Cooling Water Intake Shafts for the Oak Creek ExpansionBy Edward Jacobsen, Patrick J. Lydon
"The ongoing expansion of the Oak Creek Power Plant in Oak Creek, Wisc., includes a tunnel bored in rock that connects to four vertical intake shafts approximately 1.5 miles (2.4 km) offshore in Lake
Jan 1, 2008
-
Quality Control of Pile Installation Using Digital Pile Penetration and Rebound Monitoring SystemBy Hee-suk Yun, Dae-jin Hwang, Jeong-woo Seok, Myoung-mo Kim
"In this paper, the accuracy of the data measured by a newly developed displacement measuring system, DPRMs (Digital Pile Penetration and Rebound Monitoring system) and its applicability as a quality
Jan 1, 2005
-
Thermo-Mechanical Behavior of Energy Piles: Full-Scale Field Test VerificationBy Tracy Brettmann, Melis Sutman, C. Guney Olgen
"The use of energy piles for geothermal heat exchange has been steadily increasing during the last decade, yet there are still pending questions on their behavior during temperature changes. This pape
Jan 1, 2017
-
Analysis of Load Transfer along Large Diameter Bored Piles in Very Dense SandsBy Nabil F. Ismael, Khalid Farraj
"The axial load transfer along large diameter bored piles in very dense silty sand was examined by field tests. Two instrumented piles 1.2 m diameter and with embedded length of 18 m and 25 m were loa
Jan 1, 2017
-
Laterally Loaded Caissons for Ontario College of Art & DesignBy William F. Starke
"The Ontario College of Art & Design (OCAD) located in Toronto, Ontario, found itself in dire need of space due to increased enrollment, leading them to embark on a major expansion and redevelopment o
Jan 1, 2004
-
Design, Construction, and Long-Term Monitoring of a Pile-Supported LNG Tank in Savannah, GeorgiaBy Cheng Lin, Guoming Lin
"This paper presents a case history for the design, construction and long-term performance monitoring of a driven prestressed concrete (PSC) piled foundation supporting a large liquefied natural gas (
Jan 1, 1900
-
DFI Collaborates on Risk-Based PanelsBy Derrick Dasenbrock
Two DFI committees independently organized two complimentary panel sessions for the recent American Society of Civil Engineers' (ASCE) Geo- Risk 2023 "Advances in Theory and Innovation in Practice" Co
Sep 1, 2023
-
St. Louis Service Base Floating Wharf Mooring System ReplacementBy A. Bozorgzadeh, B. M. Jensen, B. N. Koelling, B. R. Murtaugh
"The Service Base mooring system originally consisted of two general types of structures, 19 timber piles cabled together and steel three-legged pipe piles. The St. Louis District fleet moored to the
Jan 1, 2017
-
Overview of Construction and Design of Auger Cast-in-Place and Drilled Displacement PilesBy Monica Prezzi
"Auger cast-in-place (ACIP} piles and drilled displacement piles are being increasingly used as foundation elements for structures, particularly in projects requiring accelerated construction or invol
Jan 1, 2005
-
The Use of Rigid Inclusions to Support Large SpansBy Michael Shedlosky, Sonia Sorabella Swift, Nina Carney, David Tarasovic
Rigid inclusions were used to support roadway fills and mechanically stabilized earth (MSE) walls for the South Capitol Street Corridor project. The first phase of this two-phase, nearly $1 billion pr
Jan 1, 2019
-
Inspector's Manual For Driven Pile Foundations ? IntroductionThis manual provides basic practical instruction on the inspection of driven piles. It covers the essential components of pile driving, such as the pile driving hammer, hammer accessories, the pile an
Jan 1, 1997
-
Lateral Capacity of Drilled Shafts Considering Push-Pull ResistanceBy Ke Yang
"Drilled shafts are typically used to support structures subjected to large moments at the shaft head. The large moment can produce push and pull forces on the two sides of a drilled shaft. Consequent
Jan 1, 2005
-
DFI and NDT – Parallel Histories and Mutual BenefitsBy Bernard H. Hertlein
"When the Deep Foundations Institute (DFI) was founded, quality assurance and quality control (QA/QC) of foundation construction was rudimentary. Nondestructive testing (NDT) was a nascent technology,
Jan 1, 2017
-
Commentary on the Selection, Design and Specifcation of Ground Improvement for Mitigation of Earthquake-Induced LiquefactionBy Ground Improvement Committee
The evaluation of earthquake-induced liquefaction has become a routine part of geotechnical engineering design. For a given project, if an analysis identifies a potential for liquefaction and the cons
Aug 1, 2013
-
Analysis of Structural Capacity and Stiffness of Drilled Shafts with Construction Defects and RepairsBy John P. Turner, Benjamin J. Turner
"Non-destructive testing and evaluation (NDT/NDE) methods have become standard tools as part of the post-construction quality assurance of drilled shaft foundations. In responding to anomalies, founda
Jan 1, 2016
-
Design Of Self-drilling Micropiles For Permanent ApplicationsBy Racquel Nottingham, Freddy Lopez, Ole Gadermann
The ongoing urban development is a global phenomenon, placing has high demands on urban infrastructure (housing, public services, transportation, telecommunications, etc.). Micropiling is one of the m
-
On Driven Piles In The Arabian Gulf: Imperfections, Potential Challenges, And Lessons LearnedBy Waddah Akili
The demand on pile installation in the offshore of the Arabian Gulf has, over the last two decades, experienced unprecedented boom, triggered by the construction of platforms, to help facilitate the p
-
Full-Scale O-Cell Load Test for a Rotator Drilled Rock Socket at the Main Span of the New Benicia-Martinez BridgeBy Ronnie X. Gu, Xing Zheng, Gem-Yeu Ma
Due to implementation of the rotator construction method from which a smooth shaft was anticipated, a full-scale pile load test (Osterberg Method) was performed at Pier 14 Pile 9 of the main span of t
Jan 1, 2005
-
Case Histories of Arch Action Low Improvement Ratio Cement Column Method (ALiCC Method)By Jun Ohbayashi, Yoshiyuki Yagiura, Hiroaki Miyatake, Masuo Kondoh, Naotoshi Shinkawa
"Reducing the improvement ratio of ground improvement is an extremely efficient way to reduce the construction cost and construction period of mitigation measures for soft ground. The Arch Action Low
Jan 1, 2015
-
Innovative Use Of ACIP Piles And Geogrid To Support Kroger Superstore (97785a40-c93d-4648-ae71-8e34822bf6ed)By George C. Webb
A wide variety and variable depth (up to 40 ft.) of compressible, uncontrolled fill (including construction debris and a perched water condition) was present at a proposed Kroger construction site in
Jan 1, 2003