Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Discount rates and risk assessment in mineral project evaluations

    By Lawrence Devon Smith

    "The concept of risk is well established in the mining industry. It is acknowledged when estimates of reserves are expressed as proven or probable, when mining and metallurgical recoveries are applied

    Jan 1, 2003

  • CIM
    H.D.P.E. Piping in the Mining Industry

    By J. R. Eastwood

    "H.D.P.E. Piping in the Mining IndustryThere has been much use· ms.de of high density polyethylene pipe in the mining industry over the past several years. This is not only in new installations but al

    Jan 1, 1975

  • CIM
    A Techno-Economic Assessment of the Coal Gold Agglomeration Gold Recovery Process

    By I. G. Townsend, S. A. Buckley, C. I. House

    "SummaryBritish Petroleum plc is developing a new gold recovery process known as coal gold agglomeration (CGA) for the recovery of gold from its ores. Liberated gold grains are recovered with high eff

    Jan 1, 1989

  • CIM
    Determination of Metal and Mineral Flotation Performance at one of Falconbridge’s Base Metal Operations

    By Dominic Fragomeni, Tony DiFeo, Martyn P. Hay

    "As part of an investigation into flotation modelling of industrial scale operations, Falconbridge Ltd organised a “blind” test of the SUPASIM flotation model developed by Eurus Mineral Consultants (E

    Jan 1, 2006

  • CIM
    Closing the loop—Using actual concentrator performance to determine the true value of ore sources

    "The Antamina orebody is a geologically complex, polymetallic skarn located in the Peruvian Andes. A range of copper and copperzinc ores are campaigned separately through the concentrator producing co

    Jan 1, 2005

  • CIM
    A regressive mode of highwall failure in coal strip mines

    By B. Stimpson, K. Kosar, K. Barron

    "A number of high wall failures have occurred in some of the Alberta coal strip mines of a type called by the authors ""Multiple block plane shear slope failure "". They cause rapid deterioration of t

    Jan 1, 1986

  • CIM
    Environmental Factors Related to the Development of a New Uranium Refinery

    By J. P. Jarrell

    Environmental considerations are of increasing importance in determining the acceptability, schedule and cost of expansion ofCanada's uranium processing industry. Environmental considerations mus

    Jan 1, 1979

  • CIM
    Environmental and Financial Savings for Belt Conveyors by Using Paramid as Reinforcing Material.

    By Heidi Beers

    Teijin Limited ? Global technology-driven group operating in six main fields Advanced fibers and composites business group Healthcare business group Trading and retail business group IT business

    Aug 1, 2013

  • CIM
    La Fabrication de fer Préréduit Pour Utilisation au Four à Arc Électrique

    By A. H. Marquis

    Since the start-up of its first Direct Reduction Module in April 1973, S1DBEC has produced over 2 million tons of prereduced iron. During this period, SIDBEC has acquired comprehensive experience in t

    Jan 1, 1979

  • CIM
    The Tectonic, Magmatic and Mineralization History of the Sudbury Structure (4c0ad050-3f5c-4d02-9b1c-381b1fa8e9bb)

    By Harold L. Gibson, Don H. Rousell, Ian R. Jonasson

    "The Sudbury Structure consists of three major components: 1) the Sudbury Basin; 2) the Sudbury Igneous Complex which surrounds the basin as an elliptical collar; and 3) an outer zone of shatter-coned

    Jan 1, 1997

  • CIM
    The Tectonic, Magmatic and Mineralization History of the Sudbury Structure

    By Harold L. Gibson, Don H. Rousell, Ian R. Jonasson

    "Abstract - The Sudbury Structure consists of three major components: 1) the Sudbury Basin; 2) the Sudbury Igneous Complex which surrounds the basin as an elliptical collar; and 3) an outer zone of sh

    Jan 1, 1997

  • CIM
    Slurry Pumping Practice

    By C. A. Horne

    "The transportation of mineral solids in the form of slurry is a subject most of us are associated with and, in fact, live with on a daily basis. The design parameters of slurry systems and most impor

    Jan 1, 1976

  • CIM
    Building the Next Major Iron Ore Mine in the Labrador Trough

    Certain information contained herein regarding Champion Minerals Inc., including management?s assessment of future plans and operations, may constitute forward-looking statements under applicable secu

    May 1, 2011

  • CIM
    Mining at Depth under Weak Rockmass São Bento Mineração S/A Santa Bárbara, MG Brazil

    By Barnard Foo

    Topics of Discussion ?Location ?Production & Mining Operation ?Mineralization ?Mining Method ?Rock Mechanics Issues ?Ground Control Problems ?Numerical Analysis ?RockmassBehaviour ?Conclus

    Feb 1, 2008

  • CIM
    Ore Handling for the McArthur River and Cigar Lake Projects

    By Chuck Edwards

    "The development of two large, high-grade uranium projects has been proposed for northern Saskatchewan. The projects are now under review by a joint federal/provincial panel. The McArthur River projec

    Jan 1, 1997

  • CIM
    Mining Community Sustainability and well-being in British Columbia, Canada

    By Janis A. Shandro

    The mining sector is a major economic driver for Canadian, and British Columbian communities. In parallel strong commitments have been made by industry to the well-being and sustainability of associat

    May 1, 2011

  • CIM
    The Schaft Creek Porphyry Cu-Mo-Au Deposit

    By James Scott

    Outline Deposit Overview and Brief History ?Geologic Setting ?Local Geology ?Petrography ?Geochemistry ?Mineralization ?Geochronology ?Conclusions Deposit Overview ?Porphyry Cu-Mo-Au ?Disco

    May 1, 2006

  • CIM
    Evaluating uncertainty in kimberlite pipe volume by simulating geometry in cylindrical coordinates

    By J. B. Boisvert, P. Oshust

    A significant source of uncertainty in the diamond resource contained in kimberlite pipes is the volume of the pipes. Often the material within a pipe will be mined as ore, leaving the actual geometry

    Jan 1, 2008

  • CIM
    Ground granulated blast-furnace slag for cemented mine backfill: production and evaluation

    By E. Douglas, V. M. Malhotra

    "This report presents the results of a laboratory study undertaken to evaluate ground granulated blast-furnace slag from Algoma Steel Corporation, as a replacement for Portland cement in cemented mine

    Jan 1, 1989

  • CIM
    Numerical Modelling of a Brazilian Disc Test of Layered Rocks using the Combined Finite-Discrete Element Method

    By O. K. Mahabadi

    The scope of this study is to simulate the behaviour of a layered rock sample under standard laboratory Brazilian Disc test using an innovative combined finite-discrete element method (FEM/DEM) resear

    May 1, 2009