Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Improving Power Plant Performance And Reducing Emissions Through The Use Of Pneumatic Dry Cleaning For Low Rank Coal
By R. J. Snoby, J. K. Alderman
Although once fairly common as a method of coal preparation in the United States, dry cleaning has virtually disappeared. Low-rank coals used for power generation in the western U.S. are suited for dr
Jan 1, 2001
-
A Case History Of Aggregate Resource Development On Allotted Indian Lands
By D. R. Hack
Increased consumption of concrete in the Pacific Northwest has pushed aggregate resource development pressure from urban areas west of the Cascade Range to rural areas east of the Cascades. Some recen
Jan 1, 2002
-
Proactive Interburden Fracturing Using Underground Inseam Drilling with Validation Monitoring
A series of gas inrush events occurred during development at Grosvenor mine resulting in exposure to elevated levels of methane at the production face. A total of 22 gas inrush events occurred releasi
Jan 7, 2020
-
Roof Monitoring Helps Prevent Injuries in Stone Mines
By A. T. Iannacchione
From 1990 to 1996, 16 states reported 92 injuries from falls of roof, rib or face in the more than 90 underground stone mines in the United States (Fig.1). Missouri, Pennsylvania and Kentucky account
Jan 1, 2000
-
Parbati Hydroelectric Project Stage II, India—Two Inclined Pressure Shafts with a Honeycomb Segmental Lining Driven by a 5m Hard Rock Double Shield TBM
By Wolfgang Gütter
India is targeting to boost its electrical capacity from 100 GW to 200 GW within the next 10 years. The National Hydroelectric Power Corporation (NHPC) has decided in2001 to take execution of the 800
Jan 1, 2005
-
The Athabasca Tar Sands - Developments To Date, And The Outlook For The Future ? Introduction
By L. B. McConville
The general term "tar sand" has been used to describe sand containing varying amounts of dense, viscous petroleum. Deposits of tar sands have been found throughout the world, often in the same geograp
Jan 1, 1974
-
Dewatering Of Fine-Particle Slurries Using A Compound-Beach Decanter With Cake-Flow Control (SME Annual Meeting Feb. 26-28, Denver, Colorado)
By A. H. Shapiro
A decanter centrifuge of novel design was developed for the dewatering of fine-solids slurries having micron-range particles that form paste-like, flowable, hard-to-dewater cakes. The design combines
Jan 1, 2001
-
Technology News - GE Supplies Electrical Systems for Bucyrus Draglines
GE Industrial Systems has received a multimillion dollar contract from Bucyrus International to supply complete electrical systems for three new draglines. These machines will be installed at Coal Ind
Jan 1, 2000
-
Construction Aggregate Properties of the Sombrerito Formation, Dominican Republic
By S. J. Stokowski
Abstract An extensive drilling and laboratory testing program indicates that a construction aggregate resource is present within the Oligocene Sombrerito Formation limestone, southwestern Dominican Re
Jan 1, 1991
-
IH-635 (LBJ Freeway) Corridor Section 4-West Traffic Tunnels
By Matthew E. MacGregor, Hugh T. Kelly
I.H. 635 (LBJ Freeway) was constructed as a loop freeway around the city of Dallas in the late 1960s and early 1970s with a design capacity of 160,000 vehicles per day (vpd). Today’s facility is carry
Jan 1, 2005
-
High Performance Tunnel Boring Machine for Queens Water Tunnel, No. 3:A Design and Case History
By Joseph J. Diehl, Brian B. Khalighi
This paper discusses the Queens Water Tunnel, No. 3, Stage 2, being driven by a new Robbins High Performance (HP) Tunnel Boring Machine (TBM).The paper is divided into four sections. In the INTRODUCTI
Jan 1, 1997
-
Electrical Default Detection on Downed DC Trolley Lines – Preprint 97-38
By J. S. Peterson, G. P. Cole
The National Institute for Occupational Safety and Health (NIOSH), Pittsburgh Research Center (PRC), has conducted research to improve electrical fault detection on coal mine direct current (dc) troll
Feb 24, 1997
-
Planning to meet the required DPM concentration levels in underground mines ? a calibration model
By k. Osei-Boakye
This paper presents the calibration of a real-time aerosol monitor, the TSI DustTrak?, to the NIOSH 5040 method being used by the Mine Safety and Health Administration (MSHA) for compliance enforcemen
Jan 1, 2009
-
Second Avenue Subway—Tunneling Beneath Manhattan
By Geoffrey Fosbrook, Donald Phillips, Anil Parikh
The Second Avenue Subway is a $16.8 billion project planned by the Metropolitan Transportation Authority (MTA) in New York City. It will reduce overcrowding and delays on the Lexington Avenue Line, im
Jan 1, 2005
-
Preliminary results of physical, geochemical, and sediment characteristics in the Benthic environmental Impact experiment Site (BIS) of Korea
By Kiseong Hyeong, Young-Tak Ko, Gee Soo Kong
"The benthic environmental impact experiment addresses environmental impacts at a specific site related to deep-sea mineral resource development. For such a purpose, since 2010 we have carried out ess
Sep 1, 2014
-
Grinding Mill Scale-up Problems
By N. Arbiter, C. C. Harris
The economic advantages of large diameter ball mills can be compromised by unexpected capacity limiting conditions. These arise because media rotational flow to ore axial flow ratios, and the number o
Jan 1, 1982
-
The Oxidative Precipitation Of Thallium In Mining Influenced Water
Thallium is an uncommon heavy metal that may be found in concentrations that exceed regulatory limits in mining influenced water associated with processing cadmium, copper, gold, lead, and zinc ores.
Jan 1, 2011
-
Encapsulation Of Limestone Waste In Concrete After Arsenic Removal From Water - Preprint 09-125
By A. D. Davis
Limestone-based technology for arsenic removal from water is an innovative and promising method. The technology offers the potential for low-cost disposal of a stable waste product after arsenic remo
Jan 1, 2009
-
Probable Cost Estimating and Risk Management
By John Reilly
Costs of complex/underground projects have been consistently underestimated and delivery on time and on budget has been problematic. This has been attributed, to inadequate cost estimates and unidenti
Jan 1, 2008
-
Islais Creek Contract E: Tunneling Through Jet Grouted Bay Mud
By D. N. Adams, M. M. Wong, M. J. Robison
Islais Creek Contract E, a transport/storage tunnel in San Francisco, was visited on a fieldtrip during construction by delegates to the 1995 RETC. This paper is a follow-up to that fieldtrip. The p
Jan 1, 1997