Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Field Survey of Rare Earth Element Concentrations in Process Streams Produced by Coal Preparation Plants in the Eastern USA Mining, Metallurgy and ExplorationBy Gerald H. Luttrell, Mohammad Rezaee, Roe-Hoan Yoon, Rick Q. Honaker, Aaron Noble, Abhijit Bhagavatula, Michael J. Kiser
A field study was undertaken to experimentally measure the concentrations of rare earth elements (REEs) contained in the process streams generated by a group of 20 coal preparation plants located in t
-
Cost Engineering - Who Needs It?By A. J. MacKellar
The economic viability of any project is generally assessed on an evaluation of the total capital constructed costs along with operating costs, owner's costs and market conditions. This paper wil
Jan 1, 1975
-
Continuing Method Improvements At The Eagle Mountain Iron Ore Mine Of Kaiser Steel CorporationBy Emmet K. Oslen
Kaiser Steel Corporation, the pioneer steelmaker on the Pacific Coast, was founded by the late Henry J. Kaiser. In 1944 the Company purchased from the Southern Pacific Railroad an iron ore property 20
Jan 1, 1972
-
Bluefield State reestablishes its mining engineering technology program - ME Feature ArticleBy Keith Olson
In the heart of Appalachia, where coal mining has shaped communities and economies for generations, Bluefield State University (BSU) has made a landmark decision to reestablish its mining engineering
Jun 1, 2025
-
The Feasibility Of Hybrid Network And Cfd Modeling For Mine Ventilation ApplicationsThis paper examines the feasibility of combining network modeling and computational fluid dynamics for modeling of underground mine ventilation systems. Both simulation methods have specific advantage
Feb 23, 2014
-
Potential Trace Element Emissions From The Gasification Of Illinois CoalsBy N. F. Sather
Results of comprehensive trace element analyses of samples of Illinois #5 and #6 seam coals and the unquenched ashes obtained from gasification of these coals in a Lurgi reactor are reported and discu
Jan 1, 1976
-
Maintaining The Proper Balance With Computer Aided Gear Train DesignBy John Carr
The tremendous growth in grinding mill size and horsepower during the '70s demanded advancements in gear cutting technology and equipment for the '80s. Computers are used as an aid in the
Jan 1, 1981
-
A Roof Quality Index For Stone Mines Using Borescope LoggingBy John Ellenberger
The National Institute for Occupational Safety and Health (NIOSH) has collected pillar and span data at 34 stone mines in 10 states to develop pillar and roof span design guidelines for underground st
Jan 1, 2009
-
Evaluation of Alternative Chain Pillar Designs in a Deep Longwall Mine - SME Annual Meeting 2025By Yuting Xue, Todd Minoski, Daniel Su, Mark Van Dyke, Mark Mazzella, Steve Hicks, Zoheir Khademian, Nicole Evanek
Design of chain pillars in a longwall mine setting is one of the main engineering controls on the global and local stability of the mine. Challenges with roof instabilities, floor heaves, and pillar f
Feb 1, 2025
-
The Effect Of Grinding Media On Flotation Of GalenaBy Mary E. Learmont
Grinding with steel media adversely affects the flotation response of galena. Electrochemical measurements, flotation tests, and AES, XPS, and STEM examinations were employed to identify interactions
Jan 1, 1984
-
On Improving Sulfides Flotation: The Use of a Phosphate Industry Flotation Depressant, and Rheology to Enhance Collectors Performance - SME Annual Meeting 2026By Francisco J. Sotillo
Using new ecological-natural-organic depressant for gangue and pyrite with antibacterial properties (control of acid mine drainage) with new improved xanthate collectors using rheology additive not ch
Feb 22, 2026
-
Performance Of Modern Spirals Cleaning Fine CoalBy E. G. Kelly
This paper describes the performance of a modern compound trough profile spiral that is optimized for fine coal cleaning. Reduced performance (Tromp) curves are presented to compare these new spirals
Jan 1, 1984
-
Analysis Of Retreat Mining Pillar StabilityBy Frank E. Chase
Preventing pillar squeezes, massive pillar collapses, and bumps is critical to the safe and efficient recovery of coal during room-and-pillar retreat mining. To help prevent these problems, the U.S. B
Jan 1, 1995
-
Joint Network Modeling And Some Scale Effects In Rock MassesBy P. H. S. W. Kulatilake
The presence of discontinuities strongly affects the mechanical and hydraulic behavior of rock masses. Joint geometry networks play a vital role in civil, mining, and petroleum engineering projects as
Jan 1, 1992
-
Investigation of ventilation problems of a small coal mine compounded by a massive roof fail - SME Transactions 2010By Yi Luo
A massive roof fall occurred in a small room-and-pillar coal mine. The roof falls occurred under a barrier pillar in a closed coal mine located a short distance above the active mine. The extensive fr
Jan 1, 2010
-
Unexpected Post-Excavation Damage to a 28"-Thick Segment Lining - Failure Mechanism and Rehabilitation MeasuresBy Jens Classen, Martino Gatti
"GENERAL PROJECT DATAThe Sparvo Tunnel is part of the “Variante di Valico” project, a new 65km (40mi) highway link between Bologna and Florence, designed to renew the existing A1 route which connects
Jan 1, 2016
-
Computational fluid dynamic modeling of a medium-sized surface mine blasthole drill shroudBy W. R. Reed, J. P. Rider
"The Pittsburgh Mining Research Division of the U.S. National Institute for Occupational Safety and Health (NIOSH) recently developed a series of models using computational fluid dynamics (CFD) to stu
Nov 1, 2016
-
A New Seismic Probe For Coal Seam Hazard DetectionBy W. R. Peters
An experimental hole-to-hole seismic probe system has been developed for use in coal measure geology as a means of determining the structural conditions of coal seams. The source probe produces a 500-
Jan 1, 1985
-
SO2 Abatement In A 400 Kw Pilot-Scale Combustor -- Limestone Injection TestsBy G. H. Lewis
This work was completed in a 440 KW pilot-scale combustor in preparation for a 50,000 Kg/hr industrial steam boiler limestone injection test program. The main objectives of the work were to: (1) ident
Jan 1, 1985
-
Some Consideration On The Dynamics Of Bailing Circuits ? IntroductionBy C. E. Capes
The continuous balling? operation whereby a moist particulate mass is tumbled in a horizontal revolving drum with recirculation of the undersize product can be extremely unstable. Product and recycle
Jan 1, 1975