Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The George Fisher Project to Increase Recovery in the Mount Isa Lead/Zinc Concentrator

    By K S. Fisher, J D. Pease

    The installation of the George Fisher flowsheet in the lead/zinc concentrator at Mount Isa Mines Limited has recently been completed. The George Fisher flowsheet involved moving flotation capacity fro

    Jan 1, 2000

  • AUSIMM
    A Study of the Compounds Formed during the Setting of Superphosphate Made from a Blend of Christmas Island "A" and Nauru Ores

    By Walker G. S

    A study of the crystalline materials on or near the surface of freshly made or "green" superphosphate granules and mature, "set" superphosphate granules was undertaken using X-ray

    Jan 1, 1980

  • AUSIMM
    Stope Stability at the Big Gossan Skarn Deposit, Papua, Indonesia

    By G de Jong, W Sunyoto, K Sari, P Silalahi

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Big Gossan mine is operated by PT Freeport Indonesia and is one of the largest stope-an

    Mar 18, 2015

  • AUSIMM
    Intrusive rocks associated with Gold Mineralisation in Southeastern Papua New Guinea

    By Clarke DS

    The igneous intrusions in SE Papua New Guinea are part of a sub-volcanic to plutonic, high-K calc-alkaline to shoshonitic suite. High-K andesitic to dacitic intrusives on Misima and Woodlark Isla

    Jan 1, 1991

  • AUSIMM
    Remote Sensing Enhancement Techniques for Exploration

    This backgrounds the methods, and technical terminology, of digital image processing techniques used to write out remote sensing imagery.

    Jan 1, 1983

  • AUSIMM
    Mineral Project Management - A Perspective from Four Decades in the Industry

    By J S. Dunlop

    At its most basic level, minerals project management may be broken down into a series of logical chronological phases, described in this paper as: exploration, discovery; scoping and pre-feasibility;

    Jul 15, 2013

  • AUSIMM
    Polymetallic Mineralisation Associated with Cenozoic Volcanism in Northern Puna, Argentina

    By M K. de Brodtkorb

    Late Cenozoic ore deposits æPrecious and base metal-richÆ and æSn-Ag-polymetallicÆ ofNorthern Puna are associated either with Middle Miocene dacitic volcanic-dome complexes or with Upper Miocene dacit

    Jan 1, 1995

  • AUSIMM
    The development and future of BHP Billiton’s Western Australian iron ore geological reconciliation system

    By S J. Loach

    Geological reconciliation is an indispensable part of BHP Billiton’s Western Australian Iron Ore (WAIO) operations. Since 2009 our reconciliations have been calculated in a single, centralised sequel-

    Jul 24, 2017

  • AUSIMM
    Mineralisation and Structural Setting of the Rise and Shine Shear Zone, Otago Schist: Comparisons to the Macraes Deposit

    By D Craw, L Cox, R J. Norris

    The Rise and Shine Shear Zone is a mineralised low-angle deformation zone traceable for at least 7 km through biotite zone schist of the Dunstan Range, central Otago. The zone is commonly believed to

    Jan 1, 2005

  • AUSIMM
    Digital Terrain Modelling for Exploration and Mining

    By H North, J Barringer, S McNeill, D Pairman

    Models of ground surface elevation, slope, aspect, curvature, roughness, deformation, as well as other features are gathered together in the term Digital Terrain Model (DTM). DTMs can be generated fro

    Jan 1, 2000

  • AUSIMM
    The New Technology of Enrichment of a Fine Low-Grade Tungsten from Complex Multi-Metallic Ore

    The New Technology of Enrichment of a Fine Low-Grade Tungsten from Complex Multi-Metallic Ore

    Sep 13, 2010

  • AUSIMM
    Use of Ferro-Wastes in Sinter Making

    By P S. Datta, V N. Misra

    Higher bed height up to 680 mm, including 30 mm hearth layer of sized return sinter and high suction below the grate bars up to 1400 mm WG have resulted in increasing the productivity to a level of 33

    Jan 1, 2002

  • AUSIMM
    Sulphide-Silicate Reactions During Metamorphism of The Nairne Pyrite Deposit

    The mineralogy of the rocks now observed in the Nairne pyrite deposit developed under conditions of internally-controlled sulphur activity during amphibolite facies metamorphism. In the sulphide-defic

    Jan 1, 1969

  • AUSIMM
    Dry processing of magnetic iron ores – addressing cost and environmental issues

    By W Skinner, C G. Kelsey, J R. Kelly

    The iron ore industry has reached the end of an unprecedented period of expansion triggered by China’s demand for iron ore. Lower ore prices have led producers to focus on optimising mining operations

    Jul 24, 2017

  • AUSIMM
    A Strategy for Geophysical Exploration of New Zealand Epithermal Systems

    Geophysical anomalies result from the passage of hydrothermal fluids through rocks. Interpretation of these anomalies, when integrated with available geological and geochemical data, assists the const

    Jan 1, 1993

  • AUSIMM
    Correlations among CO2, Cl, 3He and Heat Discharged from Geothermal Systems of the Taupo Volcanic Zone, New Zealand

    Based on relative CO2, N2, and 3He contents, geothermal systems of the Taupo Volcanic Zone, TVZ, can be subdivided into two major groups: arc-type systems, associated with andesitic magmatism along th

    Jan 1, 1995

  • AUSIMM
    Fissure Vein Structures and Brecciation in the Upper Levels of the Broken Hills Epithermal Au/Ag Deposit, Hauraki Goldfield, New Zealand

    By J L. Mauk

     Broken Hills is an adularia-sericite epithermal Au-Ag deposit, hosted in flow-banded rhyolites and overlying rhyolitic pyroclastic rocks in the eastern Hauraki Goldfield. The 7.1 Ma deposit was

    Jan 1, 2005

  • AUSIMM
    Copper Waste Dump Leaching

    Copper waste dump leaching is growing in importance because of the.large tonnages (up to 250,000 ton/day) of low grade waste rock available from open cut mining of copper deposits and proof that contr

    Jan 1, 1967

  • AUSIMM
    Geological Structure of the Hill 50 Gold Mine

    The Hill 50 Gold Mine is situated at Boogardie, 3 miles on a bearing of 295 degrees from; Mount Magnet township. Mount Magnet lies 300 miles north-north-east of Perth, Western Australia (Fig. 1).The o

    Jan 1, 1960

  • AUSIMM
    Noise Reduction in Compressed Air Driven Fans

    The development of a noise attenuated compressed air driven fan is described. The fan, which employs the jet reaction principle, possesses blade extension pieces which penetrate into an acoustically t

    Jan 1, 1973