Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
High Altitude Passive Water Treatment System Design And Construction For Leach Pad EffluentBy K. Whiting, R. Huffsmith, R. Olsen, D. Adams
Long-term closure alternative selection for heap leach pad effluent is a daunting task. Passive water treatment, if designed with enough long-term capacity, can minimize long term O&M while meeting w
Jan 1, 2002
-
Analysis Of The Mining Engineering Faculty PipelineBy M. M. Poulton
Universities are not immune from the large number of retirements facing the mining industry. Department heads anticipate that we will need to replace all of the senior mining engineering faculty in t
Jan 1, 2012
-
Ten years of conducting level 1 simulated emergency exercises in Queensland?s underground coal minesThe inquiry into the explosion at the Moura No. 2 Mine in August 1994 recommended -?Emergency procedures should be exercised at each mine on a systematic basis, the minimum requirement being on an ann
Jan 1, 2009
-
Robbins 10M Double Shield Tunnel Boring Machines On Srisailam Left Bank Canal Tunnel Scheme, Alimineti Madhava Reddy Project, Andhra Pradesh, IndiaBy William Brundan
INTRODUCTION The Srisailam Left Bank Canal (SLBC) Tunnel Scheme is part of the Alimineti Madhava Reddy Project in Andhra Pradesh, South India. This scheme has been planned since 1983 and will provide
-
Quartz-Feldspar Separation For The Glass And Ceramics IndustriesBy F. Burat
Large reserves of feldspar ore exist in the Aegean region of Turkey. The main colored impurities in these ores are iron- and titanium-bearing minerals such as anatase, rutile, sphene and ilmenite. In
Jan 1, 2007
-
Observation Methods Using Real-Time Surface Settlement Monitoring On The South Toulon Tunnel ProjectBy B. Caro Vargas
The Toulon Tunnel project is a key component of the highway corridor on the French Riviera between Marseille and Nice and is a fundamental transportation infrastructure for the region. The first desig
Jan 1, 2012
-
Ergonomic Interventions At Vulcan Materials Company (7e1e12a8-2c8d-42fd-aede-72f57e60f631)By J. Torma-Krajewski, C. Hipes
Many mining companies apply ergonomic principles, but it is done either informally and/or reactively. Examples of an informal approach include replacing worn equipment, such as seats, with models tha
Jan 1, 2007
-
Alaska Way visit highlights Megaprojects conference in SeattleWhen defining a ?megaproject,? one need only to look at Seattle, WA?s State Route 99 Alaskan Way Viaduct replacement project. This $3.1-billion project is one of the largest of its kind in the world,
Dec 1, 2013
-
Case Study: Correcting Mechanical And Control Problems On Essroc?s Multi-Drive Station Horizontally Curved Conveyor ? IntroductionBy A. Jennings
[ ] In November 2005, Essroc Cement, part of the Italcementi Group, commissioned a long overland conveyor at their Nazareth plant in Pennsylvania. This conveyor, tagged CV-105, was designed to tran
Jan 1, 2012
-
Piedras Verdes: Mexico?s Newest Copper MineBy P. J. Rua
The Piedras Verdes copper mine is a new run-of-mine (ROM), heap leach, solvent-extraction/electrowinning (SX-EW) operation located 21 km (13 miles) north-northwest of the town of Alamos in the state o
Jan 1, 2008
-
Integration Of Operations And Underground Construction: Sound Transit University LinkBy John Sleavin
As part of the Link Light Rail project in Seattle, WA, work was completed at the Pine Street Stub Tunnel (PSST) in early 2007 for the Central Link project. This tunnel was excavated using cut-and-cove
Jan 1, 2010
-
Gathering And Managing Environmental Quality Data For Mining Projects - Preprint 09-005By D. W. Rich
An environmental management system (EMS) is a key part of a company?s environmental stewardship. Procedures and practices to continually improve environmental performance can provide great benefits in
Jan 1, 2009
-
Copper Industry Continues to Break RecordsBy William R. Yernberg
SME’s Arizona Conference was held at the Doubletree Hotel at Reid Park in Tucson on Dec. 4 and 5, 2005. The annual conference is organized by the Arizona Conference Board of Directors, which represen
Jan 1, 2006
-
Shaft Construction in Toronto Using Slurry WallsBy Vince Luongo
PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located just north of Toronto, Ontario, Canada will see the construction of a tunnel extending a
Jan 1, 2007
-
Trapezoidal Tapered Ring—Key Position Selection in Curved TunnelsBy Shimi Tzobery, John E. Shamma, Samuel Swartz, Gary B. Hemphill
The trapezoidal tapered ring method has made significant progress in recent years for shielded-TBM projects, excavating tunnels with high overburden, strict water tightness criteria, and multiple curv
Jan 1, 2005
-
Predicted versus Actual Obstructions for Two Pipe-Jacked Tunnels of the Henderson CSO, Seattle, WashingtonBy Dennis Molvik, Roberto J. Guardia, Brad Cowles, Rick Andrews, Robert A. Robinson
A 220-meter (m) segment of the Henderson/ ML King Combined Sewer Overflow(CSO) consists of two 1.8-meter-inside diameter (I.D.) pipe-jacked tunnels that pass beneath Interstate-5 and the BNSF and UPRR
Jan 1, 2005
-
Means and Methods for Tunneling Through Highly Squeezing Ground: A Case History of the Strenger Tunnel, AustriaBy Günter Huber, Bruno Mattle, Helmut Westermayr, Daniel Spöndlin, Max John, Nejad Ayaydin
PROJECT DESCRIPTION Alignment The Strenger Tunnel forms part of the S16 four-lane expressway between Landeckand Bludenz. The construction of this important East-West connection started in 1973
Jan 1, 2005
-
Algorithms for Parametrizing Reserves under Different Geometrical Constraints - IntroductionThe technical parametrization of reserves is a technique which has made an important contribution to the definition and the calculation of optimal mining projects. Its applications to a new open-pit o
Jan 1, 1982
-
Loosening And Face Stability With Shallow Overburden In The ?Sitina Tunnel,? Bratislava, SlovakiaBy Chikaosa Tanimoto
INTRODUCTION Bratislava is located at the intersection of important traffic routes, including motor-ways, roads, railways, air traffic, trading, and inland waterway with an important harbour. The con
-
Gold Mineralization In The Coffee Creek Area; White Gold District (Dawson Range), West-Central Yukon ? IntroductionBy A. J. Wainwright
The Coffee Creek lode gold discoveries are located in the White Gold district (Dawson Range), west-central Yukon, 130 km south of Dawson City and 30 km south of the Golden Saddle gold deposit (Figure
Jan 1, 2012