Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
State Summaries ? ArizonaBy N. Niemuth
Strong demand for copper in developing nations such as China and India, plus the additional demand for industrial minerals to supply the Arizona construction market, brought about a record-setting yea
Jan 1, 2008
-
Achieving A Dry TunnelBy Vernon K. Garrett, Gerhard Sauer
INTRODUCTION Generations of tunneling engineers had to fight not only against bursting rock and squeezing ground but also against the destroying power of water. Intrusion of groundwater into the
Jan 1, 1987
-
Underground Mine Air and Strata Temperature Change Due to the Use of Refuge Alternatives Mining, Metallurgy and Exploration (90281dd3-2aab-47ab-9150-b1897bd40ef5)By M. A. Reyes, L. Yan
Heat and humidity buildup withn refuge alternatives (RAs) may expose occupants to physiological hazards such as heat stress. The Mine Safety and Health Administration (MSHA) regulations require RAs in
-
Grouting and Segmental Linings—Proceed with CautionBy Thomas Gregor, Brian Garrod
As the popularity of precast concrete segmental linings for tunnels is growing in North America, some problems related to grouting of, and near, these linings are starting to appear. The installat
Jan 1, 2005
-
Rib Support Optimization for a Room-and-Pillar MineThe National Institute for Occupational Safety and Health (NIOSH) conducted a monitoring field study to optimize the rib control plan in a room-and-pillar coal mine. The study mine is located in the C
Jul 28, 2020
-
The Price Is Right?Planning Large Water Tunnel Contracts In New YorkBy Christian Maguire
Tunnel contracts in New York have in recent years had few bidders with the bids received being much higher than anticipated. Since 9/11, security has become a key issue in planning key infrastructure
-
Hydrocyclone Modelling: Large Eddy Simulation CFD ApproachBy Jose A. Delgadillo
The hydrocyclone problem has been a challenging task for the last 30 years. In the 80’s and 90’s Computational Fluid Dynamics solution to this problem began to appear. These were unsuccessful due to o
Jan 1, 2005
-
Cuprex – new chloride-based hydrometallurgy to recover copper from sulfide oresBy Enrique Hermana, Raymond F. Dalton, Raymond Price, Barry Hoffman
Introduction Chloride leaching of sulfidic ores has been known about for 100 years. It is recognized as a highly efficient process to produce concentrated leach solutions. Despite this, chloride leac
Jan 1, 1988
-
Dust Control Considerations For Deep-Cut Faces When Using Exhaust Ventilation and a Flooded-Bed Scrubber - Preprint 97-48By R. A. Jankowski
The U.S. Bureau of Mines (USBM) conducted a series of laboratory tests to investigate the effectiveness of using a flooded-bed scrubber with exhaust ventilation in deep-cut faces of up to 12.2 m in le
Feb 24, 1997
-
Development Of A Methodology That Integrates Environmental And Social Variables In The Investment Decision Process For Mining ProjectsBy J. A. Botín
In modern mining, the core of mine planning and design is the block model, a simplified representation wherein the ore deposit is divided in a number of virtual rock cubes, each characterized by techn
Feb 27, 2013
-
Underground Subway Construction CostsBy Harry Sutcliffe
THE PROBLEM Two and a half years have gone by since the December, 1976 Civil Engineering article on subway costs caused such a furore. What has happened in this interval? Even after discounting
Jan 1, 1979
-
Design of the Brightwater Conveyance TunnelsBy Leon Maday, Dan L. Pecha, Jeremy Johnson, Daniel N. Adams
The Brightwater conveyance system includes 26 km of tunnels, a 130 mgd pump station, 2 km of micro tunnels, and a 2.4 km outfall. The tunnels extend from Woodinville to Puget Sound through varying soi
Jan 1, 2005
-
Strategic Alignment: A Mining Industry ChallengeBy Russell Barr
Strategic alignment throughout a mining organization is critical to effective strategic execution and good business performance. The alignment of strategic goals and objectives in the different operat
Jan 1, 2008
-
Dewatering, Interpretation Of Landform, And Installation Of Steel Arches For Reinforcement Of Tunnel SectionBy D. J. Gilbert
As a preventive action, the geotechnical department at the mine analyzed the original topography overlying a conveyor tunnel at the mine. Several dewatering drains were installed to intercept water co
Jan 1, 2011
-
Chambers Creek Interceptor Sewer TunnelBy J. Jeffrey Wagner, Michael J. Bailey, Peter M. Douglass
The Chambers Creek Interceptor Sewer Tunnel project consisted of 2-1/2 miles (4 kilometres) of nominal 9-foot (2.7-metre) O.D. tunnel driven through predominantly glacially overridden soils. Mole-Coll
Jan 1, 1985
-
Snow Tunneling at the South PoleBy John H. Wright
The United States Antarctic Program (USAP), through its principal support contractor Raytheon Polar Services Co. (RPSC), has recently completed a three-year project comprising nearly 936 m (3,071 ft)
Jan 1, 2002
-
Environmental Evaluation of Mining SystemsBy P. Schmieder
"The close vicinity of mining companies to other sites that are used for commercial and residential purposes or to areas under conservation as well as the fact that the people become more and more sen
Jan 1, 2005
-
The Deep Underground Science And Engineering Laboratory And The Construction Of Physics MegacavernsBy C. Laughton
The Deep Underground Science and Engineering Laboratory (DUSEL) is to be constructed at the defunct Homestake Mine, in South Dakota. As a cornerstone of DUSEL?s research program, it is intended to con
-
Hoisting Systems (a4900c29-13ab-4c51-a9d4-095a976b1923)By Christopher J. Bise
INTRODUCTION The transportation of men, supplies, and mined material from an underground operation is the connecting link between the mine plant and the surface plant. Unless the mine is accessed by
Jan 1, 1986
-
Super Cycle: Past, Present And FutureBy Douglas B. Silver
Traditional cycle theory would postulate that if you have a supply shortage relative to demand, the price will increase because buyers will incrementally increase the price they are willing to pay to
Jan 1, 2008