Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Recommissioning of the Treatment Plant at Mary Kathleen Uranium Ltd.

    The recommissioning of the plant at Mary Kathleen involved several distinct phases. The previous plant process was modified significantly, the plant capacity was increased by the addition of new eq

    Jan 1, 1978

  • AUSIMM
    Blast Optimisation for Downstream Processes - Heavy ANFO in Small Diameter Holes

    Whilst employed by Dyno Nobel as the Technical Services Engineer û Brisbane, I was asked, as part of a contractual agreement, to look at optimising PioneerÆs blasting process to provide the most effec

    Jan 1, 1999

  • AUSIMM
    The Development of a Low Shock Energy Ammonium Nitrate Based Explosive (8713d132-bd41-4f8d-9030-9017776cdfb9)

    By Moxon N. T

    The detonation pressure of ANFO can be significantly reduced by the addition of low density materials such as polystyrene, bagasse, swadust or perlite. Laboratory and field test results have shown t

    Jan 1, 1989

  • AUSIMM
    Improving Consistency of Delivery at Mt Rawdon Operation

    By M Boon, M Franklin

    This paper outlines the journey of cultural maturation and management system development at the Mt Rawdon (MRO) gold mine from its acquisition by Evolution Mining Limited (Evolution) in late 2011 to 2

    Jun 22, 2016

  • AUSIMM
    Options for Concentrate Drying Technologies when Designing a Copper Smelter

    By H Lehtonen, H Mansikkaviita

    In primary copper smelters, the received copper concentrate and other materials contain a certain amount of moisture, ranging from six to 14 per cent. Moisture in wet concentrate has a negative effect

    Jan 1, 2006

  • AUSIMM
    Maximising the Output of a Surface Bulk Air Cooling Installation on a South African Mine

    By T Baard, A Pieters

    This paper deals with the design and implementation of a 17 MW (nominal) surface cooling installation at Impala Platinum No 14 shaft located in Rustenburg, North West Province, South Africa.The coolin

    Jan 1, 2005

  • AUSIMM
    Dredger drop impact on slope stability – Hazelwood Mine

    By J Stipcevich, N Patel, J Faithful5, S Narendranathan, L Tatnell4

    ENGIE, the current owner and operator of the Hazelwood Open Cut coalmine, are in the process of rehabilitating the mine site in preparation for mine closure. Bucket wheel excavators (dredgers) used du

    Jun 21, 2022

  • AUSIMM
    Geological and Geotechnical Characteristics of the Corridor Sands Deposits in Mozambique

    By H R. Pein

    "The Corridor Sands deposit is situated approximately 190 km north east of Maputo, Mozambique adjacent to the paleo-mouth of the Limpopo River. This deposit is one of the worldÆs largest known economi

    Jan 1, 2001

  • AUSIMM
    The Impact of Controlled Blending at the Leinster Nickel Concentrator

    By Johnston S

    A blending trial was conducted on 60 per cent Perseverance/40 per cent Rockys Reward underground ore at WMC Resources Leinster Nickel Operations to compare the benefits between batching and blending

    Jan 1, 1997

  • AUSIMM
    The Influence of Textural Variation and Gangue Mineralogy on Recovery of Copper by Flotation from Porphyry Ore - A Review

    By A F. Cropp, D J. Bradshaw, W R. Goodall

    Mineralogy and critically the texture of both the ore and gangue phases are of paramount importance in the flotation recovery of copper from porphyry ores. Mineralogy and texture will define the theor

    Sep 29, 2013

  • AUSIMM
    Why risk assessment and safety climate measurement are essential for psychosocial safety

    By A Fern, A Hawkes, o, T Vincent

    The modern workplace has changed dramatically in recent years with an increased emphasis on the psychological well-being of employees. While adhering to a certain standard of psychosocial safety at wo

    Apr 16, 2024

  • AUSIMM
    Optimising the Telfer Pyrite Regrind Circuit – Effect of Dissolved Oxygen Demand

    By D R. Seaman, B Adamson, P Sharman, M McMahon

    "The Telfer processing plant commissioned its pyrite regrind and flotation circuit in August 2012. The circuit was designed to regrind pyrite concentrate to a p80 of <30µm then float a gold

    Oct 10, 2016

  • AUSIMM
    Ore Mineralogy and its Relevance for the Selection of Concentration Methods in the Processing of Brazilian Iron Ores

    By C C. Souza, S C. Amarante, A C. Arauj

    All major companies now producing iron ore in Brazil currently employ or are planning to employ some sort of concentration method to upgrade their fine sized products (sinter feed fines and pellet fee

    Jan 1, 2002

  • AUSIMM
    Washability modelling and estimation techniques used to improve coal handling preparation plant beneficiation

    By P J. Handley

    "Predicting how coal seams will be beneficiated through the coal handling processing plant (CHPP) has long been challenging within BHP Coal. Various coal seams from different areas are mined and stock

    Sep 20, 2017

  • AUSIMM
    Alternatives to Conditional Simulation for the Estimation of Iron Grade Distributions ù A Case Study From BHP BillitonÆs Mt Whaleback Operations

    Conditional simulation can be used to determine the probabilities of block iron-grades being above selected cut-offs. However, there are much faster alternatives that can produce acceptable results. I

    Jan 1, 2005

  • AUSIMM
    Material handling testing and control system requirements for dry stack tailings

    By R Stefansen, T Wisdom, A Nicholson, K Rahal

    The challenges of increasingly scarce water resources and the risk of dam failures has seen the mining industry turn to sustainable tailings management solutions such as dewatering and dry stacking. F

    Jul 23, 2018

  • AUSIMM
    Improved assurance for Mineral Resource and Ore Reserve estimates and reporting through peer review and auditing

    By M A. Noppé

    Mining is inherently a risk-based business and risk governance is an integral part of corporate assurance and business decision-making. Mineral Resources and Ore Reserves are the key assets for a mine

    Sep 20, 2017

  • AUSIMM
    Cadia East Open Pit Project Mining Study

    The Cadia Valley Operations currently hosts a large operational open pit, a large operational sublevel caving underground mine and two other underground projects at the study stage. This scenario crea

    Jan 1, 2007

  • AUSIMM
    Design and operation of large drum scrubbers

    By G S. Beros, K M. Edwards

    Over the past 20 years drum scrubbers have become a widely adopted technology within iron ore beneficiation plants. Generally, the drum scrubbers in use are considered high-capacity machines capable o

    Sep 18, 2023

  • AUSIMM
    Liquefaction behaviour of tailings under cyclic simple shear testing

    By A Li, H Jinto, M Laxman

    The behaviour of tailings under cyclic loading has an impact on the stability and deformation of tailings dams and a good understanding of the cyclic behaviour of the tailings under earthquakes is imp

    Jul 23, 2018