Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Settlement Of Tall Buildings Supported On Deep Foundations In Southeast Florida, USA

    By Rudolph P. Frizzi

    This paper presents different deep foundation systems and associated settlement records for high-rise building projects in the coastal areas of southeastern Florida. An introduction to the sedimentary

    Jan 1, 2003

  • DFI
    Innovative Riverbank Erosion Control Retaining Wall System for the Brazos River

    By Tracy Brettmann, Will Bohlen

    An innovative retaining wall design consisting of tangent drilled shafts with supplementary seal piles was used to limit continuing bank erosion along the Brazos River in Southeast Texas. The riverban

    Jan 1, 2018

  • DFI
    New York City - A Review Of Various Foundation Problems And Solutions - Synopsis

    By Mel Febesh

    Working in New York City has become the graveyard of many Foundation Contractors. Varying subsurface conditions require Foundation Contractors to be aware of the conditions at each particular site and

    Jan 1, 2000

  • DFI
    Float-In Cofferdams

    By Robert B. Bittner

    Large diameter piles (2 to 3 m diameter, both driven and drilled) are being used more frequently by designers of bridge foundations. The use of these large piles allows the pile cap to be positioned

    Jan 1, 2013

  • DFI
    Bored Piles With Base Preloading By Grouting - The Polish Experience

    By Bolestaw A. Ktosihski

    Preloading of bored pile bases by grouting is an effective way of reducing foundation costs. The bearing performance of a pile may be considerably improved. Various techniques and devices are used. Pr

    Jan 1, 2006

  • DFI
    Seal Slab / Steel Pile Interface Bond From Full-Scale Testing

    By Gray Mullins

    This paper presents results from model and full-scale tests to assess the interface bond between a cast-in-place concrete seal slab and steel H-piles in cofferdams. Three different seal slab placemen

    Jan 1, 2013

  • DFI
    A Review Of Typical Foundations Used In The City Of Cleveland, OH

    By David V. Lewin

    Heavy structures in central Cleveland, Ohio, are supported on raft foundations, driven piles, or caissons. Settlements can be predicted and structures are designed to accommodate such settlements. On

    Jan 1, 1985

  • DFI
    Cyclic Degradation Of Pile Foundations For Offshore Wind Turbines

    By Fabian Kirsch

    Cyclic behaviour of axially loaded piles has been an issue since studies revealed that the capability to transfer skin friction into the ground is highly depending on the level and the number of load

    Jan 1, 2011

  • DFI
    Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century Construction (f1b0a5f2-b1b8-41d4-bbfb-fab6f395e7a0)

    By Alan D. Fisher

    Amtrak made a decision to replace an aging bascule bridge with a vertical lift bridge for their crossing of the Thames River in New London, Connecticut. The new lift bridge occupies the same alignmen

    Jan 1, 2008

  • DFI
    Optimal Subsurface Investigation Approach for Overhead Transmission Structures

    By Haijian Shi, Drew Pizzo

    This article focuses on the appropriate application of subsurface investigation methods for transmission structures, which are typically designed to resist lateral rather than vertical loads. Currentl

    Jan 1, 2018

  • DFI
    Application Of, And Experience With, An Electronically-Controlled Hydraulic Piling Hammer ? 1 ? Introduction

    By D. Arentsen

    Changing environmental laws, new operating requirements and the increasing accuracy with which the bearing capacity of driven piles can be calculated have all led to the development of hydraulic pilin

    Jan 1, 1987

  • DFI
    Load Testing High Capacity Drilled Shafts - Summary

    By Jorj O. Osterberg

    Until ten years ago, the largest load tests on drilled shafts (bored piles) were about 3,000 tons (27MN). These tests were made with kentledge (large weights, usually concrete blocks) stacked up as a

    Jan 1, 2002

  • DFI
    Experimental And Theoritical Studies On Pile Capacity - Synopsis

    By K. Rambha Devi

    The paper is an attempt to co-relate the findings of pile capacity using a number of formula suggested by various authors with the actual field load test results. Five locations consisting of wholly s

    Jan 1, 1996

  • DFI
    Predication Of Heave For Deep Excavation With Irregular Plane Shape

    By Zhang Jiaju

    For the highrise buildings with deep foundstion of irregular plane shape, an appropriate calculate model to the heave of foundation soil after excavation is proposed and studied using analytic method

    Jan 1, 1991

  • DFI
    Formation Of Interlocking Jet Grout Columns At Large Depth

    By Chu E. Ho

    Jet grout column formation at large depths are prone to several uncertainties, such as inaccuracy in setting out boreholes, drilling deviation, soil variability and reduced jetting energy at the nozzl

    Jan 1, 2008

  • DFI
    Design Development & Installation Of Glass Fibre Reinforced Polymer (GRP) "Soft Eyes" In Diaphragm Wall Reinforcement Cages.

    By Paul M. Wiltcher

    This paper discusses how benefits in engineering design can be achieved from combining existing GRP concrete design guidelines with carbon steel design codes primarily made possible due to the increas

    Jan 1, 2006

  • DFI
    Deep Foundations On Deer Island

    By Michael W. Oakland

    Deer Island is the site of the Massachusetts Water Resources Authority (MWRA) wastewater treatment plant which, when completed in 1999, will serve 43 cities and towns in central eastern Massachusetts.

    Jan 1, 1994

  • DFI
    Mission Valley Viaduct Piledriving - 1998 DFI Conference Seattle, Washington October 8, 1998

    By David A. Jack

    The Mission Valley Viaduct is located in San Diego, California. This structure is the intersection of Interstate 8 and 805. The project consists of the main viaduct, 8 connecting ramps, and one highwa

    Jan 1, 1998

  • DFI
    Slurry Wall Design For Hong Kong Station

    By Stephen T. Young

    The construction of Phase 2 of Hong Kong Station, its retail podium and International Finance Centre Two, the tallest building in Hong Kong, will be completed in the middle of 2003. This paper describ

    Jan 1, 2003

  • DFI
    The Alternate Technical Concept Process For Foundations At The New Mississippi River Bridge, St. Louis

    By Dan A. Brown

    The New Mississippi River Bridge (MRB) employed conventional design-bid-build procurement, but the bidding process included the opportunity for pre-qualified bidders to develop and propose confidentia

    Jan 1, 2011