Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Development and Implementation of an Operating Concept and Training Program for the Start-Up of the Stanleigh Mill

    By H. Ewaschuk

    "INTRODUCTIONRio Algom's Stanleigh Mill in Elliot Lake began production in June of 1983. The highly instrumented mill treats uranium ore at an average rate of 3900 metric tons per day. To help ensure

    Jan 1, 1985

  • CIM
    Study of Relationship between Pyrochlore Matrix Composition and Surface Chemistry Effects on Collector Adsorption

    By B. Hart, J. Marois

    "Scanning electron microscopy coupled with energy dispersive X-ray spectroscopy (SEM–EDX), and Time of flight secondary ion mass spectroscopy (TOF-SIMS)were used to analyze pyrochlore grains from Niob

    Jan 1, 2013

  • CIM
    Operational Improvements in Seven Mineral Processing Plants by Increasing Grinding Circuit “Classification System Efficiency (CSE)”

    By Robert E. McIvor

    "“Classification System Efficiency (CSE)” is a powerful, emerging tool that can be used to increase grinding circuit efficiency. It is defined as the percentage of the ball mill energy being used to g

    Jan 1, 2013

  • CIM
    Simulation of Closed Circuit Mineral Processing Operations Using Limn® ?Flowsheet Processing Software.

    By Donald Leroux, Colin Hardie

    "New or improved mathematical models of mineral processing machines are published almost on a monthly basis. Often, these models can be calibrated from bench-scale test results and programmed using sp

    Jan 1, 2003

  • CIM
    Including In-Process Inventories in the Metal Accounting of Flotation Plants

    "Increasing demand for timely and accurate information about flotation plant performance requires metal accountants to increase the scope and reporting frequency of plant production. This trend has br

    Jan 1, 2014

  • CIM
    New Mill Design for Large Grinding Mills

    By Kjell Winther

    "Hydralift Scanmec introduced early in the eighties a new and different mill design for very large grinding mills. The design described has actually no size limitation upwards and is so far suggested

    Jan 1, 1995

  • CIM
    Circuit Consolidation at Pine Point Mines Limited Pine Point, N.W.T.

    By R. E. Jones

    "INTRODUCTIONCominco Limited, one of the free world's largest producers of lead and zinc having majority ownership in Pine Point Mines Ltd., operates a mining and concentrating complex on the south sh

    Jan 1, 1982

  • CIM
    Grinding media evaluation at Brunswick Mining

    By R. Grant, C. Bazin

    "Brunswick Mining has investigated grinding media optimization for the purpose of improving the flotation feed and regrind product size distributions to enhance metal recoveries. This paper presents t

    Jan 1, 1994

  • CIM
    Comparison of Ore Hardness Measurements for Grinding Mill Design for the Tenke Project

    By David Meadows, John Starkey

    "As part of the ongoing project development for the Tenke Fungurume Copper-Cobalt Project in the Democratic Republic of Congo, Phelps Dodge Corporation has examined methodologies for determining the s

    Jan 1, 2007

  • CIM
    Flotation of carbon values from blast furnace flue dust using statistical design

    By P. K. Naik, B. Das

    Flotation studies were carried out to recover carbon values from blast furnace flue dust containing ~30.34% carbon, 4.6% volatile matter (VM), and 65.03% ash. The variables chosen for the experiments

    Jan 1, 2005

  • CIM
    Alkali/Alumina Molar Ratio Trends in Altered Granitoid Rocks Hosting Porphyry and Related Deposits

    By R. E. Whitehead

    "Alkali/alumina and MgO/alumina molar ratio plots graphically portray both chemical and mineralogical changes accompanying potassic, phyllic, argillic, chloritic, and alunitic alteration of quartz mon

    Jan 1, 2009

  • CIM
    Application Practice of Bottom Blowing Continuous Converting to Replace Copper P-S Converter

    By Hongfei Li, JianLong Wang

    This paper introduces the technical characteristics, transformation scheme and production practice of the project in which Copper P-S Converter was replaced by Bottom Blowing Continuous converting for

    Jan 1, 2019

  • CIM
    The Design of Instruction to Introduce a New Technology: A Case Study in Canadian Mineral Processing

    By H. D. Stolovitch, M. L. Lavallée

    "An engineering system used to analyze and improve the performance of industrial grinding circuits has been adapted into a training program. The systematic approach to the design of training was appli

    Jan 1, 1992

  • CIM
    Silica Flotation and the Use of Fine Screening in Iron Ore Beneficiation

    By G. Major-Marothy

    "INTRODUCTIONA beneficiation plant to upgrade earthy iron ores is being installed by the Iron Ore Company of Canada in Sept-Iles, Quebec.The crude ore for the plant will come from the Knob Lake area,

    Jan 1, 1972

  • CIM
    Removal and destruction of ammonia from a uranium plant effluent

    By P. A. Riveros, W. D. Gould, R. Molnar, D. W. Koren, P. Bédard

    This paper reports the results of the field demonstration campaign of a new process for removing and destroying ammonia from mining/ metallurgical effluent solutions. The 50-day campaign was carried o

    Jan 1, 2003

  • CIM
    The Effect of Particle Production History on Gold Leaching

    By Jessica Egan, Daniel Hodouin, Claude Bazin

    "The recovery of gold by leaching is influenced by the size of the gold carrier particles and the chemical environment. Using the relationships between the leaching rate, infinite recovery and particl

    Jan 1, 2009

  • CIM
    Geometallurgical Modeling - The New Approach to Plant Design and Production Forecasting/Planning, and Mine/Mill Optimization

    By Dave Bulled, Chris Bennett, Glenn Kosick, Glenn Dobby

    "Mining companies around the world are embracing geometallurgical modeling at a rapid rate, as senior executives realize that inputs must be properly measured if the output is to be managed effectivel

    Jan 1, 2004

  • CIM
    Coal Quality Estimation using Geophysical Logging Without Radioactive Sources

    By Filipe Beretta

    This study investigates geophysical logging capacity to predict coal quality. It was analyzed for possible correlation, some parameters determined via laboratory analysis of coal against results for t

    Oct 1, 2009

  • CIM
    The “Mill Redesign Project” at INCO’s Clarabelle Mill (54ceb038-1593-4f87-9a10-6e2a572d48df)

    By Jim Truskoski, Alain Bouchard, Andy Kerr, Germain Labonté, Jim Barrett

    "Improving mill grade recovery relationships is always good business. INCO’s Clarabelle Mill has just undergone a $16 million process upgrade that was designed to improve nickel recovery by 2%. The “M

    Jan 1, 2003

  • CIM
    Metallurgical Testing: Modeling Recovery versus Ore Grade

    By Manqiu Xu

    "Ore grades are decreasing and ore deposits are becoming more complex. In order to make a sound economical decision about a mining project, metallurgical testwork must be carried out. A few large “rep

    Jan 1, 2013