Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Sustainable Cement for Greener Foundations
By Greg Halsted, Joshua Gilman
Today's civil and geotechnical engineers play an important role in helping to achieve sustainable infrastructure. To address environmental sustainability and climate change caused by green- house gas
Jan 1, 2023
-
Pile Set-Up to Optimize High-Rise Bridge Design
By Charles Winter
The Ohio Department of Transpor- tation's (ODOT's) $228 million 1-480 Valley View Bridge project was needed to keep traffic flowing on one of the state's busiest freeway segments. Deterioration from a
May 1, 2022
-
Underpinning System Based On Preloaded Micropiling For Construction Of Additional Underground Floors
By Wolfram Groh
New underground floors comprising the complete footprint area of the building structure, were constructed under an existing building in sand, located in the Verdun district of Beirut / Lebanon. The wo
Jan 1, 2002
-
Research on Strength Characteristics of Cement-Treated Soils at Construction Joints
By Naoyuki Hanawa, Takeo Asanuma, Tatsuo Nagatsu, Sachihiko Tokunaga, Daisuke Nakagawa, Yoshiyuki Morikawa, Kazuhiko Ueno
"In the cement deep mixing (CDM) method, one approach to joint construction is creating a surface-contact joint. In this study, an unconsolidated-undrained triaxial compression test was performed on c
Jan 1, 2015
-
Case History: Comparison of CSL Results to Physical Observations
By David S. Graham, Paul J. Axtell
Crosshole Sonic Logging (CSL) non-destructive integrity testing identified anomalous readings near the base of a 6.5-foot diameter drilled shaft rock socket. The anomaly was confirmed to be a defect b
Jan 1, 2019
-
On The Axial Load-Bearing Behavior Of Vibrated And Impact Driven Full Displacement Piles
By Bastian Hoffmann, Christian Moormann
The paper presents results of an experimental study on the axial load bearing behavior of vibratory driven full displacement piles in comparison with impact driven and cyclic quasi-static installed pi
May 1, 2022
-
Physical Modeling and Development of Design Criteria for Maintainable Drains for Earth Retention Systems
By J. Erik Loehr, Andrew Z. Boeckmann
"Poor drainage is a common cause of poor performance of earth retention systems, resulting in burdensome serviceability problems that can progress to outright failure of the retention system if not ad
Jan 1, 2016
-
Designed, Load Tested, Installed, And Integrity Tested ACIP Piles At Lovers' Key Site In Southwest Florida
By Gregory A. Stephan
A case history of design, prediction, instrumented static load tests on probe piles, installation monitoring, and integrity testing of production piles is presented. Based upon project-specific subsoi
Jan 1, 1999
-
Underwater Pile Hammers
By Douglas L. Scaggs
Driving piles in under water applications has become more common place over the past twenty years. Where only a water depth reachable with a follower or dewatered cofferdam was the rule in the past,
Jan 1, 2013
-
Cofferdam Solution for Steeply Sloping Rock Using Flat-Sheet Piles
By Norm Kirk, Robert Bittner
"The addition of a new powerhouse at the existing Tulloch Hydroelectric site on the Stanislaus River in the western foothills of the Sierras Nevada Mountains of central California required a deep exca
Jan 1, 2017
-
Shaftcam: A Practical and Cost Effective Solution to Drilled/Bored Pile Hole Inspection
By Sastry Putcha, Santosh Mummaneni, Avasarala Swamy
"Inspection of bored pile hole bottom prior to placement of concrete is one of the most crucial element of foundation design and construction, especially for end bearing piles. Pile hole bottoms that
Jan 1, 1900
-
Rehabilitation of the Kölnbrein Dam / Austria
By Frank Haehnig, Kurt Kogler
"With a height of 200 m, a crown width of 626 m and a concrete volume of 1.6 million m³, the Kölnbrein Dam in the upper Malta valley in Carinthia / Austria is the largest concrete dam in Austria. Boas
Jan 1, 2016
-
Environmentally Friendly Geothermal Piles At Keble College, Oxford, UK
By Tony P. Suckling
This paper presents a case study of a piling contract undertaken at Keble College in Oxford in the year 2001. Unusually, and for the first time in the United Kingdom, piles were successfully construct
Jan 1, 2002
-
Errata (5268ac87-18a9-458e-b334-4f72060324e3)
Volume 1 pages 665-671 Title should read as Dynamic pile testing of H-piles at HDB sites J.Wei, Y. S. Heng, C. S. Lok, M. K.Chong Housing and Development Board, Singapore 'tons'
Jan 1, 1994
-
Design for Installation of Suction Piles in Sand Deposits for Mooring of Floating Offshore Structures
By Chul Soo Park, Juhyung Lee, Duhyun Baek
"In this study the preliminary design of suction pile as the supporting system of the concrete floating structures was performed at the offshore pilot project area in Korea. The suction pile of the fl
Jan 1, 2017
-
Multiple Foundation Types For Bridges Over The Same Coal Mine
By Kenneth M. Berrry
A unique situation has developed at an abandoned coal mine in St. Clair County, Illinois. Subsidence features have been observed at the ground surface over the mine including settlement of a pair of b
Jan 1, 2001
-
Investigations on the Distress to the Pavements/PQC Slab around Monorail Piers, Wadala, Mumbai
By Unnikrishnan Nair, Sandeep S. Nikam, Sanjay D. Patil, Prabir C. Basu
"Mumbai Metropolitan Region Development Authority (MMRDA) entrusted to implement Monorail Systems in various parts of Mumbai Metropolitan Region (MMR) with the objective to supplement the present tran
Jan 1, 2015
-
Jet Grout For Soil Mass Stabilisation To Support Power Plant Foundation
By Vishal Pathak, Shailesh A. Godhuly
Ground Modification System in terms of Jet Grouting for soil strengthening and mass stabilization was engaged for a power plant project in an international power project, engineered by L&T-S&L. The si
Sep 1, 2022
-
Installation Checklist For Driving Mega Piles
By Douglas L. Scaggs
Over the past several years, pile foundations have grown to meet the demands of larger and heavier structures. As the foundations have grown, so has the need for larger and more robust piles to carry
Jan 1, 2013
-
Case Study: Design, Installation And Quality Assurance Testing Of High Capacity Socketed Piles In A Complex Geologic Environment
By Thomas M. Caruso
Construction of a new ship dock at a major Philadelphia area refinery required geotechnical design and field consultation. The new dock, which consists of a system of mooring dolphins and platforms,
Jan 1, 2008