Search Documents

  • AUSIMM
    A Cathode Headbar for Zinc Electrolysis: Developments at Risdon, 1917-1957

    By Bain J. H

    Since zinc was first deposited at Risdon in February, 1917, provision of the most economical cathode assembly has been a subject of extensive research, the major problems being corrosion and efficient

    Jan 1, 1958

  • SME
    Underground Caving Shield Change Outs At Us Steel’s Oak Grove Mine

    By B. Weyerman

    U. S. Steel's Oak Grove Mine experienced several top hinge failures on their caving shields. It was determined that all the caving shields needed to be replaced with new caving shields before mor

    Jan 1, 2001

  • AUSIMM
    The Preparation and Properties of Cemented Carbides

    Much interesting data on cemented carbides has been published over a period of years which, when classified and pieced together, gives a clear picture of this special branch of powder metallurgy. This

    Jan 1, 1942

  • AUSIMM
    Application of Mine Records to Reduce Project Risk During the Evaluation of Historical Goldfields

    By W B. Edgar, I M. Platten, C A. J Towsey, B W. Cuffley

    The evaluation of historical goldfields has been common over the past 15 years, reflecting changing economic conditions, improvements in knowledge and technology and lack of greenfield sites. Many gol

    Jan 1, 2009

  • AUSIMM
    Kudremukh Experience With Roller Press - A Saga

    Kudremukh Iron Ore Company Ltd, a wholly owned Government of India Enterprise, was established in the year 1976 to develop mine and plant facilities to produce 7.5 Mtpa of high-grade iron ore conce

    Jan 1, 1999

  • DFI
    Deep Foundation Solutions And Implementation For Pittsburgh International Airport Midfield Terminal ? 1.0 Introduction

    By Peter Florian

    At 5:50 am on October 1, 1992, the new $800 million Pittsburgh International Airport Midfield Terminal opened its gates to the world after five years of construction and more than 24 years of planning

    Jan 1, 1993

  • DFI
    Modification of Best-Fit Interpretation Method for Ultimate Capacity of Screw Pile

    By Adnan A. Malik, Tadashi Maejima, Jiro Kuwano

    "ABSTRACTTheoretical approach to estimate the ultimate pile capacity gives a rough idea at the initial stage of design that later on strengthen by the execution of static pile load test at site. The s

    Jan 1, 2014

  • SAIMM
    Production Of Titanium Metal Powder By The HDH Process - Synopsis

    By X. Goso

    Laboratory-scale tests were conducted at Mintek for the production of titanium powder from particulate Kroll sponge by the hydrogenation-dehydrogenation (HDH) process. The aim of this work was to prod

    Jan 1, 2011

  • SME-ICGCM
    Effect Of Water On Stability Of Mine Roadways

    The basic objectives of mine roadways are to provide sufficient cross sections in order to meet the needs of accommodation of equipment, transport, personnel travel and ventilation. However, many road

    Jan 1, 1996

  • AUSIMM
    All-Flotation at North Broken Hill Limited

    Author's Note: Since the paper on "All-Flotation at North Broken Hill Limited" was read and discussed, the metallurgical results obtained have conclusively justified the adoption of the

    Jan 1, 1931

  • AUSIMM
    Alteration Associated with Volcanic-Hosted Massive Sulfide Deposits, and its Exploration Significance

    By W Herrmann, R R. Large

    Volcanic-hosted massive sulfide (VHMS) deposits in ancient, submarine volcanic belts of Australia include mound, lens and sheet-style Zn-rich polymetallic deposits, massive and disseminated pyritic Cu

    Jan 1, 2002

  • SAIMM
    Research In Pyrometallurgy At The University Of Pretoria, 1980-2005

    Keywords: Pyrometallurgy, Pretoria University Substantial research in pyrometallurgy at the University of Pretoria started in 1980 with the appointment of Rian Dippenaar to the Iscor Chair, a posi

    Jan 1, 2006

  • NIOSH
    IC 8109 Mining And Furnacing Methods And Costs, Abbott Mine, Cog Minerals Corp., Lake County, Calif. ? Summary And Introduction

    By A. C. Johnson

    This circular is one of a series published by the Bureau of Mines describing mining and beneficiation methods and costs at various mining operations throughout the United States. Inclusion of the

    Jan 1, 1962

  • CIM
    Using Magnetic Liners to Reduce costs and Improve Efficiencies

    By Terry Keough

    Contents for discussion ?Current liner technology ?Innovation of magnetic products ?Development of magnetic wear liners ?Installation and change out method ?Uses and capabilities ?Internal we

    May 1, 2010

  • AUSIMM
    The Use and Abuse of Feasibility Studies

    By N Cusworth

    The development of a resource project inevitably requires the investigation of a vast range of issues across most engineering disciplines û mining, metallurgical, chemical, civil, electrical, mechanic

    Jan 1, 2007

  • AUSIMM
    Determination of the Structure of the Bulli Coal Seam at Appin Colliery, N.S.W., by the Seismic Reflection Method

    The structure of the Bulli coal seam at Appin Colliery was detailed by the seismic reflection method. This unusual application of the seismic method was possible because there is a reflector near the

    Jan 1, 1965

  • CIM
    Research, Innovation & Reality

    By Richard Burt

    "In seeking to supply the ever increasing needs for raw materials, the mining industry has been required to develop lower grade resources in increasingly remote regions of the world. This has resulted

    Jan 1, 1999

  • AUSIMM
    Variation in property parameters of iron ore granulated mix with moisture content

    By C Li, D O’Dea, R Moreno-Atanasio, T Honeyands

    The behaviour of iron ore granules in the feeding process of sintering is significantly influenced by the material properties of the granulated mix. Therefore, the measurement of key material properti

    Jul 24, 2017

  • SME
    Anticipated Behavior Of Silty Sands In Tunneling

    By Ronald E. Heuer, Debra L. Virgens

    INTRODUCTION Behavior of clay soils in response to tunneling is reasonably well understood by reference to the tunnel stability factor NT = Pz/su (Peck, 1969; Heuer, 1974). With this analysis tool,

    Jan 1, 1987

  • AUSIMM
    An Improved Method of Dumping Spoil

    About twelve months ago, owing to the increasing quantity of stone and dirt being drawn frQm the Victorian State Coal Mine due to the large amount of dead work below ground, cutting, faults, etc, and

    Jan 1, 1918