Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    An Approach To Identifying Geological Properties From Roof Bolter Drilling Parameters

    By Gerald I. Finfinger

    Identifying the properties of overlying rocks in underground mining operations is important to ensure the appropriate roof support design is used to maintain stability of the mine entries. Recently J.

    Jan 1, 2000

  • SME-ICGCM
    Load And Deflection Response Of Ventilation Stoppings To Longwall Abutment Loading - A Case Study (49571726-6a2d-49b8-8ef0-957c4421195c)

    By David C. Oyler

    Few studies have specifically measured and documented the large-scale loading behavior and durability of ventilation stoppings to mining induced movements, particularly from longwalls. Ventilation sto

    Jan 1, 2001

  • SME-ICGCM
    Supercomputer Assisted Three-Dimensional Finite Element Analysis Of A Longwall Panel

    By Duk-Won Park

    The excavation of a longwall panel causes a continuous stress redistribution in the surrounding strata for every face advancement. The understanding of the behavior of rock to high level of stresses i

    Jan 1, 1989

  • SME-ICGCM
    Numerical Modeling of the Pillar Confinement with Backfilling Material in Room?and?Pillar Coal Mining

    By Andre Zingano

    It is known that the backfilling confinement increases the pillar strength and also reduces the rib lateral displacement. With backfilling, it is possible to increase the room-and-pillar mining recove

    Jan 1, 2011

  • SME-ICGCM
    Longwall Production, Maintenance, And Roof Control System

    By W. Mark Hart

    The current Automatic Data Acquisition system developed by some support manufacturers make it possible to monitor and record changes in leg pressure, DA RAM stroke in every shield and shearer position

    Jan 1, 1994

  • SME-ICGCM
    Analysis of Roof Falls at and Recommendation of Roof Control Plansfor Rofomex Posphate Mine

    By Jinsheng Chen

    For underground openings, many factors can cause roof failure and thus roof falls. The most common factors related to Mother Nature are weak roof lithology, geological structures, and an abnormal in-s

    Jan 1, 2011

  • SME-ICGCM
    Vertical Stress Redistribution Around A Retreating Longwall Face End

    By D. A. Payne

    Large excavations, such as Iongwall panels, result in extensive vertical stress redistribution in the surrounding strata. The large abutment stresses developed may produce damage to pre-existing or pl

    Jan 1, 1995

  • SME-ICGCM
    Utilizing The ?Advance And Relieve? Method To Reduce Horizontal Stress Affects On The Mine Roof, A Case Study (b5b945af-699f-46b0-ae56-a98434baad9f)

    By Dennis R. Dolinar

    A room and pillar coal operation in central Pennsylvania was experiencing roof cutters and long running roof falls caused by high horizontal stresses. The roof conditions created hazards for the miner

    Jan 1, 2000

  • SME-ICGCM
    Identification Of Critical Slope Failure Surfaces With Critical Tension Cracks

    The formation of tension cracks in slopes is well known. Analytical studies require the determination of a critical slip surface for any slope and, in doing so, it is necessary to consider an appropri

    Jan 1, 1989

  • SME-ICGCM
    Longwall Mining Of Thin Seams

    By Ernest A. Curth

    An estimated 49 billion tons or 29 percent, of the coal reserve base to a depth of 1,000 feet in the eastern United States fall in the 28- to 42-inch range. Often left out as a consequence of selectiv

    Jan 1, 1981

  • SME-ICGCM
    GIS Supported Evaluation of Surface Level Impacts Due to Abandoned Near?Surface Mine Locations

    By Alexander Kattner

    Surface fractures in urbanized areas show the risk potential of near-surface mining. This kind of mining subsidence damage occurs mainly in areas where hard coal was mined near the surface with very l

    Jan 1, 2011

  • SME-ICGCM
    Variation of Horizontal Stresses and Strains in Mines in Bedded Deposits in the Eastern and Midwestern United States (18e10a78-83b8-48d9-ab61-d01619f77fb4)

    By Dennis Dolinar

    In general, the direction of the maximum horizontal stress in the eastern United States is fairly well defined. However, the variation of the magnitudes of the horizontal stresses is not very well und

    Jan 1, 2003

  • SME-ICGCM
    An Application Of Tree Classification Method In Analysis Of Longwall Shield Stability

    By Yong-Ming Jiang

    Longwall mining systems are extremely complex and expensive and require great caution for reliable and efficient operation. In many cases, ground control problems are the primary concern in longwall m

    Jan 1, 1993

  • SME-ICGCM
    Safe Mining Evaluation of Coal Seam between Abandoned Upper and Lower Room-and-Pillard Mines

    By Guorui Feng, Min Zhang, Yi Luo, Jian Yang, Yujiang Zhang, Junwen Bai

    "Safe mining of coal seam sandwiched between abandoned upper and lower room-and-pillared mines (ULPM) ·is increasingly becoming the focus of attention in recent years, which is closely related to the

    Jan 1, 2016

  • SME-ICGCM
    In-Situ Investigation Into The Causes Of Falls Of Roof In South African Collieries

    By J. Nielen van der Merwe

    The main objective of the research described in the paper was to determine the causes of falls of roof in South African coal mines. The south African Colliery Manager's Association and the member

    Jan 1, 2001

  • SME-ICGCM
    Reformation Of The Hydraulic Stowing Mining Method (81b9f573-b6ec-447f-bbcd-728c29bd41c4)

    By Liang Yinhuai

    The hydraulic-stowing mining method is most effective for mining thick coal seams. It is superior to the sliced cover-caving and artificial mining method and the fully mechanized sublevel-caving minin

    Jan 1, 1992

  • SME-ICGCM
    Rock Bursting and Seismicity During Ramp Development, Lucky Friday Mine, Mullan, Idaho (70e1cb23-d3f9-44e0-89bb-620862946d41)

    By J. K. Whyatt

    A comprehensive survey of mine seismicity and rock bursting during development of two sublevels at the Lucky Friday Mine, Mullan, ID, USA, was conducted to better define rock failure mechanisms and so

    Jan 1, 1998

  • SME-ICGCM
    Pillar Design - Continuous Miner Butt Section And Longwall Development Sections

    By Lawrence R. Artler

    The North American Coal Corporation, its subsidiaries and other coal companies, have been mining the Pittsburgh #8 seam in Eastern Ohio for several decades. Underground mining by the "room and pillar"

    Jan 1, 1984

  • SME-ICGCM
    Early Warning of Longwall Weighting Events and Roof Cavities Using Lva Software

    By David I. Hoyer

    It is shown that by monitoring longwall leg pressures in real time, warning can be given for significant weighting events and the formation of roof instabilities, such as roof cavities, several hours

    Jan 1, 2011

  • SME-ICGCM
    The NIOSH Shield Hydraulics Inspection and Evaluation of Leg Data (Shield) Computer Program (7f22bea3-620b-4bd0-a4b9-04ee2b01eea7)

    By Thomas Barczak

    Longwall shields provide essential ground control in Iongwall mining, yet a high percentage of shields are operating at less than peak capacity and many at well below the rated support capacity due to

    Jan 1, 2002