge and Separation Characteristics of Industrial Minerals

    Triboelectric Charge and Separation Characteristics of Industrial Minerals The basic principles of triboelectric charge and separation of minerals and the factors affecting the entity of the charges

    Sep 13, 2010

  • SME
    New Crystal Springs Bypass (Polhemus) Tunnel—Design Challenges

    By Roy C. Fedotoff, Jon Hurt, Gregg Sherry, Gilbert Tang

    The 1,380 m (4,200 ft) long New Crystal Springs Bypass (Polhemus)Tunnel (NCSBT) will replace the existing Crystal Springs Bypass Pipeline. This tunnel project is part of the SFPUC’s $4.3 billion capit

    Jan 1, 2007

  • SAIMM
    Rapid Sensors For Ferroalloy Production And Processing

    By A. McLean, M. Iwase, K. Wakimoto, K. Katogi

    For many decades control strategies have been based upon samples taken from liquid steel, molten slag and gas phase as well as from solid products. Because of recent developments in the areas of dynam

    Jan 1, 2004

  • AUSIMM
    Hot Dip Tinning Operations at Port Kembla

    A commonplace, sometimes overlooked or taken for granted, article of everyday existence is the tin can. Produced from thin gauge low carbon steel, and commonly coated with a mere 60 millionths of an i

    Jan 1, 1958

  • SME
    A Field Study Of US Longwall Coal Mine Ventilation And Bleeder Performance

    By S. J. Schatzel

    Longwall coal mine operators in the US are required to ventilate multi-panel longwall districts but may have little or no knowledge about what happens to the ventilation air between the inlet evaluati

    Jan 1, 2011

  • CIM
    Operating Practices at Peñoles Concentrators – Mexico

    By Rodolfo Espinosa

    "Industrias Peñoles, S.A. de C.V. in Mexico, has nine mining operations, six managed by Peñoles (base metal mines) and three managed by Fresnillo plc (precious metal mines). Seven of the operations us

    Jan 1, 2011

  • AUSIMM
    Some Effects of Wood, Cement, and Aluminium Sulphate on Flotation of Broken Hill Lead-Zinc Ore

    Results of flotation tests on lead-zinc ore from Broken Hill, N.S.W., confirmed that flotation at pH 9 in the presence of cement gave poorer metallurgical results than flotation at pH 7. Additions of

    Jan 1, 1974

  • ISEE
    Sappington Bridge: An Opportunity for Strengthening Research and Demolition Training

    By J. Baird

    The Sappington Bridge, a steel arch span bridge constructed in 1904 over the Meramec River, was demolished due to its advanced state of deterioration. The demolition was a project to benefit Crawford

    Jan 1, 2003

  • DFI
    The Alternate Technical Concept Process For Foundations At The New Mississippi River Bridge, St. Louis

    By Dan A. Brown

    The New Mississippi River Bridge (MRB) employed conventional design-bid-build procurement, but the bidding process included the opportunity for pre-qualified bidders to develop and propose confidentia

    Jan 1, 2011

  • AUSIMM
    Determination of Flotation Kinetics of Coal Grain Types in a Pilot Scale Jameson Cell using Coal Grain Analysis Method

    Determination of Flotation Kinetics of Coal Grain Types in a Pilot Scale Jameson Cell using Coal Grain Analysis Method

    Sep 13, 2010

  • SME
    Financial Evaluation and Risk Assessment of a Placer Gold Deposit during the First Stages of Exploration: A Case Study

    By D. Drymonitis, G. Gialoglou

    "Placer gold mineralizations have been observed in the north-eastern parts of Greece. Some of them have been at first evaluated to be of special interest so, exploration campaigns have been designed a

    Jan 1, 2005

  • IIMP
    Aplicación del sistema SAP en minería subterránea

    By Efrén Peña Pino

    El presente texto señala la aplicación del sistema SAP en la minería subterránea de Minsur. Este sistema operativo maneja las propiedades y procesos de la Sociedad Minsur, el cual cuenta con tres Cent

    Jul 31, 2003

  • SME
    New York Subway Caverns and Crossovers—A Tale of Trials and Tribulations

    By Charles Stone, Madan Naik, Drupad Desai, Karel Rossler

    Planning of New York’s new subway line dictated the location of shallow underground station caverns and track crossovers. Clear span openings ranging from70 feet to 100 feet and lengths in excess of 1

    Jan 1, 2005

  • ISEE
    Expansion of the Panama Canal

    By Tom Treleaven

    The widening of the Panama Canal to approximately 130 feet (40 m) for its entire length began just a few years ago. The original expansion program was slated for completion in 18 to 20 years, but has

    Jan 1, 1997

  • SAIMM
    Environmental Considerations In The Preparation Of Bankable Feasibility Documents - Introduction

    By A. A. Smithen

    There is an increasing awareness of the importance of including an assessment of environmental liabilities in the preparation of bankable feasibility documents. This means that environmental assessmen

    Jan 1, 1999

  • SME
    Extensive Mechanization Produces Record Performance In Drill-Blast Tunnelling

    By Hans Hamrin

    Three drill-blast cycles of 3.1 m advance achieved in one working shift of 7.5 hours at the Holsfjorden Tunnel project in Norway. The tunnel, 5235 m long, with a cross section of 8.6 m2, was completed

    Jan 1, 1987

  • SME
    The 1990’s – Politics and the Environment

    By Georgene Renner

    At the beginning of the 1990s, Communism fell and signaled the end of the Cold War. The world rejoiced but also watched and waited to see how those countries would restructure themselves. The 1990

    Jan 1, 2007

  • NIOSH
    RI 7576 Structural Deformation Of Green River Oil Shale As It Relates To In Situ Retorting

    By P. R. Tisot

    Structural response and/or deformation was determined for each of four different grade Green River oil shales (27.0-, 34.5-, 45.5-, and 63.5-gal/ton) as they were heated in an inert atmosphere, under

    Jan 1, 1971