Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel Project

    By Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal

    Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som

    Jan 1, 2001

  • SME
    Expert Control Of A High Altitude Crushing Plant

    By M. Valdebenito, J. Rajala

    An OCS Expert control system was implemented by Svedala Cisa at the Minera Maricunga Refugio Crush-Leach Operation near Copiapo, Chile. The purpose of the Expert system was to maximize production thr

    Jan 1, 2002

  • SME
    Real-time assisted driving in openpit mining operations using Google Earth

    By Antonio Nieto

    According to the analysis of surface powered haulage accidents involving off-highway haul trucks in openpit mining, the U.S. Mine Safety and Health Administration (MSHA), reported 1,300 fatal accident

    Jan 2, 2010

  • SME
    Advances In The Practical Implementation Of Indicator Geostatistics

    By Clayton V. Deutsch

    Indicator Kriging (IK) is being commonly applied to mineral resource assessment problems. More recently, indicator simulation has also been used for sensitivity analysis and difficult change of suppor

    Jan 1, 1992

  • SME
    Recent Advances In Coal Spiral Development – Preprint 97-82

    By W. S. Weldon, R. M. G. Machunter

    The use of spiral separators for the beneficiation of fine coal typically in the size range - 2+0.lmm is now well established process technology. Developments during the mid 1980's resulted in th

    Feb 24, 1997

  • SME
    Sinking A Freeze Shaft With Installation Of A Water-Tight, Flexible Lining

    By Klaus Stoss, Bernd Braun

    The sinking and lining of a large mine shaft with 8.0 m i.d. and 1,133 m total depth is described in detail. The ground freezing method was applied to safely sink the shaft through unstable, waterbear

    Jan 1, 1983

  • SME
    Rail and Belt Haulage Systems

    By Christopher J. Bise

    INTRODUCTION The principal means for transporting men, supplies, and mined material in an underground or surface mine are rail systems, conveyor belt systems, or a combination of the two. Typicall

    Jan 1, 1986

  • SME
    Geotechnical Conditions and TBM Selection for the Bay Tunnel

    By Luke Erickson

    San Francisco Public Utilities Commission is planning to replace 5 miles of pipeline under San Francisco Bay. The tunnel will be constructed using an Earth Pressure Balance (EPB) TBM and will be the f

    Jan 1, 2008

  • SME
    Excess Spoil Minimization And Fill Stability

    By M. Superfesky, P. Michael

    Introduction The US Office of Surface Mining (OSM) is proposing changes to the Code of Federal Regulations in the interest of minimizing the adverse effects of excess-spoil-fill construction on the

    Jan 1, 2007

  • SME
    Underground Caving Shield Change Outs At Us Steel’s Oak Grove Mine

    By B. Weyerman

    U. S. Steel's Oak Grove Mine experienced several top hinge failures on their caving shields. It was determined that all the caving shields needed to be replaced with new caving shields before mor

    Jan 1, 2001

  • SME
    Influence of hydrodynamics on preflotation process in flotation machine Mining, Metallurgy and Exploration

    By W. Pawlos, A. Bakalarz, M. Duchnowska

    This paper presents the results of an investigation into the influence of hydrodynamics on a preflotation process for the copper sulfide ore from the Fore-Sudetic Monocline deposits in Poland in a flo

  • SME
    Practical Applications For The Silicon Drift X-Ray Detector In SEM-Platformed Image Analysis: The Bruker-MLA In Practice

    Preface The intention of this paper is to provide the reader with knowledge gained here at Memorial University regarding the practical use of the Bruker SDD x-ray detector for applications in image a

    Jan 1, 2007

  • SME
    Design and Construction Performance of a Large Diameter Tunnel Constructed in Soft-Ground by the Stacked Drift Method

    By Paul H. Madsen, Victor S. Romero

    The Tren Urbano project in Puerto Rico includes a 19 m diameter tunnel constructed by the stacked drift method, which involves installation of a pre-supported concrete arch using multiple tunnels. Geo

    Jan 1, 2001

  • SME
    Tellurium Resources In New Mexico

    Tellurium (Te) is one of the least abundant elements in the crust and tends to form minerals associated with copper, lead, zinc and iron sulfide deposits. Today, most tellurium production comes from t

    Feb 27, 2013

  • SME
    Optimization Of Shovel Dipper-Formation Interactions In Excavation

    By S. Frimpong

    Shovel excavation constitutes a significant component of production costs in any surface mining operation. This makes shovel loading an important cost center that needs to be improved to lower product

    Jan 1, 2011

  • SME
    The Application Of Geotechnical Monitoring To Stability Evaluation And Mine Design

    By H. Maleki

    In this paper, long-term measurements in five underground mines are presented to demonstrate how these measurements can be applied to stability evaluations and design of underground excavations. These

    Jan 1, 2002

  • SME
    Empire Pebble Crushing Circuit, Going Back To Basics, Is The Crusher Crushing?

    By H. Walqui

    This paper describes operating gains resulting from standardizing operating and maintenance practices to improve the performance of the pebble crushing circuit at he Empire Concentrator. Past efforts

    Feb 27, 2013

  • SME
    GIBE II Tunnel Project?Ethiopia: 40 Bars Of Mud Acting On The TBM ?Special Designs And Measures Implemented To Face One Of The Most Difficult Events In The History Of Tunneling?

    By Antonio De Biase

    In October 2006, a 7m Double Shield TBM, boring through very poor volcanic formations, was pushed back by fluid mud, which presence had not been detected during previous field investigations, due to t

  • SME
    Strata Control

    By Christopher J. Bise

    INTRODUCTION Perhaps no other area reflects the art as well as the science of mining-engineering design quite as obviously as strata control. This is due to the fact that the design of mining stru

    Jan 1, 1986

  • SME
    Mining 4.0—the Impact of New Technology from a Work Place Perspective Mining, Metallurgy and Exploration (326a66bb-6516-4f47-8d9f-11f095fb3603)

    By Joel Lööw, Jan Johansson, Lena Abrahamsson

    Industry 4.0 offers new possibilities to combine increased productivity with stimulating workplaces in a good work environment. Used correctly, digitalization can create attractive jobs in safe contro