Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Scaled depth of burial application to increase blast efficiency in PT. Indo Muro KencanaBy A Suwandhi, H Utama
PT. Indo Muro Kencana (PT.IMK) is a gold mine that is located in Central Kalimantan, Indonesia. Drilling and blasting activity is applied in order to support mining production. Drilling and Blasting (
Jun 22, 2022
-
The Impact of Classification on the Energy Efficiency of Grinding Circuits - The Hidden OpportunityBy W Valery, A Jankovic
A growing demand within the minerals industry for sustainable development and the introduction of carbon taxes have resulted in a significant focus on improving the energy efficiency of comminution ci
Oct 29, 2012
-
Setting Restoration Goals for Restoring Pit Lakes as Aquatic Ecosystems – A Case Study from Southwest AustraliaBy E J. B van Etten
Pit lakes may form when open cut mining leaves a pit void that then fills with ground and surface waters. This often replaces terrestrial ecosystems that existed prior to mining with an aquatic ecosys
Oct 5, 2011
-
High-speed Video – An Essential Blasting ToolBy S Wellink, D Chalmers, D Adermann, C Martin
The practice of recording blasts for quality control purposes has been conducted for several decades. However, at the low frame rates of a standard video camera, essential data is frequently missed as
Aug 24, 2015
-
Characterisation of In Situ Gold Particle Size and Distribution for Sampling Protocol OptimisationBy I M. Platten, Y Xie
Sampling protocols that are designed to suit the mineralisation style will result in a reduction of the nugget effect and hence resource risk. The a priori need for all sampling programs is the effect
Jan 1, 2008
-
Design and Construction Contract C916 Beauty World Station and Tunnels, SingaporeBy R McDonough
DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal
Sep 17, 2014
-
Resources and Reserve Assurance Processes – a Framework for Improved GovernanceBy L J. de Lange
As a material asset for mining entities, the resources and reserves (RR) estimation processes are surprisingly underrepresented in the assurance landscape. When press reports expose them being inaccur
Jun 22, 2016
-
The Roy Hill ProjectBy J M. F Clout
The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20
Jul 11, 2011
-
Negatively Geared Ore Reserves – A Major Peril of the Break-even Cut-off Grade"Recognising that the mining industry is wedded to the break-even cut-off grade rather than a cut-off grade that optimises value, the author examines some perils and pitfalls in the use of break-even
Mar 8, 2016
-
Dust Mitigation - Changing the ParadigmBy J Visser
Dust mitigation has long been seen as nothing more than managing a nuisance issue, but the reality is that poor dust management can lead to one or more of the following negative consequences: an incre
Aug 12, 2013
-
The practicalities of effective stress measurement in rockBy I Gray
This paper examines the practical limitations that affect the measurement of stress in rock. As most rock stress measurement is conducted through the invasive process of drilling a hole in a rock mass
Nov 30, 2018
-
Geomechanical Modelling of the Mount Isa Copper Deposit – Predicting MineralisationBy R O’Sullivan, D Taylor, J G. McLellan, B Miller
The Mount Isa copper deposit is located adjacent to the city of Mount Isa, Queensland, and lies within a series of Palaeoproterozoic to Mesoproterozoic Superbasins. The deposit is hosted almost entire
Aug 18, 2014
-
Special Purpose Simulator for Improved Estimation of Day-to-Day CIL/CIP RecoveriesSampling of CIL/CIP circuits is typically done by compositing samples of feed and tails over eight or 12 hour periods. As the residence time in the leaching tankage may be approximately 20 hours, the
Jan 1, 2006
-
Improving the Accuracy of Mine Site Water Balances through Improved Estimation of Run-off VolumesBy A Woodley, N C. Kunz
A mine site water balance is important for communicating information to interested stakeholders, for reporting on water performance and for anticipating and mitigating water-related risks through wate
Nov 26, 2013
-
Managing the Margin at Norseman, Western Australia – A Case StudyBy B P. Micke
Central Norseman Gold Corporation was established in 1935 and has been mining on the Norseman field in Western Australia since then. It is Australia’s longest continuously operating gold mining operat
Mar 24, 2014
-
Monorail Technology - A Rapid and Cost-Effective Method of Decline DevelopmentBy B Besa
Australia is a world leader in the design and operation of mines accessed by the decline method. Literature indicates that a number of metalliferous underground mines using the decline system are also
Jan 1, 2008
-
Dense media separation – a valuable process for preconcentrationBy I Grewal, M Lundt
Dense medium separation (DMS) is one of several preconcentration methods used for early waste rejection from run-of-mine ores at relatively coarse particle sizes prior to additional milling and benefi
Sep 11, 2017
-
Recovery of Colloidal Gold from Oxidised Concentrate Wash Liquor - Further ImprovementBy R Symes
The Fosterville Goldmine in Victoria Australia employs the BIOX« Process to liberate gold from its sulfidic flotation concentrate through bacterial oxidation. Gold occurrence is primarily as submicron
Oct 29, 2012
-
Belt Conveyor Transport SystemsThe demands of the economy require larger manufacturing facilities using greater quantit- ies of raw materials which must be mined, handl- ed, stockpiled and recovered with efficiency and dependabili
Jan 1, 1976
-
Use of Isanol in Production Blasting at ISA MineBy Bradford NL
The Isa Mine of Mount Isa Mines Limited produces 2.6 million tonnes of silver-lead-zinc ore annually from sub level open stopes of which approximately 40% comes from the narrow Racecourse orebodies be
Jan 1, 1985