    Utilising mine planning to deliver closure landforms through productive movement

    By M Bettison, R Wright, N Taylor

    The primary mine planning focus during early study phases of future mining projects is Life of Asset ore production and grade quality, this will always be the situation. While waste schedule optimisat

    Jul 25, 2018

  • AUSIMM
    Rocktype classification and domaining of complex stratiform Zn-Pb-Ag mineralisation at the George Fisher Mine using high resolution XRF Core scanning

    By R Valenta, I Fahey, M Klawitter, N Spanswick

    Zinc-Lead-Silver (Zn-Pb-Ag) mineralisation at the George Fisher Mine occurs in multiple structurally-disrupted stratiform orebodies hosted within a mid-Proterozoic sequence of calcareous siltstones an

    Nov 21, 2018

  • AUSIMM
    Mechanised Shields for Trenchless Sewer Construction in Singapore

    By Musa MA

    Tunnel excavation for sewer construction long remained a labour intensive, hazardous and costly operation. Even with the of mechanical and semi-mechanical shields for tunnel excavation, many problems

    Jan 1, 1993

  • AUSIMM
    Computer Program for Planning of Mine-Ventilation Systems

    Today the application of computer programs for planning of mine-ventilation and for safety- analysis of ventilation systems is widespread practice in German mining. The computer program for network c

    Jan 1, 1983

  • AUSIMM
    Feasibility Study for a Silicon Industry in Southland

    By D S. Nicholson, T Marshall

    Reserves of high-grade quartz gravel, lignite and timber suitable for the production of silicon metal and ferrosilicon on large scale occur within 40 miles of Bluff Harbour. Undeveloped hydroelectric

    Jan 1, 1971

  • AUSIMM
    Prominent Hill Concentrator - Designed for Operators and Maintainers

    By G Yeowart, P D. Munro

    The Prominent Hill copper-gold concentrator of OZ Minerals Limited in South Australia was built in 2008 and commenced commercial production in early 2009. It has a design ore throughput of eight milli

    Jan 1, 2009

  • AUSIMM
    Feasibility Study for a Solution Industry in Southland

    By Marshall T, Nicholson DS

    Reserves of high-grade quartz gravel, lignite and timber suitable for the production of silicon metal and ferrosilicon on large scale occur within 40 miles of Bluff Harbour. Undeveloped hydroelectric

    Jan 1, 1971

  • AUSIMM
    Characterising the Mining Environment for Underground Mass Mining

    The purposes of defining the mining environment for underground mass mining and the uses of characterisation data are outlined. The requirements for data in the areas of geology, surface and groundwat

    Jan 1, 2000

  • AUSIMM
    Small-Charge Cone-Fracture Technique for Rapid Excavation

    By Fourney W. L, Dick R. D

    A small-charge rapid excavation system employing a novel penetrating cone fracture initiation and propagation technique has been demonstrated to be capable of excavating the hardest of rocks at effi

    Jan 1, 1990

  • AUSIMM
    Exposing Uncertainty in Schedules for Proactive Stockpile Planning

    By C Standing, R Lacourt Rodrigues, C Q

    The value of iron ore depends on the grade of the contaminants. Scheduled iron, and the associated contaminants, provides mine planners with a measure of stockpile feed and blending requirements. Blen

    Jan 1, 2005

  • AUSIMM
    PXI System for Monitoring Longwall Gate Roads Convergence

    By K Matsui, R N. Gupta, H Shimada

    Roof falls and failures of powered supports were major threats at longwall face. Abnormal geological conditions were caused roof falls and shield damage. Therefore continuous monitoring and analysis o

    Jan 1, 2003

  • AUSIMM
    Mathematical Model for Simulation of Seam Gas Drainage

    By Reichman J, Chapman G

    The features of seam gas drainage from the point of view of mathematical modelling are outlined and discussed: 1. The use of conventional single phase gas reservoir simulator for very simplified mode

    Jan 1, 1982

  • AUSIMM
    Australian Design Guidelines for Underground Coal Mining Machinery

    By Teniswood CF, Sheppard I, Mason LG

    An industry initiated project, sponsored by the National Energy Research Development and Demonstration Council, has worked for two years in developing design guidelines for underground coal mining mac

    Jan 1, 1991

  • AUSIMM
    Underground Infrastructure Requirements for Underground Cave Mining Operations

    By A G. L Pratt, G F. Dunstan, A Leonforte

    The selection of the material sizing and mine dewatering systems are important elements in the development of a large-scale, high tonnage (greater than 4 Mt/a) underground hard rock mine. The sizing s

    Jan 1, 2008

  • AUSIMM
    Microprospecting for Minerals of the Platinum Group Elements

    By Woodcock J. T, Rummel P. H, Sparrow G. J, MacRae C. M

    A rapid automated search method, developed for the location of native gold grains in polished sections with a scanning electron microscope (SEM), has been extended to locate platinum group elements

    Jan 1, 1991

  • AUSIMM
    Management of Tailings and Other Wastes for Rehabilitation

    By Leggate J

    In the past many coal mining projects commenced without any consideration being given to eventual site rehabilitation. Now that site rehabilitation is assuming greater importance with changing comm

    Jan 1, 1991

  • AUSIMM
    The Structural and Hydrodynamic Framework for Epithermal Exploration

    By M A. Etheridge

    The evolution of economic precious metal and copper-gold deposits in high-level igneous terranes is dependent on very efficient fluid focussing. This is most readily achieved by contemporaneous deform

    Jan 1, 1995

  • AUSIMM
    Drilling Six Ventilation Shafts for the Porgera Goldmine

    Difficult ground conditions in the area planned for placement of vent rises to the surface at the Porgera Goldmine led engineers directing the project to chose blind shaft boring methods of shaft cons

    Jan 1, 1993

  • AUSIMM
    Planning for Large Scale Bulk Port Development Projects

    This paper discusses design concepts in planning a large modern bulk terminal. The need is emphasised for a studied master plan, in-built materials handling flexibility and staged development. An

    Jan 1, 1983

  • AUSIMM
    Highwall Trench Mining Research: Implications for Mine Planning

    Results from current NERDDC funded research into the geotechnology of highwall trench mining methods have clear implications for mine planners in the areas of blast design, trench shape, location of t

    Jan 1, 1992