Search Documents

  • AUSIMM
    Pilot Scale Carbonization of Wallarah Coal Using the Parry Process (6d646f40-1507-4d07-950f-53652f2f845c)

    A pilot plant was constructed for the low temperature carbonization of Wallarah (N.S.W.) coal at the rate of 300 lb/hr. The design was based on an entrained state carbonizer developed by Parry and D.S

    Jan 1, 1963

  • SME
    Battery Park Truck Sewer Emergency Tunnel Project

    By Mark Rybak

    On August, 31, 2006, Tropical Storm Ernesto hit the City of Richmond, Virginia. The Battery Park area was hit particularly hard, as flooding forced an evacuation of the area. A large sinkhole collapse

    Jan 1, 2008

  • NIOSH
    OFR-33-78 An Analysis Of Chemical Coal Cleaning Processes

    By Sabri Ergun

    Cost estimates and technical feasibility are compared for six chemical coal cleaning technologies. The comparison is based on conceptual application of the chemical cleaning methods for removal of pyr

    Jan 1, 1977

  • SME
    Numerical Analysis for the Prediction of Bump Prone Conditions: A Southern Appalachian Pillar Coal Bump Case Study

    Two miners were fatally injured when a pillar bump occurred during retreat mining in a southern West Virginia coal mine. The mine was operating in the Eagle seam with overmining in the No. 2 Gas and P

    Jan 7, 2020

  • ISEE
    Increasing Productivity Through Field Control and High-Speed Photography

    By David G. Borg

    "Although researchers have realized varying degrees of success in numerics modeling, computer blast simulations and small scale in-situ testing, most will agree that the greatest uncertainty in total

    Jan 1, 1989

  • DFI
    New Concepts For CFA (Auger Cast) Pile Controle - Synopsis

    By Shachar Magali

    This article describes two new concepts regarding the CFA (Auger Cast) piles. The first one, MALI Effect, is an approach to control the casting phase, while the second one, NETA Shear, is a technique

    Jan 1, 2000

  • SME
    Monitoring and Evaluation of Ground Movements Above a Deep Longwall Mine in the Eastern United States

    The prediction and control of ground deformations due to underground mining are important considerations in the permitting, planning, and monitoring of coal mining operations. The prediction of mining

    Jan 7, 2020

  • AUSIMM
    Control of Mineral Sands Dry Plant

    By D Gelling

    Mineral sands dry plants consist of a large number of repetitive unit operations with significant transport delays, in the form of stream pipes, conveyors and elevators. As part of the P255 mineral sa

    Jan 1, 2001

  • AUSIMM
    Mineral Composition of The Tin Ores of Renison Bell Tasmania

    By Edwards A. B

    Renison Bell is on the Emu Bay Railway, midway between Zeehan and Rosebery on the west coast of Tasmania. The tin deposits in this area have been described by G. A. WaIler (1902), L. K. Ward (1909), H

    Jan 1, 1943

  • AUSIMM
    The Metallogenic Map of New Zealand

    The metallogenic map of New Zealand shows the distribution of metallic mineral deposits, according to type and size, in relation to their geological setting. The major purpose of the map and accompany

    Jan 1, 1993

  • SME-ICGCM
    Evaluation of a Multiple Seam Interaction Coal Pillar Bump

    By Michael Gauna

    An evaluation and analysis of a coal pillar bump in a West Virginia mine indicated that the pillar bump occurred because of the unique combination of controlling factors. The pillar?s development sta

    Jan 1, 2008

  • NIOSH
    IC 8858 Mine Safety Education And Training Seminar - Proceedings: Bureau Of Mines Technology Transfer Seminars, Pittsburgh, Pa., Dec. 9, 1980, Springfield, Ill., Dec. 12, 1980, And Reno, Nev., Dec. 16, 1980

    Research personnel from the Bureau of Mines, a representative of the Mine Safety and Health Administration, and research contractors for the Bureau of Mines met with other Government and industry repr

    Jan 1, 1981

  • CIM
    Integration of gyratory crusher liner wear and operational performance for better crusher management

    By P. P. Rosario, D. M. Maijer

    The primary crusher is a key component in the comminution process applied in open pit mines. A collaborative research project between the University of British Columbia and Highland Valley Copper (HVC

    Jan 1, 2006

  • NIOSH
    RI 3942 Exploration of the Copper-Sulfur Deposit Khayyam and Stumble-on Properties Prince of Wales Island. Alaska

    By Earl L. Fosse

    "Preliminary examination of the Khayyam mine indicated that greater reserves of copper might be found by trenching, sampling, detailed geological and topographical mapping, and diamond drilling. The d

    Sep 1, 1946

  • SME
    Improved Fragmentation Through Data Integration - Introduction

    By R. Owen

    An overwhelming amount of data can be collected around the blasting process. This information can include blasting product, pattern design, blast results, and routing. It is only when these data sou

    Jan 1, 2011

  • SAIMM
    Seismic Wave Propagation To Diagnose The State Of Fracturing

    By M. W. Hildyard

    The aim of this paper is to demonstrate that active seismic measurements could have an impact in helping solve rock engineering problems experienced in the South African mining industry. The paper pre

    Jan 1, 2005

  • SME
    Laboratory Baffled-Column Flotation Of Mixed Campbell/Eagle Seam Bituminous Coal – Preprint 97-121

    By S. K. Kawatra, K. J. Shoop, T. C. Rao, T. C. Eisele

    This study investigates the use of a horizontally- baffled column (7.6 cm inside diameter by 344.2 cm high) to reduce the ash content of a high ash bituminous coal. Tests were carried out to determine

    Feb 24, 1997

  • SME
    Tunneling?Pipe Jacking of Large Diameter Pipes in O?Hare International Airport

    By Mohammad Djavid

    The one-pass tunneling pipe jacking method has often been the most schedule and cost efficient method for the pipe line installation. The main challenges in jacking pipes larger than 108 inches and fo

    Jan 1, 2008

  • SAIMM
    Characterization Of Au Catalysts - Synopsis

    By T. van Heerden

    A range of supported gold catalysts was prepared by ion exchange, varying many of the preparation variables, including concentration in the precursor solution, washing procedure, as well as drying and

    Jan 1, 2012

  • AUSIMM
    Ore-Treatment Plant and Treatment Operations-Edna May Gold Mining Company N.L., Westonia, W.A.

    NATURE OF ORETHE Edna May ore consists mainly of clean quartz of a moderately hard and tough nature. The gold content is "free" and fairly coarse, so that a large percentage is recovered by

    Jan 1, 1919