Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Non-Electric Shock Tube and Optimizer Initiation Systems, Applications and Hookups

    By Tom Treleaven

    This guide presents numerous patterns that provide 8 millisecond separations between initiated charges. The guide is tabulated in seven sections to provide quick reference by number of decks or bunch

    Jan 1, 1997

  • ISEE
    Blast Optimization Through Drilling Information: GBlast®, a Predictive Modeling Software

    By Claudio Lechuga, Carlos Scherpenisse, Juan Rafael Otaiza

    From the analysis of drilling process, Block Model information, drilling pattern data and expected fragmentation targets; GBlast® software optimizes the explosive charge design in order to standardize

    Feb 1, 2020

  • ISEE
    A Practical Approach for Blasters to Determin The Optimal Bench Blasting Conditions

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan

    In the bench blasting, the realisation of an economic, and safe blasting is only possible with a reliable blasting design on condition that considering all sequential activities such as drillingblasti

    Jan 1, 2004

  • ISEE
    Vertical Retreat Mining of Drop Shafts Saves Time and Money on Atlanta’s West End CSO Tunnel Project

    By Adam Stremcha, John MacGregor

    Initial planning called for 3 separate drop shafts and 3 separate vent shafts to be pulled back from the excavated tunnel with a large diameter raise bore machine. With time constraints and the raise

    Jan 1, 2010

  • ISEE
    Inco Limited Upper Blind Slot Raise 8M (25') to 12M (40') Longhole Carbide Drilling (L.C.D.) Method

    By Steven Richardson, E A. Cameron, Reza "Ray" Jambakhsh

    This paper outlines the design and implementation of a method to use Long hole Carbide drilling to blast an "Upper Blind Slot Raise" in the range of 12m (40 ft).

    Jan 1, 1992

  • ISEE
    Presplitting at the Pioneer Wolffdene Quarry

    By Evan Boone, Peter Bellairs

    A technical services visit was conducted to determine the initial parameters to successfully presplit several benches for an input crusher installation at the Wolffdene quarry. The paper details the p

    Jan 1, 1998

  • ISEE
    Journal: 100 Years / As you can see above, the title of these articles includes the words “More or Less.” In this issue I’m going to take advantage of that, and print a few things that I’d never be able to share if I adhered strictly to the “100

    By Robert Hopler

    GEO. M. MOWBRAY’S REFRIGERATOR CAR FOR THE SAFE CONVEYANCE OF EXPLOSIVES. It is a fact well known to all miners who have used nitro-glycerin, or any of its adulterations, commonly known as dynamite, r

    Jan 1, 2011

  • ISEE
    A New Method of Shaft Sinking

    By John Cowin, Dan McCutchen

    Cowin & Company has specialized in underground construction since 1924. This paper reviews the sinking of two shafts in the Alabama coal fields using bulk-loaded explosives. Each shaft is eighteen hun

    Jan 1, 2000

  • ISEE
    Implementation of Track & Trace Solutions in Existing Production Environments

    By Frank Hirthammer

    The paper explains the procedure of implementing Track & Trace solutions for manufacturers of explosives based on customer experiences. By using concrete examples, the process from project start to im

    Feb 1, 2020

  • ISEE
    Tunneling in Thinly Foliated Rockmass Conditions

    By H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen

    Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne

    Feb 1, 2020

  • ISEE
    Case Study: Iterative Design Process of Presplitting in an Underground Overhand Cut and Fill Mine

    By David Porter, Nathan Rouse

    The implementation of presplit blasting has been widely utilized in open pit and underground tunneling. This case study works through the iterative process of developing a heading drill and blast desi

    Feb 6, 2023

  • ISEE
    Fueling Station and Tank Farm Expansion on Taboguilla Island

    By Abraham Lindo

    Taboguilla is a small island located 10 miles outside the Panama Canal Pacific Entrance. In 2002 a fuel distribution facility was installed in order to supply fuel to vessels passing thru the canal. T

    Jan 1, 2011

  • ISEE
    Occidental's Resorts 7 and 8 Blasting Design and Results

    By Thomas E. Ricketts

    Occidental Oil Shale, Inc. constructed two commercial-sized modified in situ (MIS) retorts, Retorts 7 and 8, at its Logan Wash Oil Shale Mine in February and April 1981, respectively. One of the prima

    Jan 1, 1984

  • ISEE
    O'Shaughnessy Dam Hydroelectric Project

    By Alan Hooper, James E. Mischler

    Construction began in 1984 for a 5 megawatt hydroelectric power retrofit at the O'Shaughnessy Dam for the City of Columbus, Ohio. The construction necessitated excavation of limestone bedrock up to 27

    Jan 1, 1986

  • ISEE
    Journal: Vibration and Seismograph Section / Use of GPS and GPS Exchange Format Files in Pennsylvania

    By Rick Lamkie

    When investigating citizen complaints about blast vibration and airblast, it is important to be able to establish the spatial relationships between blasts, blasting seismographs monitoring the events,

    Jan 1, 2008

  • ISEE
    Simulations of Full-scale Bench Blasts using FDM (Fracture Density Model)

    By Dale S. Preece

    A new three dimensional (3D) mechanistic model of fragmentation, called the Fracture Density Model (FDM) is used to simulate full-scale bench blasts at the Bararp dimensional stone quarry in Sweden. T

    Feb 1, 2020

  • ISEE
    Mitigation Research of Covering Marine-bottom Ordnance

    By Gregory Hempen, Thomas Keevin, Russell Wilcox, William Wild

    The Department of Defense Strategic Environmental Research & Development Program (SERDP) awarded funding for evaluation of procedures to mitigate peak pressures and energy flux density in the water co

    Jan 1, 2011

  • ISEE
    Structure Responses to a Confined Opening Cut Blast, Sumterville, FL

    By Jeff Senules, Oana Meins, Catherine Aimone-Martin, Scott Lanker, Brent Meins

    Global wall strains from 4 to 77 micro-strains were measured at three structures adjacent to a highly-confined Florida quarry blast when PPV amplitudes ranged up to 6.05 in/s. Increasing the peak zero

    Feb 1, 2020

  • ISEE
    The Effects of Various Wet-Hole Loading Methods on Powder Factor

    By Neal Lee

    Often the effects of wet boreholes are not taken into consideration when designing a blasting program to exhibit a certain amount of explosive energy per unit of rock such as design by powder factor,

    Jan 1, 2011

  • ISEE
    Optimization of Ring Blast Design for Ore Dilution Control in Underground Hard Rock Mine Using Numerical Simulation

    By A. Vishwakarma, V. Himanshu, K. Dey

    Underground mining is the most feasible method after extinction of shallow depth ore deposits. Longhole stoping method is the most technically advanced method for the faster excavation. In this method

    Jan 1, 2024