Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Kinematic Approach for Blast ModelingBy Ruilin Yang
Kinematic approach of blast modeling refers to using the velocity, strain, or displacement as controlling parameters to model blasting, rather than the stress and the material constitutive relations.
Feb 1, 2020
-
Perimeter Control Utilising Electronic DetonatorsBy John Wall
The use of electronic detonators in civil tunnelling applications, to reduce vibration is small firings has been successfully utilised for a number of years. As part of the mining industry’s commitmen
Jan 1, 2012
-
A Mine-to-Crusher Framework for Aggregate Operations – Part 3By Diogo Fonseca, José Manuel, Nuno Fernandes, Francisco Monteiro, Andrew Palangio, Blessing Taiwo
This study aims to enhance the integration between blasting and primary crushing operations in quarrying by optimizing the size of oversize and bypass fragments, ultimately reducing energy consumption
Jan 26, 2026
-
Predictive Modelling for Equipment Blast Exclusion Zone ReductionBy Kim Henley, Chris Batten
This paper discusses the use of the Orica WildFireTM flyrock model to help mining operations in Australia and Asia minimise blast exclusion zones for equipment, increasing utilisation and productivity
Feb 1, 2020
-
HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive GroundBy K. Dufresne
Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron
Jan 1, 2024
-
Development of Controlled Blasting Pattern for Rock Excavation to Create Foundation of an Industrial EstablishmentBy Dipankar Gorain, A K. Vishwakarma, Vivek K. Himanshu, Murari P. Roy, Shubham Singh, R S. Yadav
The industrial establishments of a power plant consist of many important structures viz. cooling tower, wagon tippler, track hopper, plants and offices. The leveled foundation is the utmost need for e
Feb 6, 2023
-
Modeling of rock fragments trajectories ejected from blasting based on high-speed video analysisBy Jaime Herrero, Santiago Gómez, Pablo Segarra, José Ángel Sanchidrián
This paper presents a mathematical model for the study of the 2D movement of blast bench faces based on the high-speed video analysis of three blasts at El Aljibe quarry (Spain) recorded at 2,000 fram
Jan 26, 2026
-
Initial Testing of a Speed of Sound Test Apparatus for Powdered ExplosivesBy Barbara Rutter, Shonn Kevin McNeil
"This study discusses how a prototype was built to measure the sonic velocity in powdered explosives.The sonic velocity of an explosive is a benchmark to determine if the explosive deflagrates or deto
Jan 1, 2017
-
Automatic Blast Design Based on Autonomous DroneBy Thierry Bernard
New technology to automatically design a blast based on autonomous drone. The process of flying a drone, calculating the 3D cloud of points, generating the critical face profiles and placing holes aut
Feb 1, 2020
-
Responsible Blasting: Strategies for Community Impact MitigationBy César Ugaz, Jorge Cardenas
Mitigating the vibrations resulting from a blasting rocks is one of the most common challenges that Peruvian mining has, since if this impact is not mitigated it can generate discomfort and altercatio
Jan 26, 2026
-
Examination of Dynamic Parameters of Rocks using Hopkinson Bar ExperimentsBy O. Rielo, A. Pascoal, P. Katsabanis
The dynamic parameters of two different granites have been obtained using Hopkinson bar experiments. One series of experiments were conducted using a Hopkinson pressure bar apparatus with an explosive
Jan 1, 2011
-
The 1998 Explosion of the Debruce Grain ElevatorBy Jerome H. Stofleth
In June of 1998, the DeBruce Grain Elevator was devastated by an accidental explosion caused by the unintentional ignition of grain dust. The DeBruce grain elevator was the largest ‘single head-house’
Jan 1, 2004
-
Blast Design at Pinson MineBy Melvin A. Sannes
The Pinson Mine has several different rock formations, running throughout the pits. The main types of material found are Alluvium, Shale and Limestone. In some instances, all three can be found within
Jan 1, 1998
-
Radical Improvements to Blast Hole Drilling Cost and Productivity thru Integrated Teams (021b2c60-f412-46df-9bbc-00d582f72391)By R W. Thomas
This paper explores the possibilities of generating radical improvements in the drilling costs and productivity of blastholes through the efforts of integrated teams as opposed to traditional customer
Jan 1, 1996
-
Vibration Data Analysis to Optimize the Blast Design and Improve Shovel ProductivityBy Luana Ferreira de Carvalho, Aurelio Manço Garcia, Gustavo Sampaio Lopes, Jose Silvio Corsini, Davi Bastos Martins de Oliveira
The Enaex Mining Technical Solutions (EMTS) team, in partnership with the Anglo American Iron Ore Brazil drilling and blasting team, has developed a study aiming to optimize the blast design applied a
-
Vibration Data Analysis to Optimize the Blast Design and Improve Shovel ProductivityBy Luana Ferreira de Carvalho, Aurelio Manço Garcia, Gustavo Sampaio Lopes, Jose Silvio Corsini, Davi Bastos Martins de Oliveira
The Enaex Mining Technical Solutions (EMTS) team, in partnership with the Anglo American Iron Ore Brazil drilling and blasting team, has developed a study aiming to optimize the blast design applied a
Feb 1, 2020
-
Dynamic Mud Flow Effects on Emulsion Explosives in IndonesiaBy Garfiansyah Rayes
In 2023, an Indonesian coal mine experienced significant contamination of an emulsion blend explosive by dynamic mud and water flow, triggered by flooding due to exceptionally high rainfall. This intr
Jan 21, 2025
-
Tunneling in Thinly Foliated Rockmass ConditionsBy H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen
Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne
Feb 1, 2020
-
Signature Hole Method for Ground Vibration and Airblast in Mine Blasting; Convolution or Superposition?By B T. Lusk, John J. Silva Castro
The signature hole method uses a convolution operation to predict the waveform of a production blast based on the record of a waveform produced by a single blast hole. Convolution is a mathematical op
Jan 1, 2014
-
Optimization of Equipment Exclusion Zones in Mining Blasting Processes Through Predictive Analysis and Field ValidationBy Orica Peru, Pedro Lozada
Proper management of exclusion zones in blasting operations is essential to ensure safety without compromising operational efficiency. In Peru, mining regulations establish minimum exclusion distances
Jan 26, 2026