Two Tunnels in Totally Different Geological Formations Driven by the Same 7M Double-Shield TBM with an Extremely Thin-Walled Monoshell Honeycomb Segmental Lining System
By Wolfgang Guetter, Wolfgang Weber
The upgrading project for two hydropower plants in Slovenia, Europe, requires two new pressure tunnels: Plave II (5.9 km Flysch) and Doblar II (3.6 km Limestone). It is the worldwide largest applicati
Jan 1, 2001
-
Paragenesis And Metal Associations In Interior Alaska Gold Deposits: An Example From The Fairbanks District (78a5358a-5cda-49ae-b93d-ba8558df1a55)
By K. Severin, B. Flanigan, P. Marion
“Plutonic-related” gold deposits in Interior and SW Alaska (Tintina Gold Belt) vary significantly in size, grade, vein/deposit morphology, depth of emplacement, distance from causative pluton and meta
Jan 1, 2000
-
An Integrated Approach to Assess Acid Generation and Metal Release from Sulphide Tailings Using Oxygen Consumption Measurements, Porewater Chemistry and Geochemical Modeling
By Michael J. Rinker, P. A. Tibble, M. Wiseman, R. V. Nicholson
Tailings, from an active copper-zinc operation, containing about 10% sulphur were investigated to assess the onset of acid production and potential lime requirements for treatment of drainage. Oxygen
Jan 1, 2000
-
BWARI Tunneling Underway
By Thomas L. Richardson, David R. Chapman, Gary W. Gilbert
The two contracts of the Big Walnut Augmentation/Rickenbacker Interceptor(BWARI) sewer project for the City of Columbus, Ohio total nearly 35,000 feet of 14and 12-foot diameter tunnel. EPB TBMs will i
Jan 1, 2005
-
Construction Of The MCUA Tunnel And Force Mains Under The Raritan River, New Jersey: A Case History
By Bob Rautenberg
The Construction of Tunnel and Edison Force Mains contract involves the installation of two new force mains to provide a redundant means for sewage conveyance from Middlesex County Utility Authority?s
-
Upgrading Low Rank Coal Using The Koppelman Series C Process – Preprint 97-143
By N. Merriam
This report describes Koppelman's work to develop the K-Fuel® Series C Process used to dry and stabilize Powder River Basin coal. It also contains summaries of the results of bench-scale and pilo
Feb 24, 1997
-
SIU-Sim: A Novel Coal Preparation Plant Simulator
Coal preparation plant simulators are used to study flowsheet alternatives and determine product quality and quantity that can be produced under various operating conditions for individual circuits. S
Jan 1, 2008
-
Sandvik Drills Offer High Productivity, Flexibility And Improved Safety
The Sandvik DE710 diamond core drill has become one of the most popular exploration drills available. It is operated on exploration and mining projects in locations around the world. The compact nat
Jan 1, 2009
-
Recovery Of Bitumen By Implementation Of Column Flotation In The Athabasca Oil Sands
Column flotation has been successfully implemented on a production scale in the Athabasca oil sands. In this application, bitumen is recovered and mineral matter is simultaneously rejected from a midd
Jan 1, 2012
-
Production Scheduling At LKAB’s Kiruna Mine Using Mixed Integer Programming
By M. Kuchta, A. Newman
LKAB’s Kiruna Mine, located in northern Sweden, produces about 24 Mton of iron ore yearly using sublevel caving. For efficiency, the mine must deliver planned quantities of three ore products. We use
Jan 1, 2002
-
Electric Rope Shovel Monitoring
By J. Hansen
This paper has been written for presentation during the Open Pit Mining Session at the SME Annual Meeting and Exhibit, Denver, Colorado, February 26 to 28, 2001. The paper addresses the application o
Jan 1, 2001
-
Final Tunnel Liner At The Mill Creek 3 Project
By M. Schafer
The 6-m- (20-ft-) diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT3) has been completed. This article summarizes aspects of liner design and ad-dresses the construction a
Jan 1, 2008
-
Batu Hijau: From Discovery to Production
By Thomas J. DeMull
Development of the Batu Hijau copper project was completed in the fourth quarter of 1999 with the formal handover and start-up of ore processing facilities. The project began in August 1996 when the
Jan 1, 2002
-
Semi-Autogenous Grinding (SAG) Mill Liner Design And Development
By D. Royston
SAG mill liner development draws primarily on practical experience from SAG milling operations supported by computer-based modeling of charge motion in SAG mills and on established good design practic
Jan 1, 2007
-
Carbon Black Production From Waste Tires
By B. P. Faulkner, M. Weinecke
Svedala started a development program in 1997 to develop a process to convert waste tires into valuable commodities. A review of numerous approaches revealed short-comings in the various approaches
Jan 1, 2001
-
73rd Street TARP Relocation McCook Cup Reservoir: Contract 97-156-2H
By Brent Duncan, Doug Harding, Bob Stier
The 73rd Street Tunnel Project is part of “The Tunnel and Reservoir Plan” (TARP)also known as the Deep Tunnel Project, and is located in the Village of Bedford Park, County of McCook, State of Illinoi
Jan 1, 2003
-
Can The Toxicity Of Asbestos Be Reduced? - Preprint 09-124
By F. Habashi
Asbestos, an extremely useful natural resource, has been studied extensively mineralogically and for industrial application. Its extraction from ores has been greatly improved with respect to safety i
Jan 1, 2009
-
New Bulkhead Design For Controlling Increased Hydrostatic And Dynamic Hydraulic Pressures
By George Watson, Gu Quanzhong, S. Gerard Sawyer
Bulkheads, also known as hydraulic seals, are used to seal abandoned workings and protect adjacent active mines from explosion and control unwanted inflows of water from poorly sealed shafts, water-be
Jan 1, 2005
-
Tunnel Boring Machine Development
By Martin Herrenknecht
Tunnel boring machine (TBM) development continues to take on not only larger diameters, but also more difficult ground conditions. Ground conditions consisting of unstable faces with water pressures u
Jan 1, 2008
-
Selenium And Arsenic Removal From Mining Wastewaters
By Phil Pennington, D. Jack Adams
Mining and processing of minerals, metals, and fossil fuels can release selenium and arsenic into wastewaters. Both selenium and arsenic are difficult to remove to levels that meet current drinking w
Jan 1, 2005