    Two Tunnels in Totally Different Geological Formations Driven by the Same 7M Double-Shield TBM with an Extremely Thin-Walled Monoshell Honeycomb Segmental Lining System

    By Wolfgang Guetter, Wolfgang Weber

    The upgrading project for two hydropower plants in Slovenia, Europe, requires two new pressure tunnels: Plave II (5.9 km Flysch) and Doblar II (3.6 km Limestone). It is the worldwide largest applicati

    Jan 1, 2001

  • SME
    Paragenesis And Metal Associations In Interior Alaska Gold Deposits: An Example From The Fairbanks District (78a5358a-5cda-49ae-b93d-ba8558df1a55)

    By K. Severin, B. Flanigan, P. Marion

    “Plutonic-related” gold deposits in Interior and SW Alaska (Tintina Gold Belt) vary significantly in size, grade, vein/deposit morphology, depth of emplacement, distance from causative pluton and meta

    Jan 1, 2000

  • SME
    An Integrated Approach to Assess Acid Generation and Metal Release from Sulphide Tailings Using Oxygen Consumption Measurements, Porewater Chemistry and Geochemical Modeling

    By Michael J. Rinker, P. A. Tibble, M. Wiseman, R. V. Nicholson

    Tailings, from an active copper-zinc operation, containing about 10% sulphur were investigated to assess the onset of acid production and potential lime requirements for treatment of drainage. Oxygen

    Jan 1, 2000

  • SME
    BWARI Tunneling Underway

    By Thomas L. Richardson, David R. Chapman, Gary W. Gilbert

    The two contracts of the Big Walnut Augmentation/Rickenbacker Interceptor(BWARI) sewer project for the City of Columbus, Ohio total nearly 35,000 feet of 14and 12-foot diameter tunnel. EPB TBMs will i

    Jan 1, 2005

  • SME
    Construction Of The MCUA Tunnel And Force Mains Under The Raritan River, New Jersey: A Case History

    By Bob Rautenberg

    The Construction of Tunnel and Edison Force Mains contract involves the installation of two new force mains to provide a redundant means for sewage conveyance from Middlesex County Utility Authority?s

  • SME
    Upgrading Low Rank Coal Using The Koppelman Series C Process – Preprint 97-143

    By N. Merriam

    This report describes Koppelman's work to develop the K-Fuel® Series C Process used to dry and stabilize Powder River Basin coal. It also contains summaries of the results of bench-scale and pilo

    Feb 24, 1997

  • SME
    SIU-Sim: A Novel Coal Preparation Plant Simulator

    Coal preparation plant simulators are used to study flowsheet alternatives and determine product quality and quantity that can be produced under various operating conditions for individual circuits. S

    Jan 1, 2008

  • SME
    Sandvik Drills Offer High Productivity, Flexibility And Improved Safety

    The Sandvik DE710 diamond core drill has become one of the most popular exploration drills available. It is operated on exploration and mining projects in locations around the world. The compact nat

    Jan 1, 2009

  • SME
    Recovery Of Bitumen By Implementation Of Column Flotation In The Athabasca Oil Sands

    Column flotation has been successfully implemented on a production scale in the Athabasca oil sands. In this application, bitumen is recovered and mineral matter is simultaneously rejected from a midd

    Jan 1, 2012

  • SME
    Production Scheduling At LKAB’s Kiruna Mine Using Mixed Integer Programming

    By M. Kuchta, A. Newman

    LKAB’s Kiruna Mine, located in northern Sweden, produces about 24 Mton of iron ore yearly using sublevel caving. For efficiency, the mine must deliver planned quantities of three ore products. We use

    Jan 1, 2002

  • SME
    Electric Rope Shovel Monitoring

    By J. Hansen

    This paper has been written for presentation during the Open Pit Mining Session at the SME Annual Meeting and Exhibit, Denver, Colorado, February 26 to 28, 2001. The paper addresses the application o

    Jan 1, 2001

  • SME
    Final Tunnel Liner At The Mill Creek 3 Project

    By M. Schafer

    The 6-m- (20-ft-) diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT3) has been completed. This article summarizes aspects of liner design and ad-dresses the construction a

    Jan 1, 2008

  • SME
    Batu Hijau: From Discovery to Production

    By Thomas J. DeMull

    Development of the Batu Hijau copper project was completed in the fourth quarter of 1999 with the formal handover and start-up of ore processing facilities. The project began in August 1996 when the

    Jan 1, 2002

  • SME
    Semi-Autogenous Grinding (SAG) Mill Liner Design And Development

    By D. Royston

    SAG mill liner development draws primarily on practical experience from SAG milling operations supported by computer-based modeling of charge motion in SAG mills and on established good design practic

    Jan 1, 2007

  • SME
    Carbon Black Production From Waste Tires

    By B. P. Faulkner, M. Weinecke

    Svedala started a development program in 1997 to develop a process to convert waste tires into valuable commodities. A review of numerous approaches revealed short-comings in the various approaches

    Jan 1, 2001

  • SME
    73rd Street TARP Relocation McCook Cup Reservoir: Contract 97-156-2H

    By Brent Duncan, Doug Harding, Bob Stier

    The 73rd Street Tunnel Project is part of “The Tunnel and Reservoir Plan” (TARP)also known as the Deep Tunnel Project, and is located in the Village of Bedford Park, County of McCook, State of Illinoi

    Jan 1, 2003

  • SME
    Can The Toxicity Of Asbestos Be Reduced? - Preprint 09-124

    By F. Habashi

    Asbestos, an extremely useful natural resource, has been studied extensively mineralogically and for industrial application. Its extraction from ores has been greatly improved with respect to safety i

    Jan 1, 2009

  • SME
    New Bulkhead Design For Controlling Increased Hydrostatic And Dynamic Hydraulic Pressures

    By George Watson, Gu Quanzhong, S. Gerard Sawyer

    Bulkheads, also known as hydraulic seals, are used to seal abandoned workings and protect adjacent active mines from explosion and control unwanted inflows of water from poorly sealed shafts, water-be

    Jan 1, 2005

  • SME
    Tunnel Boring Machine Development

    By Martin Herrenknecht

    Tunnel boring machine (TBM) development continues to take on not only larger diameters, but also more difficult ground conditions. Ground conditions consisting of unstable faces with water pressures u

    Jan 1, 2008

  • SME
    Selenium And Arsenic Removal From Mining Wastewaters

    By Phil Pennington, D. Jack Adams

    Mining and processing of minerals, metals, and fossil fuels can release selenium and arsenic into wastewaters. Both selenium and arsenic are difficult to remove to levels that meet current drinking w

    Jan 1, 2005