Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Response of Non-Traditional Structures to Coal Mine Blasting

    By Catherine Aimone-Martin, Mary-Alena Martell

    Whole-structure and mid-wall responses of 33 non-traditional structures to surface coal mine blasting were characterized. Eighty-nine blasts were conducted at 11 mine sites throughout the U.S. to meas

    Jan 1, 2002

  • ISEE
    Demolition of the Milwaukee Railroad Trestle Pier, Lind, WA

    By William C. B. Gates

    Demolition blasting next to an active railroad can be very challenging because of track safety, blasting vibrations, potential track fouling by blast debris, and short work windows on a live track. Re

    Jan 1, 2016

  • ISEE
    Effect of Explosive Type on Particle Velocity Criteria in Ground Vibration

    By SMF Hossaini

    With the aim of a clearer understanding of the applicability of existing empirical equations for blast induced ground vibration, an investigation has been conducted on three mostly applied forms of su

    Jan 1, 2004

  • ISEE
    Running a Drill Program that Supports the Mission of Blasting

    By William D. Hissem

    While much technology has been developed and brought to bear in the area of blasting applications, the foundation work required for success in the muck pile begins with the drilling program.

    Jan 1, 1997

  • ISEE
    "Synchronized Blasting Demolition of Workshop and Chimney under ComplicatedConditions"

    By Jun Yang, Zongshan Zou, Mei Qu, Jianjun Zuo

    For technical renovation of the thermal plant, one frame structure workshop of 50,000 m2 (59,800 yd2) construction area and one reinforcement concrete chimney of 150m (492 ft) height shall be demolish

    Jan 1, 2016

  • ISEE
    Analysis of Dynamic Stability of Rock Slope Under Loading of Blast Induced Seismic

    By Wenbo Lu

    A combined method is present in this paper in analysis the dynamic stability of rock slope under the loading of blast induced seismic, in which, by combining the dynamic load calculating method of qua

    Jan 1, 1999

  • ISEE
    Guidelines of Overburden Casting

    Since the ecrly 1970's several factcrs have changed. In the East the larger tracts of coal mined with large eauipment are being dePleted, The cost of moving the larger equipment from small tract to s

    Jan 1, 1989

  • ISEE
    Blast Design Methodology for Surface Mines: An Integrated Approach to Optimization - Part 2

    By G. R. Adhikari

    Step 4: Selection of explosives and initiation system Various types of explosives are manufactured in India and a wide choice is available among them that include nitroglycerin based explosives, slurr

    Jan 1, 2002

  • ISEE
    *Kuz-Ram and Digital Image Processing System Combination to Determine Specific Blasting Parameters

    By A. Karadogan, G. Tuncer, A. Kahriman

    Determination of optimal blast parameters have been the priority act for blasters on the field due to financial and technical properties of the operation. Therefore many researchs were done to establi

    Jan 1, 2005

  • ISEE
    The Effects of Underground Blasting on Nearby Pre-existing Structures

    By Scott Rosenthal, Logan Connolly

    Butte, Montana holds a prestigious place in the history of mining, deemed “The Richest Hill on Earth,” containing a plethora of underground mines. The Orphan Boy/Orphan Girl underground mines, on the

    Jan 1, 2018

  • ISEE
    Monitoring and Prediction of Blast Vibrations : A Case Study

    By D Vidyarthi

    Blasting is the most important activity in the mining industry, the world over. It is a well known fact that only part of the explosive energy gets utilized in causing the actual rock fragmentation. T

    Jan 1, 2007

  • ISEE
    The Construction and Testing of a Polycarbonate Safe Haven Wall

    By Braden T. Lusk, Rex A. Meyr, Kyle A. Perry

    Following three major mining accidents in 2006, the MINER Act of 2006 was enacted by MSHA and required every underground coal mine to install refuge alternatives to help prevent future fatalities of t

    Jan 1, 2014

  • ISEE
    Application of the Blast Fragmentation Models in a Sandstone Quarry

    By Türker Hüdaverdi, Özge Akyildiz

    "In this research, image analysis technique, Kuz-Ram and KCO Models were used to examineefficiency of the quarry blasts. Investigations were performed in Cendere region, Istanbul. As a firststep, imag

    Jan 1, 2016

  • ISEE
    Surface Instabilities from Buried Explosions

    By Daniel P. Lathrop, Leslie C. Taylor, William L. Fourney

    Except when the target is on the surface, e.g. a tank track, the most important loading mechanism from a buried charge on a target above it is the impact of soil propelled at the target by the expandi

    Jan 1, 2009

  • ISEE
    A Study of the Use Signature Holes for Smaller & Faster Moving Construction Blasting Operations

    By Dale Bartholomae, David Harrison, Edward J. Walter

    Methods that involve the use of signature blast holes in order to identify the particular frequency characteristics of a geographical area are widely available. Information acquired can be used to det

    Jan 1, 2005

  • ISEE
    Controlled Underwater Blasting in Santos Port, Brazil

    By Paulo José Costa Couceiro Junior, Manuel Lopez Cano

    The biggest Port of Latin America - the Santos Port in São Paulo, Brazil - has been drilled and blasted by controlled underwater techniques in order to remove around 40,000 m3 (52,318 cubic yard) of r

    Jan 1, 2016

  • ISEE
    A Simple Method of Determining Site-Specific Safe Decking Procedures in Order to Avoid Dynamic Pressure Issues When Decking

    By Neal Lee, Braden T. Lusk, Brendan McCray

    Determining the minimum amount of inert material that can be used between explosive columns is a complex problem. Using too little inert material can result in detonator/primer failure, either by symp

    Jan 1, 2016

  • ISEE
    Air overpressure Prediction Equation for Construction Blasting

    By Calvin Konya, Anthony Konya

    State and Federal construction specifications require the Blasting Contractor to prepare a Master Blasting Plan which is reviewed by the Owner’s Representative. The Master Blasting Plan requires the

    Jan 1, 2015

  • ISEE
    Deep water excavation with shaped charges: a case history in Lake Mead, Boulder City, Nevada, USA

    By Roberto Folchi, Hans Wallin

    Lake Mead, the largest man-made reservoir in the United States, is located about 30 miles southeast of Las Vegas, Nevada. For the construction of Lake Mead third water intake, which is entirely placed

    Jan 1, 2012

  • ISEE
    Large Diameter and Deep Hole Presplitting Techniques for Safe Wall Stability

    By Sam Bang Jr, Rodney Burke

    As mining progresses in the West, the depth of material has increased, making highwall stability a major factor in safety and production. The Jim Bridger Coal Mine’has made highwall stability a priori

    Jan 1, 1998