Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Using Geometallurgical Models To Aid In Metallurgical Testwork For Pre-Feasibility Projects, La Colosa, ColombiaThe La Colosa, Colombia porphyry gold deposit is currently in the pre-feasibility stage. This large deposit has many types of gold mineralization: native gold, electrum, and tellurides. These variatio
Feb 27, 2013
-
Experimental research on the behavior of ventilation air around shafts during a fireThe safety of personnel is the most important matter during a mine fire. However, there is not enough research on a case when a fire occurs near a shaft and the behavior of the fire gas is not well un
Jan 1, 2009
-
Mill Drives In The Third MillenniumBy G. A. Grandy, P. F. Thomas, C. D. Danecki
When considering the mill drive system for a grinding application, a large number of questions must be answered. Depending on the mill size and type, the mill can be driven by several configurations
Jan 1, 2001
-
Geology Of The Storm Gold Deposit, Northern Carlin Trend, NevadaBy R. Hipsley, D. Arbonies, P. J. Dobak, M. Visher
The Storm deposit is a high grade breccia hosted “Carlin-type” gold deposit located at the north end of the Carlin Trend. Storm consists of 3 smaller deposits: 1) 49er Zone, 2) End Zone, 3) Discovery
Jan 1, 2001
-
Lake Ft. Smith Microtunneling Lake TapBy Roberto J. Guardia, Ted Lewtas, Peter Rasmussen, Klaus Winkler
As part of the Lake Fort Smith Water Supply Dam Enlargement project, located in northwest Arkansas, microtunneling methods were used to install two side-by-side,1.53m (60-in) inside-diameter steel pip
Jan 1, 2005
-
Bio-Indicator Evaluation of Water Quality Impacts from Inactive and Abandoned Mines in the Bear Butte Creek Basin of the Black HillsBy A. D. Davis, J. L. Sorensen, C. J. Webb
Environmental impacts from acidic mine drainage are growing national concerns that are particularly acute in the headwaters of the Rocky Mountain region. In the Black Hills of South Dakota, approximat
Jan 1, 1999
-
Tunneling Data: Turning Information into Intelligence on the NEIS ProjectBy John McDonald, Peter C. Raleigh, Christopher Dishlip
This paper will discuss how the construction management team and the contractor working together on the City of Los Angeles, North East Interceptor Sewer project, managed information on a daily basis.
Jan 1, 2005
-
Effects of sintered metal diesel particulate filter system on diesel aerosols and nitric oxides in mine airThis study was conducted to establish the effects of a diesel particulate filter (DPF) system with sintered metal substrate on the concentrations and size distributions of nano and ultrafine aerosols
Jan 1, 2009
-
Improved Process Control Through Real-Time Measurement Of Mineral ContentBy D. Hopkins, D. Türler, R. D. Giauque, W. B. Davis, M. Karaca
In a highly collaborative research and development project with mining and university partners, sensors and data-analysis tools are being developed for rock-mass characterization and real-time measure
Jan 1, 2002
-
Innovative Directional Controlled Blasting Technique for Excavation of Unstable Slopes Along a Busy Transportation Route: a Case Study of Konkan Railway in India Mining, Metallurgy and ExplorationBy Aditya Rana, A. K. Mishra, M. M. Singh, N. K. Bhagat
Many cases of derailments, train accidents and traffic interruptions due to the slope failure and rockfall have been reported in the past on Konkan Railway trackline because of unstable rock slopes. T
-
Mining Engineering Education Initiatives in AustraliaBy Bruce Hebblewhite
Australia’s Minerals Tertiary Education Council (MTEC) has achieved several successes during its first three years of operation. This initiative was developed through the Minerals Council of Australi
Jan 1, 2006
-
Microcomputer Analysis Aids Continuous Mining Productivity at TanomaBy Scott G. Britton
Microcomputeranalysis has long been a technique for engineering professionals to improve the theoretical and practical design of continuous mining systems. Such work has been typically composed of mod
Jan 1, 1991
-
Eddy-Current Separator Technology As A Novel Approach To Alaskan Placer Gold RecoveryBy D. A. Norrgran, J. A. Wernham, D. E. Walsh
A qualitative test program was sponsored jointly by the University of Alaska and Eriez Magnetics, in order to study placer gold nugget recovery using an eddy-current separator. Various gold nuggets f
Jan 1, 2003
-
Roof Bolter Rocker Pad Deflector SystemsBy Arnold Hammons
Automated temporary roof support (ATRS) systems have been incorporated into roof bolters since the 1970?s. During roof bolting, many injuries have occurred from large pieces of draw rock falling inby
Jan 1, 2009
-
Overview of the geology and production of Wyoming tronaBy Ray E. Harris
Introduction A resource of more than 122 Gt (134 billion st) of minable trona and mixed trona and halite underlies an area of about 3400 km2 (1300 sq miles) west of Green River, WY (Culbertson, in pr
Jan 10, 1985
-
International Project Management: Challenges For a Junior Mining CompanyBy Andrew Kaczmarek
The mining industry is enjoying a much needed and long awaited increase in demand for natural resources. However, consolidations in the mining and mining service industries, along with a generational
Jan 1, 2006
-
Construction of Deep Shafts and Ground Improvement for the West Side CSO Tunnel Project, Portland, OregonBy Yves St-Amour, Vince Luongo
This paper will discuss one of the largest construction projects the City of Portland has undertaken. This phase of the Willamette River Combined Sewer Overflow (CSO)project consists of approximately
Jan 1, 2005
-
In Situ Copper Mining at Santa Cruz – A Project UpdateBy Tim O’Neil
The US Bureau of Mines and the Santa Cruz Joint Venture (SCJV) are working on a production-scale, in situ copper recovery project in Arizona. The research is being conducted at the Santa Cruz site, lo
Jan 1, 1991
-
ANI’S Innovative Single Motor Twin Pinion [SMTP] Grinding Mill DriveBy J. B. Hadaway
The current limit to power transmission for grinding mills through one mill pinion is approximately 7,500kW. Above this power rating either twin pinion arrangements or Gearless drives are required. Th
Jan 1, 2001
-
A Mathematical Programming Model For Open Pit Short-Term Production SchedulingIn this paper, a mixed integer linear programming (MILP) model for the short-term scheduling of open pit mines is formulated. The proposed model aims at sequencing the blocks extraction over multiple
Jan 1, 2011