Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Copper Concentrate Quality Improvements at Myra Falls (40th Annual Meeting of the January 22 to 24, 2008 Canadian Mineral Processors Ottawa, Ontario, Canada )By Trevor Yeomans
"NVI Mining’s Myra Falls Operation is a forty year old underground mining operation feeding a 4000 mtpd concentrator.The current Mill, built in 1985, was designed to process a large massive sulphide o
Jan 1, 2008
-
Processing of Refractory Sulphides at Mantos de Oro, ChileBy John G. Peacey, Leoncio Sevilla G., Ford. Kevan J. R., Erling Villalobos C.
"Kinross Gold Corporation’s Mantos de Oro (MDO) gold/silver mine in northern Chile currently processes 15,000 tpd of oxide ores through a mill, whole ore cyanide leach plant followed by a Merrill-Crow
Jan 1, 2009
-
The Millennium Iron Range ProjectBy Robert Martin
New Millennium ?a new project for an experienced mine building team ?Owns 100% of KeMag(Harris Lake) property ?Owns 80% of LabMag(Howells River) property -20% owned by Naskapi Nations of Kawawachika
May 1, 2007
-
Optimisation of Coke Breeze Addition in Iron Ore PelletsBy G. Paquet, E. Godin
"Since the mid fifty's, worlwide pellet production capacity has constantly risen (Fig. 1, Ref. 1 l. There was however at that time no real incentive to decrease production costs but only to produce as
Jan 1, 1986
-
Regional and Local Patterns of CO2-K-Rb-As Alteration: A Guide to Gold in the Timmins AreaBy D. Duff, R. A. Cameron, R. E. S. Whitehead
"Although CO2 content indicates the quantity of carbonate in altered basaltic rocks, it does not measure the intensity of carbonate alteration. CO/CaO molar ratios, which correlate with the relative p
Jan 1, 1982
-
Expert System Technology at the Polaris MineBy G. A. Kosick, C. A. Harris
"Metallurgy at the Polaris Mine is approaching an impasse, with lead and zinc concentrate grades and recoveries approaching their theoretical maximums. In an effort to increase productivity, plant thr
Jan 1, 1988
-
Optimization and Increasing Throughput at JacobinaBy Alexandra Kozak, Rodrigo Costa, Bob Fukuhara
"The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The proje
Jan 1, 2008
-
Huckleberry Mines Ltd. Process Design and Project StartupBy Greg Rasmussen
"Huckleberry Mines Ltd is an open pit porphyry copper-molybdenum mining operation located 120 km south of Houston, British Columbia with a 18,000 tpd milling facility. Huckleberry Mines is owned 60% b
Jan 1, 1998
-
Flotation Circuit Design for Adanac Moly Corp using a Geometallurgical ApproachBy Dave Bulled
"This paper describes the design of a molybdenite flotation circuit using FLEET technology applied to kinetics data produced from laboratory flotation testing and distributed across the blocks of a mi
Jan 1, 2007
-
Integration of Sensor Technologies at a Bucket Wheel Excavator for Identification of Material Type and Detection of Interface LayersBy Martin Kesting
The world wide growth dynamics and the continuously growing demand for energy, results in increasing energy prices. Looking from this point, the efficient exploitation of fossil fuel deposits has beco
Oct 1, 2009
-
Flotation Column Scale-Up and SimulationBy G. S. Dobby, J. A. Finch
"I. INTRODUCTIONA significant development in flotation over the past few years has been the increasing industrial use of flotation columns, primarily in Canada. The column differs dramatically from co
Jan 1, 1985
-
Cyanide Recovery and Copper Removal from Gold Plant Effluents using Vitrokele™ - Pilot Plant ResultsBy D. Kidby, A. Briggs
"Vitrokele ™ is a synthetic adsorbent, using chelating groups on large polystyrene beads, developed in Canada over 7 years ago, and first commercialised in 1985 to recover noxious metals from plating
Jan 1, 1992
-
Applicability, Challenges and Recent Application Experience of WLAN and Ethernet as Integrated Mine Communication BackboneBy Christoph Mueller
Broad band mine communication traditionally is characterized mainly by individual solutions, which have in common their long development phases and their high cost for development, operation and servi
May 1, 2006
-
Jaguar?s Caeté Gold Project in BrazilBy Ivan C. Machado
Jaguar Mining Inc. is implementing a 1.1 Mtpy, 7-year LOM gold project in the Iron Quadrangle (?Quadrilátero Ferrífero?), Brazil. Construction is on schedule and startup is programmed for Q2 2010. Mil
May 1, 2010
-
Comminution Circuit Comparison Conventional versus Semi-AutogenousBy G. H. Babcock, D. A. Knight, V. G. Medina
"Production commenced at the Golden Sunlight Mine in 1983 and at Kidston Gold Mine in 1985. These projects were both constructed under the management of the Placer Dome Inc. (Technical Services) group
Jan 1, 1991
-
The Use of Aurix®100 Resin for the Selective Recovery of Gold and Silver from Copper, Gold and Silver SolutionsBy Tim Hughes, A. H. (Sandy) Gray, Jennifer Abols
"The selective recovery of gold and silver from solutions containing other metals such as copper is possible using AuRIX®100 resin in conjunction with the Gekko Resin Column. Selectivity is driven by
Jan 1, 2006
-
Mineralogical and Microstructural Investigation of Dead-Burned Magnesite from Eastern IranBy Khosrow Ebrahimi
We document the occurrence, mineralogy and firing properties of magnesite from hydrothermal deposits in the upper Cretaceous ophiolites of Eastern Iran. These deposits occur as thin veins of nearly pu
May 1, 2004
-
Technological Advances in Telecommunications for MinesBy Patrick M. Y. Waye
As mines utilise more automation in mining operations to improve efficiency and safety, a corresponding increasing demand is placed on the transport of information. Some of the recent technological ad
May 1, 2001
-
A Touch of Froth: How Bubble-Particle Aggregates Take the StrainBy Marco A. Vera
"This paper investigates the froth function in flotation and the associated upgrading process. Flotation literature has revealed that one of the main functions of the froth phase is the cleaning of bu
Jan 1, 2003
-
The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical ProjectBy Jan E. Nesset, Phillip J. Mackey
"Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain
Jan 1, 2003